Isolated Foundation Design
CALCULATION
FOR
FOUNDATION SIZE
ISOLATED FOUNDATION-CONSTANT DEPTH X-axis
1.5m
FOUNDATION LAYOUT X-axis
Tp = 250
GL
Z-axis
Df=1.5m
L=1.7m
h: 450 D=425
b: 300
LXB
B=2.0m
SECTION
PLAN
CHECK OR MAXIMUM BASE PRESSURE:
Z-axis
(II) BASE PRESSURE DUE TO MOMENTS:
= Mx/Sx + Mz/Sz
Lz=1.7m
X-axis
Sx , SECTION MODULUS OF FOUNDATION
PLAN ABOUT X-AXIS Mx
= Lx. Lz2 /6 = 2.0 x 1.72 /6 = 0.963 m3 Mz
Lx=2.0m
PLAN
Sz , SECTION MODULUS OF FOUNDATION
PLAN ABOUT Z-AXIS
= Lz. Lx2 /6 = 1.7 x 2.02 /6 = 1.133 m3
= 170.50 Kn/m2
SOIL BEARING CAPACITY FOR (DEAD LOAD + LIVE LOAD ) CASE:
STRENGTH DESIGN
OF
FOUNDATION FOR
REINFORCED CONCRETE
STRENGTH DESIGN OF FOUNDATION:
Qmax = Pmax – Ps
= 175.09 -28.15
= 146.95 Kn/m2
Qmax
Qmax = 146.95 Kn/m2
1.7m
= 220.425 x [(2.0 – 0.30)/2]2 PER METER X-axis
450
2
axis
Z-
= 79.62 Kn-m x 1.7 m
= 135.35 Kn-m per 1.7 m WIDTH OF FOOTING B= 2.0m
PLAN
MOMENT ,Mx AT COLUMN FACE DUE TO Q’max:
Mx = Q’max .[ (L-h)/2]2
axis
Z-
2
L = 1.7m
= 220.425 x [(1.7 – 0.450)/2]2
h = 450
2 PER METER
FINAL MOMENTS:
( a) FOR MOMENT , Mz :
REINFORCEMENT REQUIRED-
Mz * [ IS-456:2000 ANNEXURE G1.1(b)]
As =
0.87.fy.d.[ 1- (As.fy/b.d.fck) ]
a.X2 + b.X + C =0 ;
WHICH SOLUTION :
X= where a = , b = -0.87.fy.d
c = Mz
a=
axis
Z-
L = 1.7m
a = 6.397
h = 450
b = -0.87.fy.d
Clear Cover,
1.7 m Cc = 50 mm
EFFECTIVE DEPTH = TOP OF CONCRETE TO CENTRE OF RE BAR
EFFECTIVE DEPTH , d = D – Cc – ϕ/2
d = 425 – 50 – (12/2)
d= 369 mm
NOW ‘ b ‘ CAN BE WORKED OUT :
b = -160515,
As =
AFTER SOLVING ,
(As)min =
= 867 mm2
TRIAL SPACING OF 12ϕ RE BAR WITHIN 1.7 m BASE LENGTH = 150 mm ,SAY.
NO OF RE BARS = (1700 – 2 x CLEAR COVER,Cc) /150
= (1700 - 2 x50/150)
= 10.67 ,SAY 10 NO’S
Clear Cover,
Cc = 50 mm
1.7 m
REINFORCEMENT PROVIDED,As(Pro) =
NO OF REBARS x AREA OF CROSS SECTION OF EACH REBAR.
= 10 x
1.7 m
10 NO’S REBAR 12 DIA
= 164 mm
IN OUR CASE -
EFFECTIVE DEPTH = 369 mm,
ACTUTAL CLEAR SPACING BETWEEN REBARS = 164 mm,
LESS THAN 300 mm, HENCE O.K.
