Master Data
Master Data
Master Data
• BOM
• Can be created for generic article
• Components in the BOM are dependent on the segment value of the header
product.
• Quantity Distribution Profile can be maintained
• Routing
• Can be created for generic articles
• All Costing components ( Labor rate etc) can be mentioned in Routing itself.
MRP
• Functionality to enter the quantity to be manufactured variant wise
in a single screen.
• Live MRP ( in lieu of classic MRP) run to get below benefits :
• More up-to-date supply and demand information on which to base decisions.
• Faster reaction to demand changes reduces the risk of stock-outs and means that
requirements for maintaining high level of safety stock is reduced.
• Match demand and supply more efficiently than was previously possible.
• The planning of a selected material in a selected location (such as a distribution center)
and its supplying locations (such as a production plant).
• The planning of the distribution of a selected material across several locations.
• The planning of a selected material in a selected location and its supplying locations and
the components in the production location or locations, multilevel across the complete
supply chain.
• The planning of all the materials for which one MRP controller is responsible.
• Using the settings and control parameters in the initial screen of the MRP Live planning
run, you can determine how the planning run is to be carried out.
Production Execution
• New functionality of Production Control Workbench to process
planned orders and production orders
• Master Planned Orders
• All planned orders for variants are grouped together for reporting and processing
purposes.
• Displays the list of components required for production in the order.
• In order processing and control, the scheduling function calculates the production dates
and capacity requirements for all operations within an order or a collective order.
• Indicates whether the components, production resources/tool or capacities required for
a planned order are available.
• Converts a master planned order to the master production order.
• Displays the characteristic values based on the conversion details.
Production Execution
• Master Production Orders
• Displays the list components required for production in the order.
• Indicates whether the components, production resources/tool or capacities required for a
planned order are available.
• Releases the production order before it can be processed.
• Displays the status of the master order.
• A confirmation documents the processing status of orders, operations, sub-operations and
individual capacities. It is an instrument for controlling orders.
• Performs a goods issue for components involved in the master production order.
• When you create a production order and after each subsequent change to the order, the system
calculates the planned order costs that are expected to be incurred during production. The
planned costs are assigned to cost elements.
Production Costing
•Operations are carried out at a Work Center. In the SAP System work centers are business objects that can represent the following real work centers,
for example: Machines, machine groups Together with bills of material and routings, work centers belong to the most important master data in the SAP.
Work centers are used in task list operations and work orders.