Azure DR Migration Proposal-HBL Power Systems

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 9

SAP ECC Azure DR

Migration
Proposal l
Confidential: Not for circulation https://delicttech.com

@Delict Technology 2022-23


Agenda

 Project – Scope of work – DR Migration


 Assumptions and Requirement
 DR Setup Configuration - AZURE cloud
 DR Setup - Failover
 High level ECC DR Migration Project Plan Timeline
 Cost of Azure DR Migration
Project – Scope of work – DR Migration

• Migrate the SAP ECC DR systems from existing


environment to Azure Cloud
• SAP Production Server
• Azure Site Recovery – DATA Disk.
• DR Drill – Failover activity - Quarterly
Assumptions and Requirement
Assumptions for Migration
Assuming the existing DB server belongs to on-premise or on-cloud.
The existing DB is a single tenant server – running both the APP and DB in the same VM.
No current archiving strategy for the existing Production Server.
Backups are stored at the DISK level and maintained as per the default retention policy.
No major Network issue from On-Premise to Cloud and if any bottleneck, customer will take care.
Assuming there is no restriction on the Data flow in between the DC and DR environments.
Requirement for Migration
Existing server access to initiate the Azure Site Recovery process in the existing environment.
Azure login credentials are at the initial level for setting up the Azure cloud environment.
Need to know the Replication policy for the Data from DC to DR.
The Azure VMs you replicate need outbound connectivity.
DR Setup Configuration - AZURE cloud

1.The Site Recovery Mobility service extension is automatically installed on the VM.
2.The extension registers the VM with Site Recovery.
3.Continuous replication begins for the VM. Disk writes are immediately transferred to the cache storage account in the source location.
4.Site Recovery processes the data in the cache and sends it to the target storage account or to the replica managed disks.
5.After the data is processed, crash-consistent recovery points are generated every five minutes. App-consistent recovery points are
generated according to the settings specified in the replication policy.
6.Perform test failover for the mock drill.
DR Setup - Failover

 When initiating a failover, the VM for DR will be create in the target resource group, target virtual network, target
subnet, and in the target availability set.
 During a failover, any recovery point can be use.
High level ECC DR Migration Project Plan Timeline
Mandays Count
SL. No. Description 01 02 03 04 05 06 07
1 Azure credential to verify and setup the Azure cloud
2 Azure Site Recovery
3 DR setup for PRD
4 DR Drill or failover testing for PRD
Cost of Azure DR Migration
Thank you

Confidential: Not for circulation https://delicttech.com

@Delict Technology 2022-23