L4 AFR CO – PROCESSING UNIT

AFR FEEDING GRABBER


PSSR – 16.11.2021
Members Present:

1. Mr. Nilesh Jawre DH – AFR


2. Mr. Rajesh Bisen SH – Project
3. Mr. Prasun Singh SH – E&I
4. Mr. Sanjay Singh SH – AFR
5. Mr. P.Sandeep Kumar FLE – Mech.
6. Mr. G.V. Surya Narayana – FLE – Elect.
7. Mr. Vinod Kumar – FLE - Safety
8. Mr. Chandra Shekar – Staff – AFR
9. Mr. Rajesh Mani Mishra – Staff – AFR
Staircase Landing Platform Grating is Inclined
Hand Railing to be Provided
Toe Guard Missing on Landing Platform and Stair Case
Feasibility to be checked beside Trolley both sides – Hand Railing or Life line Provision
Toe Guard Missing on EOT Platform Both Sides
Hand Railing Provision to be done
Exposed Wire Rope Drum – Check Exposed Brake drum
feasibility for Guarding
Exposed Shafts for EOT Longitudinal drive
Shaft Exposed Non Std. M/C Guard
Rail fixing Clamp Missing in Some Areas
Toe Guard Non Std. and Hand railing Missing
Feasibility to be checked for Providing
Hand Railing at this area

Hand Railing at this area


Coupling Guard Missing for EOT Transverse Travel
drive
Non Std Chain Sprocket Guard
Hand railing Missing and Non Std. Toe Guard
Gear Box Oil Leakage observed from Grabber
EOT Up / down Drive
Operator Cabin Access not Proper – Cage Snap Chain Missing for Monkey ladder for
to be provided Approach to Pit at Ground Floor
Feasibility to check Grabber to take down for Maint. – Hand Railing and Concrete wall
obstructing Grabber to rest on Ground
1. Lighting Arrangement to be provided at EOT and Stair Case Area
2. Hydraulic Oil Leakage from Grabber cylinder Hose.
3. SOP to be made for Operation and Maint. Work.
4. Un Authorised Entry to be restricted by proper locking arrangement.
THANK YOU