EQUIPMENT MASTER

SAP DATA PREPARATION


CONTENT

Team
Data Table & Format
DOs and DON’Ts
Final Data upload folders
File naming format
Timeline
Reporting

20XX PRESENTATION TITLE 2


TEAM - MECHANICAL

Lead : Abubakar Ibrahim / Faith Bassey (+ 234 706 576 1869/ +234 907 747 7722)
Olaosebikan Fawas +234 816 824 3932 OFF SITE
Saleem Shuaibu Mani +234 816 955 0501 CPP/UTL
Chinomso Don Ugbaga +234 816 549 5236 MS Block
Khadijat Adulazeez +234 818 046 5609 SRU/FLARE
Grage Misan +234 805 347 5669 CDU
Joseph Jagboro +234 705 485 1473 MHC
Ezekiel Alaba +234 706 231 1927 RFCC
Peter Onyebuchi +234 916 168 8706 RFCC
Rufai Abdulwasii +234 814 977 4790 HGU/RGDU
Usman Farouq Aliyu +234 703 817 6761 PPU
Zainab Tijani +234 809 164 9159 CDU

20XX PRESENTATION TITLE 3


TEAM - ELECTRICAL

Lead : Sanjeev Kumar (+ 234 915 709 3948)

Jacinta Anusionwu +234 703 458 8665

Akabueze Francis +234 811 333 8097

20XX PRESENTATION TITLE 4


TEAM - INSTRUMENTATION
Lead : Ashwin Kacha (+ 234 815 083 2500) Unit
Utility
Krishna Kant / Yusuf Jibril Abdullahi
(RWTP/RODM/N2/ETP)
Partheeban / Lawrence Daniel Okwuokenye CPP/CT1
Osama Omer Mukhtar Abakar / Adam Zakariyya Muhammad RFCC/CDU/CT2
Satyendra Singh / Adeboye Oluwagbenga Adedamola MHC/MSB/CT3
Liaqat Ali /Alabi Sultan Olanrewaju PPU/SRU/FLARE/CT4
Kannuru Srinu /Abdulrasheed Ibrahim Rano HGU/RGDU/FOFG
Utility
Krishna Kant / Yusuf Jibril Abdullahi
(RWTP/RODM/N2/ETP)
Partheeban / Lawrence Daniel Okwuokenye CPP/CT1
Osama Omer Mukhtar Abakar / Adam Zakariyya Muhammad RFCC/CDU/CT2
Satyendra Singh / Adeboye Oluwagbenga Adedamola MHC/MSB/CT3
Liaqat Ali /Alabi Sultan Olanrewaju PPU/SRU/FLARE/CT4

20XX PRESENTATION TITLE 5


DATA TABLE & FORMATS

Data_Table_Format

2023 SAP Master Data 6


DATA TABLE TEMPLATE
DOs DON’Ts
All Fields Maintain Character Length Don’t Delete the predefined Dropdowns or
Character length restrictions in the template
Equipment Tag Each equipment as a separate line 121-PA-1002A/B
item 121-PA-1002AB
121-PA-1002A 142-EA-1003 A1-R2
121-PA-1002B
736-PA-CF-0101A
All fields No Space between letters. Provide 121-PA-1002 A
‘_’ , if necessary ATM VENT CONDENSER
AtmVentCondenser
All fields No Special Character except ‘_’, ‘-’ *,#,@,&,$,!,<,>

All fields All Proper Case except Abbreviations ABD PUMP A


ABD_Pump_A

2023 PRESENTATION TITLE 7


FILE UPLOAD PORTALS

Mechanical_Folder
Electrical_Folder
Instrumentation_Folder

20XX PRESENTATION TITLE 8


TIMELINE

Timeline Duration Start Finish


Mechanical 40 Days 26JUN2023 05AUG2023
Electrical 30 Days 26JUN2023 26JUL2023
Instrumentation 45 Days 20JUN2023
04AUG2023

20XX PRESENTATION TITLE 9


STATUS REPORTING BY EQUIPMENT
TYPE
ObjectTypeCode ObjectTypeDesc Discipline Total Identified Prepared Reviewed Approved Remarks
HEATEX HeatExchanger MEC
FINFAN FinFanCooler MEC
VACUUM_SYS VacuumSystem MEC
PRT PowerRecoveryTurbine MEC
DSL_GENTR DieselGenerator MEC
COLUMN Column,Scrubber MEC
COMPSR Compressor MEC
SILENCER Silencer MEC
AGITATOR Agitator MEC
CYCLONE Cyclone MEC
REACTOR Reactor MEC
HOPPER Hopper MEC
VESSEL Vessel MEC
BLOWER Blower MEC
VALVE Valve MEC
PUMP Pump MEC
TANK Tank MEC

20XX PRESENTATION TITLE 10


THANK YOU

20XX PRESENTATION TITLE 11