Issue Analysis: Poor coverage between WU Bassey Barracks and Niger Barracks as a result of inter site distance between
CABJ264 and CABJ228.
Recommendation: (i) Deploy a new site around WU Bassey Barracks.
Case 4
Case 3
Case 5
Issue Analysis: Poor quality along Lungi Barracks serving CABJ228_S4, NBR cell CABJ008_S4 and over lapping cell
CABJ335B_S4.
Recommendation: (i) Electrical down tilt required on Over lapping CABJ335B_S4, CABJ128_S4 and CABJ015_S4.
Case 5
Issue Analysis: Poor coverage and quality between Shema fuel station and A.A Rano fuel station along katampe road is as
a result of inter Site distance between CABJ253 and CABJ177.
Recommendation: Deploy a new LTE site at Festrut Estate Katampe Phase 3 at Lat: 9.110337 Long: 7.462978 as permanent
Solution to the coverage and quality issues along route.
Issue Analysis: Poor coverage and quality between bricks City Estate and National Open University Dei Dei is as a result of
Wide inter site distance between HABJ717 and CABJ726.
Recommendation: Deploy a new LTE site around National Open University Dei Dei.
Issue Analysis: Poor coverage and quality around Dakwa is as a result of wide inter site distance between HABJ824 and Zuba br
Recommendation: Deploy a new LTE site around Dakwa.