Shehbaz Hussain – E2ECOM

07-11 August
The Smart Wires logo, Power Flow Control for the Grid, Power Guardian, PowerLine Coordinator, PowerLine Gateway, PowerLine Guardian, SmartBypass and SmartValve are trademarks of Smart Wires Inc. © 2022 Smart Wires Inc
Smart Wires | Slide 1
Past Week (From last presentation)
07-11 08 2023
Task Status Time Spent (Hrs) Comments
Upgrade v1.04 system to SmartValven104
Completed 3 No issue found
Baseline with CLB
E2ECOM testing on Package 4.2.6 - v104
Completed 4 125 test cases + Exploratory testing
With CLB
E2ECOM testing results statistics added on Add statistics on TestRun, Firmware Document , PPT,
Completed 1
documents JIRA, Polarion.
RAW packets to show in report
Network-011, 005 => Actual time to show in the report
Update Network Packets test case feedbacks Completed 2 Network-002, 003 => Update Return message
Network-012 => verification missing in report

Tested on v104 and UC system. Reports path is


Negative temperature Coefficient (NTC) “\\nas-atm\ATM Data\E2EATM\Automation Reports\v1.04\
Completed 2.5
outlier exception resolved. iiSC\Commons”

Deploy on v103 system by adding process


Update “Tool Status Manager” application for
Completed 1 “EMSApplication” for EMS testing/Automation as requested
EMSApplication
by AHMED SB

Successes: Issues:
1. Upgrade the v1.04 System to SmartValven104 baseline with 1. SB Line current is not applying by sensor simulator on UC system.
CLB.
Lesson Learned:
2. Negative temperature Coefficient (NTC) outlier exception
resolved. 1. Debugging

Smart Wires | Slide 2


Automation Coverage v1.04 – (10-1800)
Date – Domain that is updated
Stream Total Test Total (Not Total Total Valid for Automated Remaining Automation Automation
Cases Obsolete) Automation Automation Count Valid Coverage Count
Blockages Increment
(From Last
Week)

iiDCE 868 735 48 687 363 324 53%

iiSC 1540 1174 179 995 806 189 80%

iiGD 196 164 68 96 96 0 100%

CLB 79 79 7 72 72 0 100%

E2ECOM 207 206 33 173 173 0 100%

SmartInterface 2446 2411 344 2068 982 1099 55.18%

EMS 599 567 197 370 150 220 40%

Smart Wires | Slide 3


Next Weeks (Till Next Presentation)
15-31 08 2023

Targeted Tasks:

Task Status Comments

E2ECOM Testing for Package 2.3.9

E2ECOM – v1.04 API Review

Blockages you see:


1. PLC Simulated firmware required for VD setup

Smart Wires | Slide 4