PATAN

HYDROPOWER
PROJECT
PATAN HPP-PROJECT LOCATION

Patan Hydropower Project is located on


Indus River in Kohistan District, KP,
275km from Islamabad.
PATAN HYDROPOWER PROJECT - BACKGROUND

The Project was identified by MONENCO in “Inventory


Identification and Ranking Study” in November 1984 for a capacity of
(In Early 80s) 1172 MW.

 Consultant’s JV of Lahmeyer Intl. (Lead Firm)-


Feasibility Study Germany, NDC, BAK in Association with KEC
(Dec 2015)  For capacity of 2,400 MW
PATAN HYDROPOWER PROJECT – SALIENT FEATURES
Installed Capacity 2,400 MW
Dam Height 105 m, Concrete Gravity
Gross Head 98 m
Design Discharge 2,800 m3/sec
Mean Annual Energy 12,500 GWh
No. of Headrace Tunnels 05
No of Units 10
Length of Headrace Tunnel 206 m
Length of Tailrace Tunnel 4.55 km
Project Cost (Price Index-2015) US $ 4,570 Million
(without Transmission line)
Plant Factor 59 %
Construction Period 6 Years
PATAN HYDROPOWER PROJECT – FINALIZED LAYOUT
Diversion Tunnels

DAM

CAVERN POWER HOUSE

Km
5 .5
5x
S=
EL
UNN
T
CE
I L RA
TA
PATAN HPP – LOCATION OF PATAN HPP ON INDUS CASCADE
VIEW OF INDUS VALLEY WHICH CONTAIN PATAN HPP
PATAN HPP-ALTERNATE STUDY

8
ALTERNATE STUDY

Preferred Alternative 9
PATAN HYDROPOWER PROJECT COMPONENTS

• Reservoir
• River Diversion
• Concrete Gravity Dam
• High Level Spillway (Gated Weir, Chute, Roller Bucket)
• Mid Level Spillway (Gated Barrel Openings through Dam)
• Power Intake
• Powerhouse
• Tailrace Tunnels
• GIS & Take-off Yard
PATAN HYDROPOWER PROJECT – RIVER DIVERSION

• U/s RCC cofferdam, crest elevation 696.0masl, circa 31m high.


• D/s RCC cofferdam, crest elevation 683.5masl, circa 19m high.
• Two (2) concrete lined tunnels, horseshoe profile, 14.2m inside
diameter, 685m and 775m length.

• Discharge capacity 5,000 m3/s,

11
PATAN HYDROPOWER PROJECT – FINALIZED LAYOUT
PATAN HYDROPOWER PROJECT – CONCRETE GRAVITY DAM

Crest elevation: 772.0 masl.


Lowest foundation elevation: 650.0 masl.
Dam height above lowest 122m
foundation 454,000 m3 (overburden
Total surface excavation: 48% & rock 52%).

1.00 M m3 total RCC fill.


220,000 m3 conventional & abrasive
resistant concrete.

13
PATAN HYDROPOWER PROJECT – HIGH LEVEL SPILLWAY

• 6 bays, each 16.5m wide with radial gate on sill


elevation 740.8 masl retaining FSL 762.8 masl.

• Discharge capacity 6 x 3,320 m3/s = 19,900 m3/s at


WL 762.8 masl.

• Total plunge pool excavation: 411,000 m3


(overburden 38% & rock 62%).

14
PATAN HYDROPOWER PROJECT – MID LEVEL SPILLWAY

• 3 no. barrels through dam body, each 12m wide,


10m high with radial gate on sill elevation 715.0
masl.

• Discharge capacity 3 x 3,120 m3/s = 9,400 m3/s at


WL 762.8 masl.

15
PATAN HYDROPOWER PROJECT – DAM AREA LAYOUT
PATAN HYDROPOWER PROJECT – DAM AREA PLAN
PATAN HPP– DAM AXIS LONGITUDNAL PROFILE
PATAN HYDROPOWER PROJECT– HIGH LEVEL SPILLWAY
PATAN HYDROPOWER PROJECT– MID LEVEL SPILLWAY
PATAN HYDROPOWER PROJECT – POWER INTAKE FLUSHING

• 2 no. barrels through dam body, each 4.00m wide,


6.00m high with radial gate on sill elevation 696.0
masl.

