4.master Scheduling Process - 1
4.master Scheduling Process - 1
4.master Scheduling Process - 1
PROCESS
Continued
Time Fences
Time Fences
Demand Time Fence Planning Time Fence
• Sets the period of the MPS where • Sets the period within which changes
changes are seldom permitted to the MPS must be evaluated by the
• Covers period of actual customer master scheduler.
demand • Combination of actual demand plus
• Usually set to cover the assemble time forecasted demand
for a product or the delivery time for a • Usually set to include material and
service components acquisition time.
Time Fences and their Qualification
2 to 3 weeks Deman 8 to 12 weeks Plannin
Today d Time g Time
Fence Fence
DTF PTF
The Master Scheduling Grid
What is the Master Scheduling Grid?
The Master Scheduling Grid is a rolling plan where the rows represent supply and demand information and
columns represent time period from the present to the end of the planning horizon.
New periods are added at the end of the planning horizon as current periods become history.
Explaining the rows on master scheduling grid
Forecast – anticipated demand for a product within a certain time period.
Customer orders – backlog of planned shipments for the product. This demand is certain and should always
be used in preference to the demand forecast within the demand time fence.
Projected Available Balance (PAB) – An inventory balance projected into the future. It is the running sum of
on-hand or projected inventory minus demand plus supply. A value below safety stock here within the
planning time fence causes the master scheduler to take action by creating an MPS quantity or by
rescheduling.
Available to Promise (ATP) – The uncommitted portion of a company’s inventory and planned production,
maintained in the master scheduling grid to support customer order promising. The ATP quantity is the
uncommitted inventory balance in the first period and is normally calculated for each period in which an
MPS receipt is scheduled.
Master Production Schedule Qty – When the PAB has fallen below the safety stock level an MPS quantity
must be revaluated. This qty becomes the driver for lower level detail planning such as MRP.
The Projected Available Balance.
The projected available balance (PAB) is the projected inventory
quantity in a particular time period.
• Cumulative
In this method it is assumed that inventory can be carried forward.
• First Period
ATP = On hand Qty + MPS receipt qty – Customer orders in this period
• For each other period
ATP = Previous period’s ATP + MPS receipt qty – Customer orders in this period
On Hand = 20
Lot Size = 40
Demand Time Fence = 3
Period 1 2 3 4 5
Forecast 20 20 20 20 20
Customer Orders 18 15 25 10 10
Projected Available balance 20 2 27 2 22 2
ATP non cumulative 2 0 20
ATP cumulative 2 27 2 32 22
MPS receipts 40 40
Look ahead (Backward ATP)
In this method a large order in a future period may be satisfied by “borrowing” from current
available production.
Week 1 2 3 4 5 6 On Hand = 50
Customer orders 80 45 40 50 50 5 Lot Size = 100
PAB 50 70 25 85 35 85 80 Demand Time Fence
MPS receipts 100 100 100 =6
ATP 25 10 45
Week 1 2 3 4 5 6
Customer orders 80 45 60 50 50 5
PAB 50 70 25 65 15 65 60
MPS receipts 100 100 100
ATP 25 -10 45
ATP backward 15 0 45
Scheduling Decisions
MPS FAS FAS
Finished Products
MPS
MTO ATO
MTS
MPS
• Standard products • Products supplied after • MPS is prepared at semi Raw Materials
• Achieve management customer order is finished level where
targets of inventory received. standard modules or
and customer service. • Master scheduler plans subassemblies are
supply of raw materials produced in accordance
• E.g. Tailor shop, Aircraft with a forecast
Relating the Master Scheduling Process to the business
environment
Sr. No. Characteristic Make to Stock Assemble to Order Make to Order Engineer to Order
Over planning of components and Little uncertainty exists after Little uncertainty exists after
8 Handling of demand uncertainty Safety Stock
subassemblies receipt of order receipt of order
Determined by customer
9 Final assembly Schedule Not applicable Determined by customer orders Determined by customer orders
orders
Standard BOM for each
10 Bill of Material Planning BOM BOM unique for each order BOM unique for each order
product
Designing Product Structures
A bill of material is an engineering document that identifies the ingredients or subordinate
components required to physically make each part, formula or assembly.
The organization and presentation of the BOM files is commonly referred to as the structure of
the BOM
Level 1 Bulk
Label Bottle Cap
Solution
Multi Level Bill of Material
Level 0 Packaged
Product
Level 1 Bulk
Label Bottle Cap
Solution
Sound System
Clock Model
0001
Silver Bicycle
Common parts,
Eleven items (3 frames, 4
Frame Saddle Wheel Type Toe Clips
100%
saddles, 2 wheels, 1 option and 1
53 cm, 50%
Men's racing,
Clincher, 65% Yes, 40% common parts module) are
30%
master scheduled. Finished bike
Men's touring,
57 cm, 30%
25%
Tubular, 35% No, 60% would be scheduled using the
Final Assemble Schedule.
Women's racing,
60 cm, 20%
25%
Women's
touring, 20%
Advantages of Planning Bills
More accurate forecasting
Forecasting happens at higher product family level
Reduced number of end items
Number of end items is reduced because items are not assembled till demanded
A more accurate scheduling and planning process
Since forecast is more accurate, MPS can plan and schedule to the component level. The FAS schedules
are based on actual demand. Thus finished goods are reduced and customer service level is improved
Facilitates order entry (configurator)
Order entry is facilitated using modular or configuration codes, even to the point of having the customer
enter this information via internet
Permits two level scheduling
MPS is used for components and FAS is used to assemble to customer demands
More efficient and flexible computer processing
12 bills (3+4+2+2+1) must be maintained rather than 48 (3*4*2*2*1)
Accuracy of Records
Item definition and planning information
Item number, description, unit of measure
Planning related – lot sizes, safety stock, ABC classification
Bills of material
Should be kept as flat as possible
BOM in system should be compared with the bill used in production process
Bills of distribution
Should reflect changes in demand by distribution center so that planning can ensure the correct
assignment of distribution stock by region and by distribution center
Planning bills
Responsibility for maintaining the planning bills resides with the master scheduler
Planning bills should be maintained to reflect the latest choices by the customer
Resource definition
Changes in product specification may require new resources to be defined. Hence resources should be
reviewed periodically.
Equipment efficiency may change in long term. Hence need to be updated.
Resource profiles
Change in product mix may lead to change in resource profiles for average unit of the product family.
Workcenter definition
Workcenter related details (manning, machines available, costs etc) should be kept up to date
Inventory records
Effective cycle count programs should be implemented to maintain inventory accuracy
Demand records
Customer master file – name, address financial information
Accuracy of customer orders
Supply records
To ensure valid order promise dates, supply records should be accurate.
Master Scheduler Responsibilities
Understand the forecasting process and its strengths and limitations
Participate in sales and operations planning process
Manage the constraints of supply capacity
Generate and maintain a realistic master production schedule
Monitor consistency with the production plan
Execute master scheduling policies, such as time fences, safety
stocks, subcontracting and lot-sizing.
Maintain planning bills with up-to-date information about product
mix changes
Identify, negotiate and resolve conflicts
Changes from Demand side affecting MPS