Z-axis
10 NO’S -12 φ
REBARS PROVIDED
WITH CLEAR
L = 1.7m
SPACING @ 164 mm
OR
CENTRE TO CENTRE
SPACING OF REBARS
= (164 + 12 φ )
= 176 mm SAY 175
B= 2.0m
PLAN 175 mm
CALCULATION OF REINFORCEMENT :
( b) FOR MOMENT , Mx :
REINFORCEMENT REQUIRED-
Mx * [ IS-456:2000 ANNEXURE G1.1(b)]
As =
0.87.fy.d.[ 1- (As.fy/b.d.fck) ]
a.X2 + b.X + C =0 ;
WHICH SOLUTION :
X= where a = , b = -0.87.fy.d
c = Mx
a=
axis
Z-
L = 1.7m
a = 5.44
b = - 0.87.fy.d
b = -155730,
As =
AFTER SOLVING ,
(As)min =
= 1020 mm2
TRIAL SPACING OF 10ϕ RE BAR WITHIN 2.0 m BASE LENGTH = 150 mm ,SAY.
NO OF RE BARS = (2000 – 2 x CLEAR COVER,Cc) /150
= (2000 - 2 x50/150)
= 12.66 ,SAY 13 NO’S
2.0 m
REINFORCEMENT PROVIDED,As(Pro) =
NO OF REBARS x AREA OF CROSS SECTION OF EACH REBAR.
= 13 x > (As)min, HENCE O.K
= 148 mm
IN OUR CASE -
EFFECTIVE DEPTH = 358 mm,
ACTUTAL CLEAR SPACING BETWEEN REBARS = 148 mm,
LESS THAN 300 mm, HENCE O.K.
Z-axis
13 NO’S -10 φ
REBARS PROVIDED
WITH CLEAR
L = 1.7m
SPACING @ 148 mm
OR
CENTRE TO CENTRE
SPACING OF REBARS
= (148 + 10 φ )
= 158 mm SAY 150
B= 2.0m
PLAN 150 mm
SHEAR CHECKS FOR THE FOUNDATION
THERE WILL BE FOLLOWING TWO TYPES OF SHEAR CHECKS TO BE
PERFORMED-
= 0.28 N/mm2
SHEAR STRESS CALCULATION FOR ONE WAY SHEAR: COLUMN 300 X
450 mm
MAXIMUM PROJECTION OF FOOTING
0.625
FROM COLUMN FACE
= 0.850 m
1.7m
EFFECTIVE SHEAR LENGTH WILL BE 0.850
‘d’ DISTANCE AWAY FROM COLUMN FACE 0.850
0.625
AND UPTO FOOOTING EDGE.
B= 2.0m
d = 358 PLAN
1.7m
EFFECTIVE SHEAR
AREA
0.850
EFFECTIVE SHEAR
LENGTH = 850-358
B= 2.0m = 492 mm
PLAN
SHEAR STRESS CALCULATION FOR ONE WAY SHEAR:
d = 358
1.7m
EFFECTIVE SHEAR
AREA
0.850
EFFECTIVE SHEAR
B= 2.0m LENGTH = 850-358
PLAN = 492 mm
SHEAR FORCE ,V AT CRITICAL SECTION :
= 184.36 Kn
SHEAR STRESS, DUE TO SHEAR FORCE ,V:
= 184.36 x 103
(1700 x 358) SHEAR FORCE
= 0.303 Kn/m2
d
b , WIDTH
OF FOOTING
2.0 m
12 NO’S
10 NO’S REBAR 12 DIA
B= 2.0m
PLAN
2.0 m
12 NO’S
10 NO’S REBAR 12 DIA
= 13 x
B= 2.0m
PLAN
CRITICAL PERIMETER
d/2
d/2 d/2 CRITICAL PERIMETER FOR TWO
h WAY SHEAR CHECK WILL BE
b CONSIDERED AT “d/2” DISTANCE
AROUND COLUMN,WHERE “d” IS
d/2 EFFECTIVE DEPTH OF FOOTING
CRITICAL PERIMETER,P = [ (b + d ) + (h + d ) ] x 2
= 2b + 2h + 4d
= 2x300 + 2x450 + 4x 358
= 2632 mm.