• Discharge capacity:2 x 595 m3/s = 1,190 m3/s at


WL 762.8 masl.

21
PATAN HYDROPOWER PROJECT– POWER INTAKE FLUSHING
PATAN HYDROPOWER PROJECT– POWER INTAKE FLUSHING
TUTUNNELS LONGITUDNAL SECTION
PATAN HPP– HEADRACE POWER WATER WAYS
• No. of waterways: 5.

• Total rated discharge: 2,800 m3/s, 560 m3/s each waterway.

• Five barrel bell-mouth power intake, trashrack, maintenance


stoplogs.

• Headrace tunnel and pressure shaft and tunnel: 5 no. concrete


lined, 12.0m finished diameter, circa 242m total length.

• Headrace penstock tunnel: 5 no. steel lined, 6.3m finished


diameter, circa 65m total length.

• Total underground excavation for headrace waterways (tunnels,


shafts, manifolds): 235,000 m3.
24
PATAN HYDROPOWER PROJECT– OVERALL POWER
WATERWAYS LONGITUDNAL PROFILE
PATAN HPP– POWER WATERWAY LONGITUDNAL PROFILE
PATAN HYDROPOWER PROJECT– POWER WATERWAY
GEOMETRIC PLAN
PATAN HPP– SURGE CHAMBER

• Number: 5

• Tank dimensions (rounded): 39m diameter, 80m


height.

• Throttle diameter: 8m.

• Underground excavation: 519,000m3.

28
PATAN HYDROPOWER PROJECT– SURGE CHAMBER
PATAN HPP– POWER CAVERN, TRANSFORMER CAVERN

• Power cavern dimensions (rounded): 346m long, 26m wide, 56m


high.

• Transformer cavern dimensions (rnd’d): 300m long, 19m wide, 35m


high.

• 10 x Francis vertical axis turbine units each 243 MW.

• 10 x 265MVA generators, 31 x single phase 11kV/500kV transformers.

• Total underground excavation for both caverns and all associated


tunnels and adits: 882,000 m3.

30
PATAN HPP– POWER HOUSE CAVERN X-SECTION
PATAN HPP– POWER HOUSE CAVERN LONGITUDNAL
SECTION
PATAN HPP– TAILRACE POWER WATERWAYS

• No. of waterways: 5 @ 5.5 km each

• Total rated discharge: 2,800 m3/s, 560 m3/s each waterway.

• Shotcrete/concrete lined (80%:20%).

• Shotcrete section: 14.0m x 14.0m D-shape, 3,645m (L) each


waterway.

• Concrete section: 12.0m x 12.0m horseshoe, 910m (L) each waterway

• Total underground excavation tailrace waterways: 4.22 Mm3.

33
PATAN HYDROPOWER PROJECT – FINALIZED LAYOUT WITH
TAILRACE WATERWAYS
Diversion Tunnels

DAM

Km
.5 CAVERN POWER HOUSE

5 x5
LS=
NNE
TU
ACE
I LR
TA
PATAN HYDROPOWER PROJECT -RESERVOIR

• FSL 762.8 masl, MOL 752.8 masl,

• Capacity at FSL: 270 Mm3.

• Capacity at MOL: 200 Mm3.

• Active (live) storage: 70 Mm3.

• Surface area at FSL: 7.25 Mm2 (= 725 ha).

• Length at FSL: 30km (from Dasu tailrace outfall to Patan dam).


PATAN HPP-CLIMATE & HYDROLOGY

• Normal maximum monthly air temperature at dam site in summer: 38°C.


