PECT

TECHNICAL
WEEKLY
REPORT Week 02
01 - 07 March 2024

1
PECT STS PERFORMANCE

Challenges Action item Target date


MTTR
10 6.61 • Replaced VSM on gantry drive. • Completed
• Crane 4 – Gantry
5 0.78 0.85 1.37 • Removed power pack solenoid valve and • Completed
0.55
0 drive and storm pressure sensor fault.
Week 47 Week 48 Week 49 Week 50 Week 51
brakes tripping faulty
Weeks
(5.2 Hrs.)

MTBF • Replace the communication card in trolley • Completed


• Crane 4 – Spreader
• Fixed short circuit in headblock • Completed
37.84
40 27.97 communication fault
21.52
16.19
20 10.87 (29.05 Hrs.)
0
week 47 week 48 week 49 week 50 week 51
Weeks

No. of Breakdowns & No. of Breakdowns/ 1000TUE’s


15.00 13.00

10.00 9.07
8.00
6.00
5.00 4.97
5.00 4.10 4.00
2.59 3.13

0.00
week 47 week 48 week 49 week 50 week 51

No. of Breakdowns No. of Breakdown/Weeks


1000TUE’s 2
PECT MHC PERFORMANCE

Challenges Action item Target date


MTTR
50 38.18 • Manufacture new hydraulic pipe • Completed
• Spreader hydraulic
• Replace old hydraulic pipe • Completed
0.83 0.62 0.96 0.84
0 pipe leaking oil
Week 47 Week 48 Week 49 Week 50 Week 51
(38.18 Hrs.)
Weeks

MTBF
60
40.04
40 23.39 21.7
13.01 15.49
20
0
week 47 week 48 week 49 week 50 week 51
Weeks

No. of Breakdowns & No. of Breakdowns/ 1000TUE’s


15.00 14.11

10.00 8.25
6.82 7.00
4.34 5.00 5.05
5.00 4.00
2.00
1.00
0.00
week 47 week 48 week 49 week 50 week 51

No. of Breakdowns No. of Breakdown/Weeks


1000TUE’s 3
PECT STRADDLES PERFORMANCE

Challenges Action item Target date


MTTR
2 • S/C 19 issued stop • Replace all hoist ropes • TBC
0.92 0.86 1.11
1 0.46 0.41 • Replace all column bolts • TBC
certificate • Replace all spreader slides • TBC
0
Week 47 Week 48 Week 49 Week 50 Week 51 • Repair all handrails • TBC
Weeks • Replace X3 horizontal pulley • TBC

MTBF • S/C 26 left footwell • Repair all cracks • TBC


• Replace footwell step plate • TBC
600 504 step plate has cracks
400
168 144 • S/C 18 Spreader • Weld landing proximity sensor • Completed
200 67.2 59.29
0 landing twist-lock
week 47 week 48 week 49 week 50 week 51
Weeks faulty (2.5 Hrs.)

• S/C 22 Steering swivel • Replace swivel head • Completed

head broken (2.0 Hrs.)


No. of Breakdowns & No. of Breakdowns/ 1000TUE’s
20.00
17.00
15.00
15.00

10.00
7.00
6.00
5.00
1.16 2.00
1.02 0.41 0.14 0.47
0.00
week 47 week 48 week 49 week 50 week 51

No. of Breakdowns No. of Breakdown/Weeks


1000TUE’s 4