Conventional methods employed for Roof building
New approach to lower construction cost through modified walling
and Roofing system
Innovative methods used presently for cost reduction
U-BOOT TECHNOLOGY
I-sects (Voided Slab) System
Expected results :
1.Reduction in weight of Structure by application u-boots
2.Optimal Strength Value of Structures By combination of Re-bar Structures and
U-boot using ANSYS
3.Experimental Strength Value of Structures By combination of Re-bar Structures
and U-boot using UTM testing
4.Recuction in cost by application
5.Optimal Process parameters as to number of plastic voids , Rebar structure for
minimal weight but maximum strength .
Process Variables :
1.U-boot count
2.Rebar structure
3.Rebar + u-boot Layout
4.Pour value of Cast mixture (M20 grade)
L-6 matric will b used to carry out analysis of variance for 5% value and
thus p-values will be determined for the subject factors of no. of u-
boots, rebarset profile and Pour value for three levels of operation and
thus the optimal process parameters will be predicted to get optimal
weight / cost and strength from the plastic voided cast structure.