“INTERNSHIP AT RESIDENTIAL & COMMERCIAL BUILDING AT

EARTH EUPHORIA, VADODARA”


SEMESTER 8

INTERNAL GUIDE: MR. DASHRATH PANCHAL PREPARED BY: JADHAV DEV UDAYKUMAR
INDUSTRIAL GUIDE: ALPESH BARIA ENROLLMENT:201170106522
COMPANY NAME: EARTH GROUP SUBJECT CODE:3180601
INDEX

• COMPANY OVERVIEW
• PROJECT DETAILS
• PROJECT PLANS
• WORK TILL DONE
• FUTURE SCOPE OF WORK
• CONCLUSION
• REFERENCES
OVERVIEW OF COMPANY

• COMPANY NAME: EARTH GROUP


• CIN: U45OOMH2007PLC171045
• CLASS OF COMPANY: PRIVATE
• DATE OF INCORPORATION: 05 JUNE 2000
• COMPANY STATUS: ACTIVE
• AGE OF COMPANY: 20 YEARS
• SITE ADDRESS: New, VIP Rd, near Vuda Circle, Amit Nagar, Veer Nagar 1, Karelibaug, Vadodara, Gujarat 390002
PROJECT DETAILS
PROJECT NAME EARTH EUPHORIA PROJECT NAME EARTH EUPHORIA

TYPE OF PROJECT RESIDENTIAL & SHOWROOMS 42


COMERCIAL BUILDING FLATS 122
DEVLOPER PARIKH CONSTRUCTIONS BUILDING TYPE LUXURIOUS FLATS &
SHOWROOMS
START DATE 11/2021
BUILDING STOREY G+13 & 2 BASEMENTS
ENDING DATE 12/2026
CONTRACTOR AMIT PARIKH FLATS TYPE 4 BHK LUXURIOUS FLATS

CLIENT NAME EARTH GROUP TOWERS 4 TOWERS (A,B,C,D)


STRUCTURAL DESIGN & ZARNA ASSOCIATES
ARCHITECH TOTAL CARPET AREA 13778SQ.FT
OF SHOWROOMS
TOTAL PROJECT AREA 1.72 ACRE
TOTAL SBA OF 24110SQ.FT
BUILT UP AREA OF FLAT 2320 SQ.FT,1938 SQ.FT, SHOWROOMS
1639SQ.FT
GARDEN AREA 8500 SQ.FT
CARPET AREA OF FLAT 2145 SQ.FT, 1711SQ.FT,
1501SQ.FT CLUB HOUSE AREA & 14000 SQ.FT
ESTIMETED PROJECT COST 200 CR COMMON AMENITIES
AREA
FLAT PRICE 1.25CR – 1.85 CR
MODEL OF BUILDING KEY MAP OF SITE
PROJECT PLANS

GROUND FLOOR PLAN


FLAT LAYOUT PLAN TOWER(A&B) SHOWROOMS LAYOUT PLAN

TOWER (C&D) FLATS PLAN


PARKING PLANS
PLY 4’ X 8’ X0.472”

WORK TILL DONE BATTERNS 3” X 4”


I BEAM 2100MM
SHUTTERING WORK FOR BEAM & SLAB CUPLOCK PIPE 1000MM
LEDGER PIPE 900MM

• SHUTTERING OR FORMWORK IS THE PROCESS OF GIVING SUPPORT AND STABILITY TO THE


CONCRETE BEFORE IT BECOMES SOLID. THE SHUTTERING IS COMMONLY MADE USING
WOOD AND STEEL.
• IT IS USE FOR TEMPORARY WORK TO GIVE A DESIRED STRUCTURAL SHAPE TO A SLAB
• MAX USE OF PLY : 4 TIMES

FORMWORK OF BEAM & SLAB BEAM BOTTOM


SLAB THICKNESS 6/8 INCH
 SLAB REINFORCEMENT
VIBRATOR NEEDLE
CONCRETE GRADE M25
CEMENT OPC
• 10dia of 6” C/C BOTHWAY
CLEAR COVER 25MM
• 12dia of 5’‘ C/C BOTHWAY
• 3FT BENTUP GIVEN ON 45* ANGLE ON BOTH TYPES OF SLAB
TMT THERMO MECHANICALLY TREATEDBARS Fe-500,550D
• CLEAR COVER=25 MM
TMX THERMAX POWERED BARS Fe-500,550D
 REINFORCEMENT OF BEAM & OTHER ACTIVITIES
SIZE OF BEAMS (IN INCHES)
09 x 21 18 X 24
12 x 39 18 x 39
12 x 18 24 x 27
12 x 24 44 x 27
15 x 15