• Normal minimum monthly air temperature at dam site in winter: 6°C.
• Mean annual rainfall over catchment: 100mm to 800mm.
• Mean flow at dam site: 2,258 m3/s (equivalent to 439 mm/year run-off).
• Average annual flood at dam site: 10,480 m3/s.
• Once in 10 year flood at dam site: 13,190 m3/s.
• Once in 100 year flood at dam site: 16,580 m3/s.
• Once in 1,000 year flood at dam site: 19,900 m3/s.
• Water level at mean flow in Indus at dam site: 678.0 masl.
• Water level at mean flow in Indus at tailrace outfall: 657.2 masl.
• Suspended sediment yield at dam site: 197 million t/year.
• Bed load sediment yield at dam site: 20 million t/year.
PATAN HPP – SEISMIC PARAMETERS

• Strongest recorded local earthquake: 7.6 MS, 88 to 95km distant.

• Design horizontal PGA values: OBE – 0.224g, SEE – 0.306g

• Design vertical PGA values: OBE – 0.202g,SEE – 0.275g

37
PATAN HPP-DETAILS OF INVESTIGATIONAL DRILLING
• Rotary core drilling at the sites of the main project structures. Drilling
recovered a total of 2,453.5m of 76mmΦ rock core from 19 boreholes, as
follows:
• 5 boreholes, including on in the river, along the preferred dam axis (PDH–
05, 06, 07, 08 & 10).
• 2 boreholes in the river at the upstream and downstream diversion
cofferdams (PDH–09 & 11).
• 3 boreholes on the left valley abutment on upstream alternative dam axes
(PDH-01, 02 & 03).
• 2 boreholes on the left abutment, upstream of the preferred dam axis at
the power intake (PDH-04 & PDH-04A).
• 2 deep boreholes high on the left abutment that drilled into the power
cavern (PDH-12 A & 13).
• 2 boreholes at the outfall portal of the tailrace tunnels (PDH-14 & 15).
• 3 boreholes through the Patan Fault Zone close to where it will be
crossed by the five tailrace tunnels (PDH-16, 17 & 18).
PATAN HPP- INVESTIGATIONAL PLAN
THAKOT- I HYDROPOWER PROJECT - STATUS

PC-II amounting to Rs. 1,146.477 Million has been submitted to


SRC, WAPDA on 26.10.2022 for Clearance

ADB has shown willingness for Detailed Engineering Design


through Project Readiness Financing (PRF) being Patan HPP as
priority 1.

ADB team for Technical validity visited the Project Site on


28.10.2022.

Gap Analysis for Patan HPP for finalization of TOR’s for Design
Consultants have been finalized by ADB Team Expert.
BROAD CONTOURS OF GAP ANALYSIS
• During Gap Analysis, following has been reviewed for updation during detailed
Engineering Design of the Projects:
• Topography
• Hydrology
• Climate Change
• Sedimentology
• Glacial Lake Outburst Flood
• Geology, Geotechnics and Related Field Investigations
• Seismicity and Seismic Design
• Hydraulic Design
• Reservoir Sedimentation Management
• Construction Planning
• Social and Environmental Impacts

• Capacity building of WAPDA for international trainings, software provision, Contract


41
management, procurement have also been discussed during meetings.
VISIT PHOTOGRAPHS

42
VISIT PHOTOGRAPHS

43
THAKOT- I HPP – TRANSMISSION LINE

55km long, 2 x 500kv single circuits to the proposed


switchyard at thakot HPP.
THAKOT- I HYDROPOWER PROJECT – COST ESTIMATES
COST (MILLION
Item
US$)
Total Cost of Civil Works 1,790
Total Cost of Hydraulic Steel Structures, Mechanical & Electrical 1,310
Works
Total Cost of Environment, Resettlement and Security 85
TOTAL BASIC PROJECT COST 3,185
Construction Insurance 255
Customs Duty 56
Interest during Construction 992
Commitment Fees 46
Upfront Fee 37
TOTAL INVESTMENT COST 4,570

EIRR 41% B/C Ratio 4.05


FIRR 12.9% Payback Period 07 Years
Unit Cost 4.10 Cent/kWh
PATAN HYDROPOWER PROJECT –IMPACTS

TOTAL LAND
REQUIREMENT LOSS OF
INCLUDING BUILDINGS Resettlement
RESERVOIR

 1975 Acres  75 Households (800


 80 Nos.
to 900 persons)
THANKS