h beams ?
One Two
Simply Cant
end end
Drop L/14 L/15 L/16 L/6
Hidden L/16 L/18.5 L/21 L/8
h beam = = 38 cm
So h slab = h beam = 38 cm
S1=S2=1.6m; Tf= 8cm; Rw=20cm
The section of the beam in story 1 is B 100x38
h beams ?
One Two
Simply Cant
end end
Drop L/14 L/15 L/16 L/6
Hidden L/16 L/18.5 L/21 L/8
h beam = = 38 cm
So h slab = h beam = 38 cm
S1=S2=0.8m; Tf= 8cm; Rw=20cm
The section of the interior beam in story 2 is B 100x38
The section of the exterior beam in story 2 is B 25x75 = 2 x h slab
Eng. Ahmad Traboulsi Sap2000 course 9
Story 3 One Way Ribbed Slab
Where L = L parallel to the ribs so h slab = 695/18.5 = 38cm h beam = 38cm B 100x38
Eng. Ahmad Traboulsi Sap2000 course 11
Story 4 Flat Slab
Where L = L average