AREA WITHIN CRITICAL PERIMETER, A’ = (b + d ) x (h + d )
= (300 + 358) x(450 + 358)
= 531664 Sq mm
2.0 m AREA FILLED WITH YELLOW
COLOUR ,REPRESENTS AREA
EFFECTIVE FOR PUNCHING
SHEAR
PUNCHING SHEAR
FORCE, V
1.7 m
FOOTING FOOTING
CRITICAL
PERIMETER
PUNCHING SHEAR FORCE, V = MAX SOIL BASE PRESSURE x EFFECTIVE AREA FOR
PUNCHING SHEAR
= Qmax (factored) x [ 1.7 x 2.0 – 531664/10 6 ]
= 220.42 x 2.87
= 632.24 Kn
SHEAR FORCE, V kN
= V/(p x d)
= 632.24 x 103 /( 2632 x 358)
= 0.67 N/SQmm
= = 1.12 N/mm2 ;
NOW Ks = (0.50 + 0.67) = 1.17 BUT SHOULD NOT GREATER THAN 1.0
HENCE Ks TO BE TAKEN AS 1.0
( II ) SLIDING –
Ka = , = 0.33
STABILITY CHECK AGAINST SLIDING:
h=1.5m
pc=8.07 kn/sqm.
1.075 m
pb= Ka x γb x h= 0.33x16.3x1.075
mm
425
pb=5.78 kn/sqm.
h=1.5m
pb= Ka x γb x h= 0.33x16.3x1.075
= 5.78 kn/sqm.
a 1.7 m
1.075m
Horizontal force on column base :
mm
425
½ x pb xh x column width
= ½ x 5.78 x 1.075 x 0.45
= 1.4 Kn. b
Total Horizontal force = (I) +(II) +(III)
= 16.71 + 5.0 + 1.4
Hx = 23.11 Kn.
c
Ka.γb.h
Calculation for Resisting Force against sliding:
Hx2=1.4 KN
Mx
X-axis
Hx1=5.0 KN
1.
7m
Z-axis
Mz
2.0 m
CASE 1:
STABILITY AGAINST Mz , MOMENT ABOUT Z-AXIS;
Mz = M’z (FROM STAAD) + MOMENT DUE SOIL PRESSURE ON
COLUMN FACE & FOOTING FACE.
STABILITY CHECKS AGAINST OVERTURNING:
Hx2=1.4 KN 1.075 m
Mx
X-axis
Hx1=5.0 KN
0.4
1. 25/
7m 2m
Z-axis
Mz
2.0 m
MOMENT DUE TO SOIL PRESSURE ON COLUMN FACE & FOOTING
FACE:-
= 5.0 x 0.425/2 + 1.4 x ( 1.075/2 + 0.425 )
= 2.41 KN-M
MOMENT M’z FROM STAAD –
L/C:11 (1.0 DL+ 1.0 LL + 1.0 WLx.) Mz= 14.385 KN-M, (FROM STAAD)
RESTORING 2.0 m
MOMENT;Mr
FACTOR OF SAFETY ACHIEVED AGAINST OVERTURNING ABOUT Z AXIS –
= 490.62 / 16.8
= 29.2
Hz2=1.4 KN
Mx
X-axis
1.
7m Hz1=5.0 KN
Z-axis
2.0 m
h=1.5m
(b) Active earth pressure at point b :
pb= Ka x γb x h= 0.33x16.3x1.075
pb=5.78 kn/sqm. a 2.0 m
1.075 m
mm
425
Average earth pressure for b to c:
(pb+pc)/2= (8.07+5.78)/2=6.93 Kn/sqm
b
Horizontal force on footing base due to
soil =6.93 x 2.0 x 0.425 = 5.9 Kn.
