Project – Phase II
Contract C4-DM100
Monthly Progress
Review-12
Agenda
Review Meeting 12
CONSULTANT :- AEON
CONTRACT :- C4 – DM100
12 12 0 0 0
Design Approval
Under Review
Total Equipment NONO NOWC REJD Yet to submit
with GC
12 9 0 0 3 0
Vendors Approval Status (1/6)
Beaz Beaz
Battery 14.03.2023 02.06.2023 Hoogkarspel, Approved
Solutions Solutions
Operated Rail B.V B.V Netherlands
DM10
2 cum Road
Shunter
(BORRS) G. Zwiehoff 14.03.2023
GmBH
Gemini Power
Hydraulics Pvt. 11.03.2023
Self-
Propelled Ltd.
DM108 Battery-
Operated
Scissor Lift Godrej & Boyce 11.03.2023 Godrej & Boyce 17-04-2023 New Delhi, Approved
Mfg. Co. Ltd. Mfg. Co. Ltd
India
Vendors Approval Status (5/6)
Proposed Vendors Approved Vendors
Sr. Location & Remarks
Equipment Date of
No. Vendors Vendors Date of
Submissi Country
Name Name Approval
on
Autolift 11.03.2023
Synchronized
Mobile Jacks (12 Florence (Italy),
Bertolotti 11.03.2023 Bertolotti 02-06-2023 France Approved
DM112 Nos.) and Car
Body Stands (12
Nos.)
Pfaff 11.03.2023 Pfaff 17-04-2023 Approved
PO Issued Status (1/2)
Copy of Un-priced
Sr. No. Equipment OEM’s Name PO Issuance Date
shared with CMRL
Copy of Un-priced
Sr. No. Equipment OEM’s Name PO Issuance Date
shared with CMRL
Tech Mark
DM110 Vertical Storage System Automation & 15.05.2023 Yes
Controls.
Synchronized Mobile
DM112 Jacks & Car Body Bertolotti S.P.A Italy 07.06.2023 Yes
Stands (12 Nos.)
Project's Key Dates for Design Submission & Progress (1/8)
Contractual
Actual Design Revised/Re-
Sr. No. Equipment Design Key Design Approval Date
Submitted Date submission date
Date
Contractual
Actual Design Revised/Re-
Sr. No. Equipment Design Key Design Approval Date
Submitted Date submission date
Date
Wheel Profile
Measuring Rev 0 Submitted dated
DM104 12-06-2023 In Review
System (WPMS) 03.04.2024
- Wayside
Project's Key Dates for Design Submission & progress (3/8)
Contractual Actual Design Revised/Re-
Sr. No. Equipment Design Approval Date
Design Key Date Submitted Date submission date
Contractual
Actual Design Submitted Revised/Re-
Sr. No. Equipment Design Key Design Approval Date
Date submission date
Date
EOT Crane (5t) Rev 1 submitted dated: Rev 1: NOWC received NONO Recieved
DM107 12-06-2023
Single Girder 22.08.2023 dated 12.09.2023
Contractual
Actual Design Submitted Revised/Re-
Sr. No. Equipment Design Key Design Approval Date
Date submission date
Date
08.01.2024 REJD:15.02.2024
Self-Propelled
DM108 Battery-Operated 30.09.2023 NONO Received
Rev 2
Scissor Lift Rev 2 submitted dated
Submitted based on
19.01.2024
MOM
2 TON
2 TON: R2 submitted dated NONO Received dated
18.03.2024
07.03.2024
3TON: R2 submitted dated 3 TON
NONO Received dated
19.03.2024
25.03.2024
Project's Key Dates for Design Submission & Progress (7/8)
Contractual
Actual Design Revised/Re-
Sr. No. Equipment Design Key Design Approval Date
Submitted Date submission date
Date
Synchronized
Rev 1 Submitted dated Rev 1 NOWC received
Mobile Jacks 12-06-2023 dated 16.09.2023 NONO Recieved
11.08.2023
(12 Nos.)
Rev 2 Submitted dated Rev 2 NONO received
04.10.2023 dated 19.10.2023
GAD R0 Submitted
DM112
dated: 02.08.2023
NONO Received on GAD
dated 25.09.2023
GAD R1 Submitted
Car Body dated: 09.08.2023
Stands (12 12-06-2023 NONO Recieved
Nos.) Rev 0 submitted dated
Rev 0 NOWC: 11.12.2023
28.11.2023
Battery
Operated Rail
NONO Received 05-08-
DM102 cum Road 12-06-2023 15-06-2024 06-07-2024 TBD TBD
2024
Shunter dated 01.02.2024
(BORRS)
Synchronized
Pit Jacks NONO Received 15-08-
DM103 12-06-2023 22-07-2024 17-05-2024 TBD TBD
(UFLS) for 3 2024
Car trains dated 02.01.2024
Wheel Profile
Measuring REV 0 Submitted
15-08-
DM104 System 12-06-2023 dated 02.04.2024 30-08-2024 17-05-2024 TBD TBD
2024
(WPMS) - (In Review)
Wayside
NONO
EOT Crane (5t)
DM107 12-06-2023 Received dated TBD 17-04-2024 TBD 16-07-2024 TBD
Single Girder
01.11.2023
Self-Propelled
NONO
Battery- Ready for FAT
DM108 30-09-2023 Received dated 16-06-2024 TBD 25-08-2024 TBD
Operated
17.03.2024
Scissor Lift
*Planned Delivery
Contractual Revised/Re- Actual T&C Date Actual
FAT Date Date
Sr. No. Equipment Design Key submission of Delivery As per T&C
[Intermediat As per
Date Design date Date Contract Date
e Key date] Contract
NONO FAT
Self-Propelled Received dated Completed
DM109 30-09-2023 16-06-2024 03-04-2024 25-08-2024 TBD
Battery-Forklift 18.03.2024 & dated
25.03.2024 28.03.2024
Synchronized NONO
Mobile Jacks Received dated
(12 Nos.) 19.10.2023
TBD
DM112 12-06-2023 25-07-2024 17-05-2024 TBD 31-07-2024
NONO
Car Body Stands
Received dated
(12 Nos.)
