Date: 11-02-2024
Demand Report
Average Demand (MW) Average Demand Maximum Demand
2023-24 2022-23 2023-24 2022-23 2023-24 2022-23 2023-24 2022-23 Max Demand
Entity Increase Increase Max Demand Diff Diff Last week Diff Diff
04-02-24 10-02-24 11-02-24 12-02-24 (MW) (%) (MW) (MW) (%) (MW) (MW) (%)
04-02-24 04-02-23 10-02-24 10-02-23 11-02-24 11-02-23 12-02-24 12-02-23 Prev day last week
HR 5068 5879 6332 6098 5845 5963 0 5329 -488 -7.7 7752 -210 -2.6 6102 1650 27.0
DEL 3153 2904 3117 2858 2996 2733 0 2677 -121 -3.9 4521 -52 -1.1 4861 -340 -7.0
UP 13005 13275 13680 13732 13605 13704 0 12855 -76 -0.6 18120 -444 -2.4 17179 941 5.5
NR 45083 45792 49375 47250 48083 46750 0 45125 -1292 -2.6 60225 -1748 -2.8 56729 3496 6.2
ALL INDIA 173.98 169.88 184.68 175.21 177.52 174.79 0.00 169.54 -7.16 -3.9 210.29 -6.7 -3.1 206.3 4 1.9
GW
ISGS (LT+MT) (MW) BILT (MW) PX (MW) Entity Date Peak Maximum Demand
Avg Max Min Avg Max Min Avg HR 18-08-23 12830
3530 0 0 0 106 -715 -50 DEL 29-06-22 7770
UP 25-07-23 28553
RTM (MW) Internal UI Total Drawl (MW) NR 18-08-23 81097
Max Min Avg Avg Avg Avg ALL INDIA 01-09-23 239.98
529 -360 -9 2398 -25 5844
Entity Date Maximum Average Demand
STATE: DELHI HR 18-08-23 11378
DEL 28-06-22 6397
ISGS (LT+MT) (MW) BILT (MW) PX (MW) UP 03-09-23 24167
Avg Max Min Avg Max Min Avg NR 04-09-23 74838
2820 -37 -275 -157 107 -620 -144 ALL INDIA 01-09-23 217.44
RTM (MW) Internal UI Total Drawl (MW) ACP: - Max : 10.00 (Rs/KWh) ACP: - Max : 10.00 (Rs/KWh)
Max Min Avg Avg Avg Avg 11-02-24 Min: 2.88 (Rs/KWh) 12-02-24 Min: 2.59 (Rs/KWh)
260 -376 -103 585 -5 2996 Ave: 4.13 (Rs/KWh) Ave: 5.90 (Rs/KWh)
OverInjection UnderInjection
Nos of Blocks Nos of Blocks Net Gain
Freq Band
Nos of Blocks with Dev More Nos of Blocks with Dev More Rs.Lacs
than 10% or 100 than 10% or
MW 100 MW
F<=49.90 1 0 0 0 0.14
49.90<F<49.95 6 0 0 0 0.13
49.95<=F<=50.03 41 0 38 0 0.02
50.03<F<50.05 0 0 3 0 0.13
F>=50.05 0 0 7 0 0.90
Total 48 0 48 0 1.31
Freq Band Over Injection Block nos. Under Injection Block nos.