FIRE SAFETY PIPE CONDUIT WIRING

SECTION OF BEAM REINFORCEMENT OF BEAM


 CASTING OF SLAB & BEAM
• IN THIS PROCEDURE OF CASTING USES M25 GRADE CONCRETE AT OUR FIELD.
• THERE WERE 2 TYPES OF CASTING METHOD USES AT FIELD.
1. CONCRETE PUMP
2. CHUTE METHOD
3. BOOM PRESSURE

CHUTE METHOD CONCRETE PUMP BOOM PRESSURE


 COLUMN CENTRENTING
• CENTERING OF COLUMN IS DONE DURING THE PLACING LAYOUT ON SITE BY ROPE &
PLUMB BOB
• STEPS
1. COLUMN LAYOUT
2. COLUMN STARTER
3. REINFORCEMENT OF COLUMN
4. FORMWORK
5. CASTING
 COLUMN REINFORCEMENT

• SCHEDULE OF COLUMN REINFORCEMENT OF COLUMN


 FORMWORK
 THERE WERE 2 TYPES OF FORMWORK ARE USED AT FIELD WORK
1. PLY FORMWORK
2. MIVAN FORMWORK

PLY FORMWORK MIVAN FORMWORK


 CASTING OF COLUMN
• M35/40 GRADE CONCRETE IS USED FOR CONCRECING IN COLUMNS.
• VIBRATOR IS USED TO PREVENT OCCURRING OF VOIDS IN CONCRETE WHICH
LEADS TO HONEYCOMB IN LATER STAGE.

CLEAR COVER 40MM


CONCRETE M35/40
GRADE

CURING 7 DAYS

CASTING OF COLUMN
 REINFORCEMENT & CASTING OF STAIRCASE

MAIN BARS 10T @ 5’’C/C

DISTRIBUTION BARS 8T @ 8’’C/C

EXTRA BARS 10T @ 10’’C/C

RISER 158.75 MM

TREAD 254 MM

\\
• SECTION OF STAIRCASE FORMWORK OF STAIRCASE

CASTING OF STAIRCASE
 CURING
• CURING IS THE PROCESS IN WHICH THE CONCRETE IS PROTECTED FROM LOSS OF MOISTURE AND KEPT
WITHIN A REASONABLE TEMPERATURE RANGE. THIS PROCESS RESULTS IN CONCRETE WITH INCREASED
STRENGTH AND DECREASED PERMEABILITY.
• IT IS MOST IMPORTANT POINT IN CONSTRUCTION
• WHEN CURING IS NOT DONE PROPERLY STRUCTURE STARTS CRACKING
• CURING METHOD: DIRECT WATERING & WET CLOTHING, FLOODING METHOD

WET CLOTHING METHOD PONDING METHOD DIRECT METHOD


 ELEVATOR
• CASTING LIFT WALL BY PHARMA SHEET
• SIZE OF PHARMA SHEET
1. 135CM X 75CM X 10CM
2. 135CM X 45CM X 10CM
• SIZE OF LIFT 9.45 X 0.23 X 2.27 (LBH)
• LENGTH INCLUDED 3 SIDES
• CONC.=5.58M3
DETAIL OF ELEVATOR
• CONC.= M40

FORMWORK & CASTING OF ELEVATOR


 SILL LEVEL COPING WORK IN BLOCK MASONARY

 SILL LEVEL COPING IS PROVIDED TO ELIMINATE THE FLEXURAL AND DIAGONAL CRACKS
ON THE WALL.
 IT IS PROVIDED ON THE HEIGHT OF 1.2 M AT THE WALL.
 10MM DIA BARS ARE PROVIDED IN IT.

 DEPTH = 3.5”

SILL LEVEL COPING SUPPORT COLUMN


 BLOCK MASONARY

 IN THIS TYPE OF MASONARY. WE USED AAC(AUTOCLAVED AERATED CONCRETE) BLOCK


ARE USED FOR CONSTRUCTING WALL & STRETCHER BOND IS APPLIED.
 WONDER BLOX G1 BLOCK ARE USED
 IT IS LIGHT WEIGHT CONCRETE, FASTER CONSTRUCTION ETC
 IT HAS HIGH STRENGTH, PREMIXED, SHRINKAGE FREE.
 BONDING AGENT: BUILT O FAST
 ADHESIVE:3MM
JOINING MORTAR
 BLOCK SIZE: 4’’X 8’’X 24’’ AND 9’’X 8’’X 24’’