01.01.2024
Civil Signed
OHE Signed
Track Signed
E&M Signed
Signaling Signed
DM ID DM Name OHE Track Civil RST E&M Signalling Total Open Closed
Total 4 1 10 3 6 7 31
Closed 0 0 0 0 0 0 0
Total 1 3 1 5
Closed 0 0 0 0
Total 2 5 3 3 13
Closed 0 0 0 0 0
Interface Matrix for ICF (2/3)
DM ID DM Name OHE Track Civil RST E&M Signalling Total Open Closed
Total 2 2 2 3 3 12
Closed 0 0 0 0 0 0
Total 2 4 3 9
Closed 0 0 0 0
Total 2 4 3 9
Closed 0 0 0 0
Interface Matrix for ICF (3/3)
DM ID DM Name OHE Track Civil RST E&M Signalling Total Open Closed
Total 4 3 7
DM107 EOT-01 (C-III) Open 4 3 7
Closed 0 0 0
Total 1 1
DM108 Scissor Lift Open 1 1
Closed 0
Total 1 1
Battery
DM109 Open 1 1
operator forklift
Closed 0
Total 3 2 5
DM110 VSS Open 3 2 5
Closed 0 0 0
Total 2 2
DM111 KMS Open 2 2
Closed 0 0
Total 2 4 3 3 12
MLJ & Car
DM112 Open 2 4 3 3 12
Body Stand
Closed 0 0 0
107 107 0
SITE PICTURES dated (1/2)
SITE PICTURES dated (2/2)
ATWP Site
STATUS OF KEY MANAGEMENT SYSTEM
SAT has been performed for Key Management System. Awaiting handover
certificate from CMRL
STATUS OF FORKLIFT 2 TON & 3 TON
91.80%
82.10%
80.00%
60.00% 59.40%
49.80%
40.00%
36.20%
26.41%
22.70%
20.60%
20.00%
15.60% 13.60%
9.20% 9.20% 10.00% 14.20%
9.20% 11.02% 9.60% 9.70% 8.20%
7.40% 10.00%
5.20% 7.40% 10.05% 5.60%
5.85% 6.55%
5.20% 2.20% 4.90%
1.80%
2.40% 3.40% 0.80%
0.00% 1.00%
Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24
2 Key Management System (DM111) 01 Koyambedu 01 System has been installed at Koyambedu
Depot.
3 Vertical Storage System VSS (DM110) 01 Koyambedu Revised Design Document has been submitted
awaiting approval from GC/CMRL
4 Self Propelled Battery- Operated 01 Wimco Nagar Depot Please refer to Key Issues Slide
Scissor Lift (DM108)
Early Delivery Equipment List (Requested by Swastik)
DM 105 Electric Overhead Travel (EOT);10/3 TON 17.04.2024 TBD Refer to Interface Issue Slide
Double Girder CAT-I
DM 107 Electric Overhead Travel (EOT); 5 TON 17.04.2024 TBD Refer to Interface Issue Slide
Single Girder
DM 110 Vertical Storage System (VSS) 16.06.2024 Before 31.03.2024 Design Document in review with
GC/CMRL
DM 107 Electric Overhead Travel Before 31.03.2024 TBD K2 Cranes Factory, Refer to Interface Issue Slide
(EOT); 5 TON Single Girder (Requested) Chennai, India
Automatic
Equip Incorporating the requirements of Civil and MEP for
DM101 Train Wash
Lavaggi
Plant ATWP in final GFC drawings of CMRL.
Synchronized Incorporating the requirements of Civil and MEP for SMLJ in final
DM112 Bertolotti S.P.A Italy
Mobile Jack GFC drawings of CMRL.
Self-Propelled
DM108 Godrej Scissor Lift are ready for the FAT. Date of FAT and
Battery-Operated
Location will be shared officially shortly.
Scissor Lift 1/6
1. Interface Between BORRS and Pit wheel Lathe scope issue to be discussed as it
involves extra cost
2. RFID tags (WPMS) for Koyambedu depot will be at additional cost the same needs to
Miscellaneous be discussed.
3. For additional Scissor Lift, can Swastik claim 10% on Design Document?
4. For additional EOT 5 Ton, Whether complete Design Document needs to submitted
or only GAD will be enough for NONO on Design Document?