HYDROPOWER
PROJECT
PATAN HPP-PROJECT LOCATION
DAM
Km
5 .5
5x
S=
EL
UNN
T
CE
I L RA
TA
PATAN HPP – LOCATION OF PATAN HPP ON INDUS CASCADE
VIEW OF INDUS VALLEY WHICH CONTAIN PATAN HPP
PATAN HPP-ALTERNATE STUDY
8
ALTERNATE STUDY
Preferred Alternative 9
PATAN HYDROPOWER PROJECT COMPONENTS
• Reservoir
• River Diversion
• Concrete Gravity Dam
• High Level Spillway (Gated Weir, Chute, Roller Bucket)
• Mid Level Spillway (Gated Barrel Openings through Dam)
• Power Intake
• Powerhouse
• Tailrace Tunnels
• GIS & Take-off Yard
PATAN HYDROPOWER PROJECT – RIVER DIVERSION
11
PATAN HYDROPOWER PROJECT – FINALIZED LAYOUT
PATAN HYDROPOWER PROJECT – CONCRETE GRAVITY DAM
13
PATAN HYDROPOWER PROJECT – HIGH LEVEL SPILLWAY
14
PATAN HYDROPOWER PROJECT – MID LEVEL SPILLWAY
15
PATAN HYDROPOWER PROJECT – DAM AREA LAYOUT
PATAN HYDROPOWER PROJECT – DAM AREA PLAN
PATAN HPP– DAM AXIS LONGITUDNAL PROFILE
PATAN HYDROPOWER PROJECT– HIGH LEVEL SPILLWAY
PATAN HYDROPOWER PROJECT– MID LEVEL SPILLWAY
PATAN HYDROPOWER PROJECT – POWER INTAKE FLUSHING
21
PATAN HYDROPOWER PROJECT– POWER INTAKE FLUSHING
PATAN HYDROPOWER PROJECT– POWER INTAKE FLUSHING
TUTUNNELS LONGITUDNAL SECTION
PATAN HPP– HEADRACE POWER WATER WAYS
• No. of waterways: 5.
• Number: 5
28
PATAN HYDROPOWER PROJECT– SURGE CHAMBER
PATAN HPP– POWER CAVERN, TRANSFORMER CAVERN
30
PATAN HPP– POWER HOUSE CAVERN X-SECTION
PATAN HPP– POWER HOUSE CAVERN LONGITUDNAL
SECTION
PATAN HPP– TAILRACE POWER WATERWAYS
33
PATAN HYDROPOWER PROJECT – FINALIZED LAYOUT WITH
TAILRACE WATERWAYS
Diversion Tunnels
DAM
Km
.5 CAVERN POWER HOUSE
5 x5
LS=
NNE
TU
ACE
I LR
TA
PATAN HYDROPOWER PROJECT -RESERVOIR
37
PATAN HPP-DETAILS OF INVESTIGATIONAL DRILLING
• Rotary core drilling at the sites of the main project structures. Drilling
recovered a total of 2,453.5m of 76mmΦ rock core from 19 boreholes, as
follows:
• 5 boreholes, including on in the river, along the preferred dam axis (PDH–
05, 06, 07, 08 & 10).
• 2 boreholes in the river at the upstream and downstream diversion
cofferdams (PDH–09 & 11).
• 3 boreholes on the left valley abutment on upstream alternative dam axes
(PDH-01, 02 & 03).
• 2 boreholes on the left abutment, upstream of the preferred dam axis at
the power intake (PDH-04 & PDH-04A).
• 2 deep boreholes high on the left abutment that drilled into the power
cavern (PDH-12 A & 13).
• 2 boreholes at the outfall portal of the tailrace tunnels (PDH-14 & 15).
• 3 boreholes through the Patan Fault Zone close to where it will be
crossed by the five tailrace tunnels (PDH-16, 17 & 18).
PATAN HPP- INVESTIGATIONAL PLAN
THAKOT- I HYDROPOWER PROJECT - STATUS
Gap Analysis for Patan HPP for finalization of TOR’s for Design
Consultants have been finalized by ADB Team Expert.
BROAD CONTOURS OF GAP ANALYSIS
• During Gap Analysis, following has been reviewed for updation during detailed
Engineering Design of the Projects:
• Topography
• Hydrology
• Climate Change
• Sedimentology
• Glacial Lake Outburst Flood
• Geology, Geotechnics and Related Field Investigations
• Seismicity and Seismic Design
• Hydraulic Design
• Reservoir Sedimentation Management
• Construction Planning
• Social and Environmental Impacts
42
VISIT PHOTOGRAPHS
43
THAKOT- I HPP – TRANSMISSION LINE
TOTAL LAND
REQUIREMENT LOSS OF
INCLUDING BUILDINGS Resettlement
RESERVOIR