OTHER ACTIVITIES
• Following officials attended a training on “Adaptive Leadership” provided by Institute of Happiness at THP conference hall from 24.06.2021 –
25.06.2021:
i. Mr. Ugyen Rinzin, Head, CoECBM
ii. Mr. Tandin, Head, CTA
iii. Mrs. Rinchen Lhamo, Head, CoECGE
iv. Mrs. Chhimi Tshewang, AE, CoECGE
v. Mrs. Tshering Yangzom, Dy.EE. CoEACaP
• All the Purchase Requisition (PR) pertaining to items provisioned by HRDC scheduled for June cycle completed.
• Clarifications & Specifications for the PR items requisitioned by HRDC in the earlier months are being furnished, as and when enquired by MMD
Monthly Operating Dashboard
• Retesting of Water Content and BDV of 20MVA Unit – I & III of KHP.
• Oil condition assessment for 70MVA Unit – 1, 3 & 4 (R, Y & B) phase transformers and 63MVAR Shunt Reactor of THP.
• Oil condition assessment for SST – II of Switch Yard, CHP.
• Oil condition assessment for 5000KVA (I, II, III &IV) transformers of Taba substation of BPC, Thimphu.
• Furan analysis for 70MVA Unit – 1, 3 & 4 (R, Y & B) phase transformers and 63MVAR Shunt Reactor of THP.
• Furan analysis for 20MVA (I & II) transformers and 3MVA (I, II & III) transformers of Switch Yard, CHP.
• Suspended Sediment Concentration Analysis of Intake, TRT and Lubichhu of CHP for the month of May 2021.
• Suspended Sediment Concentration Analysis of TRT,THP for the month of May 2021.
• Monthly analysis and report generation of Geotechnical Instrumentation & Monitoring of PHPA-II.
• Conducted Pre-monsoon Bathymetric Survey at THP from 8.06.2021 – 12.06.2021.
• Provided 3D Monitoring service to BHP from 7.06.2021 -12.06.2021.
• Provided Underwater Diving services to DHPC from 23.05.2021- 5.06.2021.
• Provided Underwater Diving services to KHP from 13.06.2021- 24.06.2021.
• Circuit Breaker testing was conducted for 20 MVA transformer 1 at CHP on 06.06.2021.
• Insulation resistance, sheath test and insulation diagnostic test were conducted for feeder 1 XLPE cable for CPU, THP on 07.06.2021.
• Earth Impedance test and instrument calibration were conducted at KHP on 08.06.2021 & 11.06.2021.
• Circuit Breaker diagnostic testing was conducted for 20 MVA transformer 2 at CHP on 14.06.2021.
• HVDC withstand re-testing on Generator U1 stator Y-phase and U2 stator were conducted at THyE, Trongsa on 15.06.2021.
• Insulation Diagnostic test and Primary Injection test on ICT (220/66kV) and ICT CTs (66kV&220kV) were conducted at BHP from 23.06.2021-
25.06.2021.
• Circuit breaker test of Unit 2 & 4 were conducted at KHP on 25.06.2021 & 26.06.2021.
Monthly Operating Dashboard
Total Revenue Generated from all the CoEs = Nu. 2.300 Million.
Monthly Operating Dashboard
Deadline/ Weightage
ISO SN Description Status
Target (%)
Provide Solutions for Earthing Issues • The final analysis & implementation report was
O 3.2.3 Apr 2 approved by the management on 05.05.2021.
Implement solutions
Deadline/ Weightage
ISO SN Description Status
Target (%)
Provide Services to MHP Unit-III Addressing • The report on HRDC Services Rendered to MHPA in
Issues
Addressing the Issues of Failures in Unit-3 was
QO 3.2.6 To provide technical support and services to Jun 3
MHPA for Unit No. III along with the detailed approved on 23.06.2021.
assessment report.
Deadline/ Weightage
ISO SN Description Status
Target (%)
Deadline/ Weightage
ISO SN Description Status
Target (%)
Applied Research Works on Relevant Field • A proposal was approved on 05.05.2021. However,
research topic was changed to “Study on repeated
failures of MHPA Unit-3 (2019-2020)” was suggested.
Submission of research proposal to the
Q 3.2.14 Apr 2.5 • Approved the applied research proposal titled”
management
Numerical Modelling of Sediment Flow through the De-
Submission of final research report to the silting Chambers of CHP ” on 5th May 2021.
Dec 2.5
management for endorsement • All the applied research works are in progress.
Deadline/ Weightage
ISO SN Description Status
Target (%)
Capacity Building with ADA • Team members for execution of Task 2 at DHPC has
To build the competency in geotechnical
Q 3.2.20 Nov 5 been formed but the execution of the task is on hold
instrumentation as per the activities
outline in CDTA – phase II program due to the pandemic.
Monthly Operating Dashboard
Deadline/ Weightage
ISO SN Description Status
Target (%)