Professional Documents
Culture Documents
DATIAN SUBIC SHOEs INC
DATIAN SUBIC SHOEs INC
The study aimed to analyze the current and past operation and supply chain
management of Datian Subic Shoe Inc. to compare the improvements that happen over
time and to suggest improvements by using 5S. The study was conducted to understand
and present how to solve the current struggle of the supply chain and operation of Datian
Subic Shoe Inc., and to recommend a 5s implementation plan.
5s introduction
5-S practices benefit all aspects of life, including business management.
The benefit of 5-S practices is that they not only improve the working
environment's physical quality but also train employees' thought processes to be
more positive. Most businesses worldwide have demonstrated significant
benefits from 5-S, including enhanced overall organization, productivity,
quality, safety, employee morale, efficient workspace utilization, and cost
optimization.
SORT is called seiri in
Japanese this the 5-S
approach aids in the
removal of items that are
no longer required
SET IN ORDER is
called seiton in Japanese
this 5-S Method also
improves efficiency and
process flow
SHINE is called seiso in
Japanese this method offers an
approach to cleaning the
workplace so that problems
can be found more easily
STANDARDIZE in Japanese is
called seiketsu this 5-S includes a
notation system for procedures or
items to be compatible with other
fields
SUSTAIN in Japanese is
called shitsuke last but
not least, 5-S provides a
method for creating
behaviors that preserve
workplace organization
over time
OBJECTIVE
The study revolves around Datian Subic
Shoes Inc., focusing on the production of footwear
for brands like Vans and Keds. The study's
objective was to compare the current vs. past
operation and supply chain and to identify issues
that hinder the operation and supply chain
efficiency and how to improve it using 5S.
SCOPE AND
LIMITATION
The study was conducted to compare the current and past operations of Datian
Subic Shoe Inc. by interviewing the present and past employees. The scope of the study
was only on the operation and supply chain of Datian Subic Shoe Inc. and the experience,
insight, and opinion of the current employee and the past employee who has worked at
least (2) years for Datian Subic Shoe Inc. This study does not cover employee welfare and
company conflict between officials and the entire supply chain management. It only
includes the current trading country of the supplier and Datian Subic Shoe Inc. buyer.
DEFINITION OF
TERMS
◦Stitching - a line or lines of thread that has been sewn in something
stitching
◦Not Good Stitching - it was called to works that do not pass the
standard of stitching
METHODOLOGY
The researcher used comparative analysis in this study, a methodical side-by-side
comparison that identifies the similarities and differences between at least two items. To
gather data, the researcher interviewed two people, a current employee and a former
employee with experience with Datian, and their opinions, experiences, and insights about
the company.
The researcher chose a telephone interview with the worker for information
gathering for the reason that the employees have a busy schedule and only be able to
accommodate during the end of their shift due to the peak season of production. The
interview was conducted with one current worker and one former employee of Datian. The
first employee was currently working in 6th phase of the process, called the stitching
station. The second employee was a former employee in the 6th phase of the process,
called the stitching station. After the interview, the results were compared to each other to
acknowledge the changes that happened in Datian Subic Shoe Inc. and to recommend
improvements to the operation of Datian Subic Shoe Inc.
RESULT AND
DISCUSSION
How many years did you work in Datian?
Nag sumula akong mag work nung feb 18 2018 Nag start ako nung year 2018 - 2020.
Tinatahi namin yung fabric ng shoes Tinatahi yung pinaka front ng sapatos.
Hinihiwalay yung yung mga waste sa good Naka ayos yung raw materials pagdating samin
pagtapos ng stitching at may designated para sa mga finished and
unfinished products.
How many phases that the raw material passed through to be
finished product?
Current Employee Former Employee
Sa pag kakaalam ko ang phase mula raw mats Pito yung phase
hanggang finish product ay anim
Walang maintenance kasi lagi naming inaayos Hindi regular maintenance na ginagawa para
kumbaga kapag may nasira ginagawa agad halimbawa sa mga equipments
meron sira yung machine mo itataas mo lang yung
kaliwang kamay or tinatawag naming red hand tapos
may puputang maintenance staff para maayusin.
Where there a regular cleaning staff in your area?
Meron sample na shoe na pinag babasehan tas Merong sinusunod na standard base sa class ng
ayun ung standard shoes.
Where there different training they provide?
Current Employee Former Employee
Merong training na pinoprovide kadalas kapag bagong Meron training sa mga regular at bagong
empleyado ka. Kapag naman merong panibagong style o tahi na
employees.
gagawin nag kakaron ng trial run doon merong staff na nag
tuturo then mag kakaroon ng trial run mga 8 pairs bago simulan
ang pag gawa kapag may bagong gaggawin sa line namin nag
kakaroon ng trial run bago mag mass production
Nakukuha nila yung mga raw material nila sa ibang Nakukuha ang raw materials sa Hong Kong at
bansa sa Hong Kong Taiwan tsaka China China
Where did Datian Subic Shoe Inc., export their finish products?