LINING & ROPING BLOCK MASONARY


 REBARRING WORK
• REBARRING IS THE METHOD OF INSERTION OF THE STEEL BARS WHEN, THERE IS CHANGE
IN DESIGN OR THERE IS SOME EXTENSION OF THE PRESENT STRUCTURE. WHEN STEEL ROD
AS PER DRAWING HAS NOT BEEN INSTALLED.
DIA OF BAR DEPTH OF HOLE
• CHEMICAL = FISCHER FIS V+ ,PKD SIZE 360ML
10MM 6’’

12MM,16MM 8’’

20MM, 25MM 12’’

REBARRING WORK
 PLASTER WORK
• PLASTERING IS THE PROCESS OF COVERING ROUGH WALLS AND UNEVEN SURFACES IN THE
CONSTRUCTION OF HOUSES AND OTHER STRUCTURES WITH A PLASTIC MATERIAL, CALLED
PLASTER, WHICH IS A MIXTURE OF LIME OR CEMENT CONCRETE AND SAND ALONG WITH
THE REQUIRED QUANTITY OF WATER.
• MIX PRAPORTION: (1:4)
 PLASTER COAT:
1. FIRST LAYER: 12MM
2. FINAL LAYER: 06MM

PLASTER WORK
 RMC PLANT
 THE CONCRETE QUALITY IN TERMS OF ITS PROPERTIES OR COMPOSITION AND
QUANTITY OR VOLUME REQUIRED FOR THE PARTICULAR APPLICATION IS SPECIFIED
BY THE CUSTOMER.
 THE USE OF READY-MIXED CONCRETE IS ALSO ADVANTAGEOUS WHEN ONLY SMALL
QUANTITY OF CONCRETE ARE REQUIRED OR WHEN CONCRETE IS PLACED ONLY AT
INTERVALS.
 USUALLY, THE PRICE OF READY-MIXED CONCRETE IS SOMEWHAT HIGHER THAN OF
SITE MIXED CONCRETE, BUT THIS MAY OFTEN BE OFFSET BY SAVINGS IN THE
CEMENT. CONTENT, SITE ORGANISATION AND SUPERVISORY STAFF.
 ROTATION PER MINUTE OF CONCRETE MIXER: 1400RPM
PLANT VENUS CP-30
 IT CONTROLS BATCH MIXING OF CONCRETE
BATCH PRODUCTION 0.5 CU/M

SYLO SIZE 100 TON

BATCH PRODUCTION 30 CU/M. / HR


PER HOUR
RMC PLANT OPERATING MACHINE

MIX DESIGN CHART


 TESTS CARRIED OUT ON FIELD

COMPRESSIVE STRENGTH TEST PULL OUT TEST

RESULTS
 TESTS CARRIED OUT ON FIELD

ADHESSIVE MATERIAL TEST


 TYPES OF CONCRETE MIXING, TRANPORTING EQUIPMENTS &
OTHER EQUIPMENTS

BOOM PRESSURE CONCRETE PUMP TRANSIT MIXER

TOWER CRANE BACK HOE LOADER BAR BENDING MACHINE


 FUTURE SCOPE OF WORK
• CASTING SLAB, BEAM, COLUMN
• SHUTERING WORK
• AAC WORK
• PLASTER WORK
• EXCAVATION OF OTHER TOWER
• WATER PROOFING
• FLOORING WORK
 CONCLUSION
 It has been a transformative experience that has helped me grow both personally and professionally. I
learned new skills and gained valuable experience that will serve me well in my future career.

 During my internship, I had the opportunity to work on various aspects such as analysing structures,
managing multiple tasks given by my supervisor, estimating the materials required for the construction, and
supervision.

 I am grateful to my supervisor and colleagues for their support and guidance, and for creating an
environment where I could thrive.

 This experience has helped me gain clarity on my career goals and has inspired me to continue to learn and
develop my skills in the Civil Engineering field
 REFERENCES
 https://civilsitevisit.com/compressive-strength-of-concrete-test-procedure/

 https://en.wikipedia.org/wiki/Backhoe_loader

 http://saphelp.ucc.ovgu.de/NW750/EN/43/fc7bed6bfb025ee10000000a1553f7/content.htm#:~:text=Definition,a%20varia
ble%20number%20of%20rows
.

 https://www.cbecindia.com/2021/07/block-work-standard-operating-procedure.html#:~:text=Fix%20one%20block%20at
%20both,line%20thread%20on%20end%20blocks

 https://dreamcivil.com/plastering-in-construction/

 https://www.indiamart.com/proddetail/venus-cp30-compact-concrete-batching-plant-24728131833.html
THANK YOU

You might also like