CHAPTER I. BACKGROUND
CHAPTER II. GOAL AND OBJECTIVES
CHAPTER III. RESPONSE ARRANGEMENTS
CHAPTER IV. ACTIVATION, DEACTIVATION AND NON-ACTIVATION
ANNEXES
CHAPTER I. BACKGROUND
A. INTRODUCTION
<SAMPLE INTRODUCTION>
MUNICIPALITY X IS ONE OF THE 17 MUNICIPALITIES THAT COMPRISE PROVINCE Y. IT HAS A
LAND AREA OF 6,731 HECTARES COMPRISING 3.63% OF THE LAND AREA OF THE PROVINCE.
IT IS APPROXIMATELY 76 ROAD KILOMETERS FROM MUNICIPALITY Z, THE CAPITAL TOWN OF
PROVINCE Y, 237 ROAD KILOMETERS FROM CITY V, 12 HOURS SEA TRAVEL AND 45 MINUTES
AIR TRAVEL FROM METROPOLIS AND OTHER PRIME CITIES IN THE COUNTRY.
CLASSIFIED AS 1ST CLASS AND BASICALLY A TOURISM MUNICIPALITY,
MUNICIPALITY X IS WHERE THE WORLD-FAMOUS ISLAND BAE IS LOCATED. IT
BECAME A MUNICIPALITY ON DECEMBER X, 19XX BY VIRTUE OF REPUBLIC ACT
XXXX. IT COMPRISES 14 BARANGAYS WHERE 3 OF WHICH ARE LOCATED IN ISLAND
BAE.
*for the sample rating scale on probability and impact, refer to Contingency Planning Guidebook pp. 29
**for the rating on impact, determine the rate in three (3) areas such as impact on life, property and public
service continuity; add all the ratings and divide it by 3 (areas) to get the final rate.
<Describe the results of the accomplished form.>
INSTRUCTIONS:
1. LIST ALL THE POSSIBLE HAZARDS THAT MAY AFFECT THE LGU/ COMMUNITY/ AGENCY/
OFFICE/
ORGANIZATION UNDER THE COLUMN “HAZARD.”
2. UNDER “PROBABILITY”, PROVIDE CORRESPONDING RATING ON THE FREQUENCY OF
OCCURRENCE OF THE HAZARD BASED ON THE AGREED RATING SCALE. INDICATE OTHER
RELEVANT DETAILS UNDER “REMARKS”, AS NECESSARY.
3. UNDER “IMPACT”, PROVIDE CORRESPONDING RATING ON THE SEVERITY OF THE EFFECTS OF
THE HAZARD BASED ON THE AGREED RATING SCALE. INDICATE OTHER RELEVANT DETAILS
UNDER “REMARKS”, AS NECESSARY.
4. UNDER “AVERAGE”, CALCULATE THE AVERAGE RATING BY ADDING THE PROBABILITY AND
IMPACT RATINGS, THEN DIVIDE BY 2.
5. UNDER “RANK”, RANK THE HAZARDS WITH THE HIGHEST AVERAGE AS 1, THE NEXT HIGHEST
AVERAGE AS 2, AND SO ON. THE HAZARD WITH THE HIGHEST AVERAGE WILL BE THE PRIORITY
FOR CONTINGENCY PLANNING.
IMPORTANT
Infrastructure
- Totally damaged CLs
- Partially damaged CLs
- Damaged WASH facilities
- Damaged other infrastructures and
ancillary facilities (e.g., laboratories,
clinic, library)
Non-infrastructure
- Damaged furnitures and fixtures
- Damaged learning resources and self-
learning modules
- Damaged Information and
Communication Technology (ICT)
equipment
- Damaged laboratory equipment
- Damaged medical and dental
equipment and supplies
- damaged technical-vocational supplies
and equipment
Communication
Power/ Electricity
Transportation
Response Capabilities
Others_________
Others_________
Others_________
DISPLACED LEARNERS
NO. OF
AREA/ LOCATION LEARNERS NO. OF LEARNERS INSIDE NO. OF LEARNERS OUTSIDE REASONS FOR
AFFECTED EVACUATION CENTERS EVACUATION CENTERS DISPLACEMENT
TOTAL
CP Form 4A.2: Affected Personnel
BREAKDOWN
(FILL-UP ONLY WHEN APPROPRIATE)
NO. OF
AREA/ LEARNERS IP
LEARNERS
LEARNERS
WITH
MUSLIM
LEARNERS
ALS LEARNERS OTHERS
ON
M F M F M F M F M F M F M F M F
TOTALfurther disaggregate between specific grade levels (for easier comparison vs. enrollment data)
*notes:
no JHS in the template
CP Form 4B.2: Breakdown of Affected Personnel
TOTAL
<Describe the results of the accomplished form.>
CHAPTER II. GOALS AND OBJECTIVES
A. GOAL
<SAMPLE OBJECTIVES>
THE GENERAL OBJECTIVES OF THE CONTINGENCY PLAN ARE AS FOLLOWS:
1. TO ENSURE THE PROTECTION OF LIVES AND PROPERTIES IN THE EVENT OF
TYPHOON IN MUNICIPALITY X;
2. TO DETERMINE THE IMMEDIATE NEEDS AND THE RESOURCES THAT WILL MEET
THE NEEDS IN THE EVENT OF TYPHOON;
3. TO ESTABLISH COORDINATION AND LINKAGES BETWEEN AND AMONG THE
STAKEHOLDERS OF MUNICIPALITY X IN THE EVENT OF THE TYPHOON.
CHAPTER III. RESPONSE ARRANGEMENTS
A. RESPONSE CLUSTERS
Note: Refer to DepEd Order No. 33 s. 2021, Enclosure 2.
<Describe the results of the accomplished form.>
<Describe the results of the accomplished form.>
<Describe the results of the accomplished form.>
B. EMERGENCY OPERATIONS CENTER
CHAPTER IV. ACTIVATION
<USE FLOW CHART TO DESCRIBE CP ACTIVATION AND DEACTIVATION>
NON-ACTIVATION OF THE CP
THERE MAY BE NO NEED TO ACTIVATE THE CP IF THE PREDICTED HAZARD OR
EVENT DID NOT TAKE PLACE OR THE SITUATION IS NO LONGER THREATENING.
Working Group
Purpose:
HEAD :
FACILITATOR :
SECRETARIAT :
CLUSTER REPRESENTATIVES :