ENTITLED
The success and final outcome of this project required a lot of guidance and assistance from many people
and we are extremely privileged to have this all along the completion of our project. The project was made
possible only due to such supervision and assistance and we would not forget to thank them.
We respect and thank Hon. Prof. Sandeep Vishwarupe, for providing us an opportunity to do the project
work in whole college and giving us all support and guidance which made us complete the project duly.
We are extremely thankful yo him for providing such nice support and guidance, although his schedule
managing the departmental work.
We owe our deep gratitude to our project guide Prof. Ishwar N Khsupe, who took a keen interest on our
project work and guided us all along, till the completion of our project by providing all the necessary
information for developing a good system.
We are thankful to the Sir/Madam and lab assistant of whole college who permitted us to complete our
project in their classrooms and labs.
We heartily thank our project guide, for his guidance and suggestions during this project work.
We are thankful to and fortunate enough to get constant encouragement, support and guidance from all
Teaching staffs pf Electrical Department who helped us in successfully completing our project work. Also,
I would like to extend our sincere thanks to all staff in laboratory for their timely support.
VISION
INSTITUTE:
Transform knowledge into work.
DEPARTMENT:
Develop competent Electrical Technicians and Practising Engineers.
MISSION
INSTITUTE:
DEPARTMENT:
1. INTRODUCTION
INTRODUCTION
ELECTRICAL FIRE SAFETY
AUDIT
OF
GROUND FLOOR OF
COLL
EGE
SR ANALYSIS ANALYSIS STATUS CORRECTIVE
NO. POINT MEASURES TO BE
TAKEN
1. 001: Principal Temporary Connection to be
office connection to made by proper way
Tubelight by using and permanent.
cello tapes.
Thermocol should be
Computer is placed remove.
on thermocol.
Wires should be
Improper arrange by proper
arrangement of way.
wires of the
computer.
Proper rating of MCB
Air Conditioner is is to be provided.
provided without
CB.
2. Main Office Broken switches Switches and sockets
and sockets. should be replaced.
Wires without
Wires should be pass
conduits or
through conduits and
jumbling of wires
there should not be
jumbling of wires
Open distribution
board
Distribution Box
should be enclosed
properly.
ELECTRICAL FIRE SAFETY
AUDIT
OF
FIRST FLOOR OF
COLLEGE
SR LOCATION ANALYSIS STATUS CORRECTIVE
NO MESURES TO BE
TAKEN
1 103 Capping is not Capping should be
Library provided. provided.
Switchboard is Switchboard should
not maintained be replaced.
properly.
Extension board
is not placed on
solid ground
2 104 This room is
Mathematics properly
Department maintained
Staff Room
3 105 Damaged Fan Replace the
Mechanical Regulator. damaged fan
Department regulator
Staff Room
cAse
OP
svuDv
PIEfl AT flSIC HOSPITAL
Information of the fire accident from the News and the
Internet:-
The pipe of which welding was The spot where sparks fell on
carried out by workers. the rubber mats.
The welding machine used for The rubber mats at the fire
welding. accident location.
Fire fighting sprinkler at the Careless hospital authority
place where fire took place.