F<=49.90
49.90<F<49.95
50.03<F<50.05
F>=50.05
ARAVALI POWER COMPANY PRIVATE LIMITED
Ramp Assessment
FIN. YEAR 2023-24
Tm Td Td/Tm ROE
Month D E F AARR E/D F/D Change
Apr-23 2798 2681 0.96 101 62 69 0.97 0.61 0.68 -0.25
Total no of Ramp: 6
Ramp Achieved: 5
(3 Ramp Up & 2 Ramp Down)
(3 Ramp Up & 2 Ramp Down)
Min Requirement of F/D is 0.75
Ramp not Achieved: 1 (1 Ramp Down)
ARAVALI POWER COMPANY PRIVATE LIMITED
IGSTPP, JHAJJAR
Net
Date MU SRAS SRAS Variable Mark Up Charges Amount Fuel
Net Gain
UP DOWN Charges Receivable Receivable Receivable / Expenditure
Payable
05-02-2024 -0.466 128.143 594.220 5,68,568 56,857 6,25,425 23,72,899 -20,52,139 3,04,666
10-02-2024 -1.148 42.948 1190.678 1,90,558 19,056 2,09,614 47,54,732 -50,53,455 5,08,337
April-23 -27.629 4406.168 32035.038 1.94 0.22 2.85 10.88 -11.59 2.87
May-23 2.153 24890.505 22737.878 10.44 1.24 15.57 7.24 0.96 3.49
June-23 -3.613 52487.920 56101.383 22.90 2.29 25.19 21.89 -1.67 4.98
July-23 75.816 101421.423 25605.325 47.53 4.75 52.29 10.67 33.50 8.12
August-23 -17.680 21972.108 39652.118 10.45 1.05 11.50 16.53 -7.86 2.82
Sept-23 -27.741 7368.105 35109.338 3.30 0.33 3.63 14.19 -12.09 1.54
Oct-23 -26.725 9931.213 36656.098 4.35 0.44 4.79 14.56 -11.35 1.58
Nov-23 22.209 26542.715 4333.558 11.43 1.14 12.57 1.70 9.43 1.44
Dec-23 0.320 657.223 337.325 0.28 0.03 0.31 0.13 0.14 0.04
Jan-24 -15.097 3025.648 18122.525 1.31 0.13 1.45 7.12 -6.65 0.97
Feb-24 -11.127 272.730 11400.000 0.12 0.01 0.13 4.55 -4.90 0.48
Total -29.115 252975.755 282090.583 114.07 11.63 130.27 109.46 -12.09 28.33
SRAS (AGC) Performance
DATE SRAS (AGC) Performance in % Loading Factor %
28-01-2024 >100 (90.82/117.79/SD) 74.44
29-01-2024 90.52 (78.34/102.33/SD) 82.32
30-01-2024 61.17 (63.67/58.06/SD) 86.85
31-01-2024 93.43 (77.45/108.35/SD) 81.67
01-02-2024 93.47 (84.8/100.84/SD) 74.47
02-02-2024 85.71 (73.96/98.19/SD) 80.70
03-02-2024 82.84 (69.87/95.55/SD) 83.25
04-02-2024 97.89 (95.32/99.24/SD) 72.73
05-02-2024 89.34 (76.76/101.74/SD) 75.23
06-02-2024 86.22 (84.94/85.03/SD) 80.43
07-02-2024 87.16 (76.26/98.4/SD) 75.12
08-02-2024 >100 (128.51/91.0/SD) 74.7
09-02-2024 84.07 (80.22/86.18/SD) 78.81
10-02-2024 66.99 (53.38/80.65/SD) 74.84
11-02-2024 89.72 (81.63/97.18/SD) 65.12
Operation Parameters
UOM Daily Monthly FY 23-24
Cond. Gain
U#1-74
U#2-89
(Design cap-268(250
Mill Avg.Capacity Data (Design cap-67 T/Hr) (DESIGN 221-292 C) (DESIGN 66-90 C)
MW) - 309(500 MW) C)
MINIMUM MILL
Mill AVERAGE PA
Design 129 A 11-02-2024 OUTLET
FLOW (TPH)
TEMPERATURE
MILL INLET MILL OUTLET
Maximum AVERAGE AVERAGE
Mill Maximum Average Coal PAPH OUTLET AIR
Unit No. Mill Description Running Hr Coal Flow TEMPERATURE TEMPERATURE
Current (A) Flow (TPH) TEMP
(TPH)
318
JLN Canal
Evaporation 7622
0
Reservoir From
RW (ASH) 7621 CWBD
0 318
RW (PT)
38594
1608 2735 0
114 0