Professional Documents
Culture Documents
GO - NAST3008 - E01 - 1 GSM TCH Assignment Failure and Solutions-24p
GO - NAST3008 - E01 - 1 GSM TCH Assignment Failure and Solutions-24p
GO - NAST3008 - E01 - 1 GSM TCH Assignment Failure and Solutions-24p
& Solutions
Objectives
Number of busy hour TCH call attempts Number of busy hour TCH assignment
(excl. HO) failures (excl. HO)
Assignment Request
Channel Activation
Assignment Failure(1)
Channel Activation
Assignment Failure(2) Ack
Assignment Command
Assignment Command
SABM
UA
Assignment Failure(3)
Remarks:
Assignment Failure(1):BSC can’t complete MSC’s request for TCH
Assignment Failure(2):BTS can’t complete MSC’s request for TCH
Hardware
Hardwareproblem
problem
Co-channel
Co-channelor
oradjacent
adjacentchannel
channelinterference
interference
Antenna
Antennafeeder
feederproblem
problem
Unreasonable
Unreasonablesetting
settingof
ofparameters
parameters
TCH
TCH allocation
allocation failure
failure Transmission
Transmissionproblem
problemat atAAinterface
interfaceor
or
Abis interface
Abis interface
Influence
Influenceof
ofrepeater
repeater
Check if radio
parameters are
Check hardware
Check antenna
system
(C900060017+C900060028+C900060036+C900060235
+C900060199+C900060210)*100%/(C900060010+C900060019
+C900060030+C900060038+C900060042+C900060046)
Counter
formula
(C901260014+C901260063+C901260088+C901270014+C9012
70063+C901270088)*100%/
(C901260001+C901260020+C901260069+C901270001+C9012
70020+C901270069)
MS BTS BSC
CHL_REQ
CHL_RQD
A1
CHL_ACT
CHL_ACT_ACK
A2
IMM_ASS_CMD
IMM_ASS
SABM EST_IND
A3
Figure 2-1
Signaling
Counter(6.20) Counter(6.50) Counter Name
Point
CHL_ACT_ACK
ASS_CMD B3
ASS_CMD
SABM
UA EST_IND
ASS_COM B4
ASS_COM
B5 ASS_COM
Figure 2-2
After a drive test and On Site hardware Investigation, the engineer realized problem
with the antenna hardware, after Antenna swaped out the problem was solved.
1 2 3
Performance statistics showed that TCH
Problem
assignment failure rate was high in Cell2
description
and Cell3, which led to low TCH allocation
success rate.
1 2 3