( Hz1 )
c Ka.γb.h
( II ) Horizontal force due to soil pressure at Column :
h=1.5m
Horizontal force on column base :
½ x pb xh x column width a 2.0 m
1.075m
= ½ x 5.78 x 1.075 x 0.30
mm
425
= 0.93 Kn. ( Hz2 )
c
Ka.γb.h
1.075 m Hz2=0.93 KN
Mx
X-axis
1. 0.425 Hz1=5.9 KN
7m /2 m
Z-axis
2.0 m
L/C:14 (1.0 DL+ 1.0 LL + 1.0 EQz.) Mx= 12.58 KN-M, (FROM STAAD)
RESTORING 1.7 m
MOMENT;Mr
FACTOR OF SAFETY ACHIEVED AGAINST OVERTURNING ABOUT X AXIS –
= 417 / 14.73
= 28.3
450
= 0.3 x 0.452 / 6 = 10125000 m3
X - axis
Z - axis
= 450 x 3002 / 6 = 6750000 m3
MAXIMUM BASE PRESSURE AT COLUMN BASE-
450
fb = REQUIRED DIMENSION OF COLUMN
X - axis
9 450
4.98 = L
Z - axis
L = 249 , SINCE REQUIRED DIMENSION OF PEDASTAL ‘L’ IS
EVEL LESS THAN THE COLUMN DIMENSION 450mm,
THEORITICALLY PEDASTAL IS NOT REQUIRED.
THEORITICALLY PEDASTAL IS NOT REQUIRED, STILL WE WILL PROVIDE
PEDASTAL.
PROVISION OF REINFORCEMENT-
THEORITICALLY PEDASTAL IS DESIGNED AS UN REINFORCEMENT,
BUT TO AVOIDE BRITTLE FRACTURE, 0.4% OF REINFORCEMENT IS
USUALLY PROVIDED.
450
CONCRETE
REINFORCEMENT, As(Pro) - PEDESTAL
= 0.4 x (450x600) / 100
= 1080 12Φ REBARS -
10 NO’S
USING 12Φ REBAR, NO OF REBARS: X - axis
600
= 1080 / ( )
= 9.56, PROVIDE 10 NO’S REBARS 12Φ. CONCRETE
COLUMN
Z - axis
PEDASTAL REINFORCEMENT USUALLY PROVIED AS ‘ U ‘ BARS :
CONCRETE CONCRETE
PEDESTAL COLUMN
fy = 500 N/mm2
= 57ϕ
= 45.31ϕ
= 46ϕ
CALCULATION FOR DEVELOPEMENT LENGTH ,Ld :
*
X-axis
12 Dia Rebar-
13no’s
L = 1.7m
Z-axis
450
X-axis
12 Dia Rebar-
300 12 No’s
Z-axis
B= 2.0m
X-axis
12 Dia Rebar-
13no’s
L = 1.7m
Z-axis
450
X-axis
12 Dia Rebar-
300 12 No’s
Z-axis
B= 2.0m
LdX = (2000-300)/2 -50 =800 mm > 684 mm, REQUIRED, HENCE O.K.
CALCULATION FOR DEVELOPEMENT LENGTH ,Ld IN Z DIRRECTION:
X-axis
12 Dia Rebar-
13no’s
L = 1.7m
Z-axis
450
X-axis
12 Dia Rebar-
300 12 No’s
Z-axis
B= 2.0m
LdX = (1700-450)/2 -50 =575 mm WHICH IS LESS THAN REQUIRED 684 mm,
HENCE L-BEND BOTH SIDES TO BE PROVIED.
425-50x2 = 325 mm
1.7 m
DEVELOPEMENT LENGTH ,Ld CHECK FOR COLUMN REINFORCEMENT :
*
PEDESTAL DEVELOPMENT LENGTH REQUIRED
TOP FOR COLUMN REINFORCEMENT IN
250 mm TENSION, Ldt = 57x16= 912 mm
WHICH TO BE PROVIDED AS L-
BEND.
GL 912-
351=
1075 mm
561mm
425-12-12-
1500
50 =351 mm
m
Ld (t) Ld (c)
mm
425
DEVELOPEMENT LENGTH , Ld CHECK FOR COLUMN REINFORCEMENT :
mm
425
X
2.0m
X-axis
Y Y
1.7m
145mm c/c
12 Dia Rebar@
1.075
145mm c/c
m
561 mm 75m
m
mm
425
PLAIN CEMENT
12 Dia Rebar@ CONCRETE 1:4:8,
155mm c/c 100mm THICK
SECTION X-X 12 Dia Rebar@
SECTION Y-Y 145mm c/c