OVERVIEW iBrite
ITEGRATED BROADBAND INFRASTRUCTURE OF TELKOM
CONTENT
• Roadmap Infrastructure
• Deployment Policy
• Startegy Deployment
• Deployment Capacity
• 4 Main Jobs
• Integrated Planning - iBrite
• 7 Step FTTx Design
• Outpout iBrite

2
Latar Belakang
Definisi
IBrite (Integrated Broadband Infrastructure Design Center) merupakan Design Center yang dibentuk untuk mendukung
Implementasi Pembangunan infrastruktur Broadband yang memiliki sistem inventory yang terintegrasi dengan TeNOSS dan
Starclick mulai proses input demand, design, construction, operation & Maintenance

Utk Akselerasi GE Smallworld


Design Tool & System Inventory
1. Shifting To The Front Design FTTH dengan
cara cepat, akurat dan efisien MP3EI
2. Pengelolaan Demand, system inventory, OSS Percepatan Milestone &
Dukungan Telkom
yg terintegrasi
3. Penyediaan Tool untuk support “Cherry 2025
Picking” demand

Dukungan Telkom (2025)


MP3EI • Broadband Penetration > 50% House Hold
atau 35jt Broadband Homepass & 10 Jt WiFi
2012-2015 • Quality  True Broadband up to 100 Mbps
• Convergent Telkom Services & Solution for
Indonesian Lifestyle
Dukungan Telkom (2015)
• Broadband Penetration 25%
Household 20 juta Broadband
homepass dan 1 juta WiFi
IDN
Indonesia Digital Network
3
4 Main Job
1 Membangun Masa Depan
Menyelesaikan design dan BoQ 25 Juta Homepass

2
Menyelesaikan Masa Kini
Transformasi seluruh on going project ke dalam ekosistem baru
Smallworld

3 Menyempurnakan Project Masa Lalu

4
Inventarisasi asset FO dan redrawing ke Smallworld serta rehab fisik
di lapangan sesuai kaidah ODN & FTTH

4 Membangun Sistem Tata Kelola FTTH dan 4


Pilar Aplikasi (Starclick, TeNOSS, Smallworld,
ERP/SAP)
Main Job
Sistem yang terintegrasi dan saling bertukar informasi secara
langsung antar sistem

4
Prinsip dalam Design

Sinkronisasi Kesysteman
Sinkronisasi antar project, saling support Kapasitas dari OLT, FTM, Feeder dan Distribusi
kapasitas shg tdk terjadi duplikasi dalam didesign agar system. Sehingga seluruh Feeder
implementasi. harus terkoneksi ke port PON OLT.
Syaratnya : Pemetaan FO eksisting dan Drawing
dalam kertas kerja yang sama BENEFFIT :
BENEFFIT : • Tidak ada kegiatan phisik operation di ODC dan
• Efisiensi Design FTM
• Percepatan Design • Kegiatan Phisik hanya ada di bawah ODP
• Percepatan Implementasi

GE SMALL WORLD 5
Strategy Deployment
“Strategy Pemberdayaan Mitra”

Sinkronisasi PO : Node B – GF – Modernisasi


1. Rute Node B or HEM
2. List of Demand GF Retail NODE B
3. List of Usulan Modernisasi
GF follow FTTM

Green Field
Brown Field

DP
ODC ODP
Brown Field DP
FEEDER CABLE
DP

ODC BF follow FTTM

MODERNISASI

6
General Flow IBrite

Star
Click
ID
in g Po ID D e m
i sio n lyg Pro an
Pro
v on jec d
est n ing Inf D em
t
lity
u
ta
Req
v isio b i oP
rog an
Da
Pro e a si Sta
res d
l F ensi
tus
u a Re
q s 7C
Vis
t ue
Po st
ta
Da

Data Koordinat

Auto Commerce

Data Inventory Information


TeNOSS Label Integration
GE
SmallWorld

7
Life Cycle Design – Ibrite – TeNOSS - StarClick

FOMS

TA & Witel Team (android)

Witel Demand, Migration


iBrite Design & System Inventory

& Validation alpro 2. 4. 5.


3. 6. 7.As
High Low Desig
ISC eksisting (Skema Level
Field
Level n
Field Built
kabel, route, ABD), Surv Built Drawin
Desig Desi Aprov
Data TeNOSS & I- ey Out g
CS DBB n gn al
Area SISKA As Plan Drawing
& BoQ

• O&M Inventory
• OSS Aplication

Database
TeNOSS
Staging
• Input Demand : DTT,
DTB, DCS, DES, DBS,
Sales DBS, DWB DBB DWS
• Verifikasi Demand :
F1-F12
StarClick DBB
GoLive

8
Integrated Network & Application
• Aplication that Connect to CRM (I-Siska)
Star Click • Inputs Demand : DCS, DES, DBS, DBS, DWB
DBB DWS
• Verifikasi Demand : DBB GE SmallWorld
• Status Order : Otomatis reported by GE SW

• O&M Inventory
• OSS Aplication SOAP &
DB Replikasi Design & System Inventory

magik 7. As
Database 2. High
3. Field
4. Low 5. 6. Field
Built
Level Level Design Built
Staging Design
Survey
Design Aproval Out
Recordi
SOAP sql ng

TeNOSS 7 Cycle Design & ProBis SMILE - SAP


Aplikasi support field
team capture coordinates Migration &
Witel Validation alpro
and Cable Route
eksisting (Skema
CS Area DBB kabel, route, ABD)

OLD NEW
• Proses Design Lama • Proses HLD orde Jam
• Proses Manual DRM • Proses Online DRM
• Perhitungan BoQ Manual • Perhitungan Auto BoQ
• As Built Drawing Delay Ibrite - Smallworld • As Built Drawing Ready anytime
• BoQ Rekon Manual • Auto Rekonsiliasi : BoQ Rekon Valid base
•Komersial Manual dan menunggu ABD on Drawing
Lengkap • Auto Komersial
9
7 Step FTTx Planning & Design Lifecycle

Desktop Survey
Design Aproval
• Determine Target Area From • BA DRM
Final WO Posting
Master Plan Design • Approval design APD

Field Survey • BoQ APD As built drawing
• Market Analysis
• Verifikasi penempatan ODC, • • Input Tenoss
• Input lokasi by DC’s Schematic
rute kabel, alpro exist • • R2C
• Identifikasi demand Map Location
• Verifikasi demand
Star Click

4. Low
2. High Level 7. As Built
1. Desktop 3. Field 5. Design 6. Field
Level Design / Recording
Survey Survey Aproval Built Out
Design / ABD
APD

GE SmallWorld GE SmallWorld TeNOSS


High Level Design
Low Level Design
• Identifikasi alpro exist • Verifikasi field survey
• High level design new project • Modifikasi/revisi design (lokasi
• Master Poligon STO & ODC
ODC/ODP, poligon) Field Implementation
• BoQ Indikatif • Civil Placement (Duct, MH, HH) • Construction
• Cable placement and asosiation • APD update - ABD
• Labelling & Name KR 11
• Re-Drawing ABD & APD
10
2. High Level 4. Low Level 7. As Built
1. Desktop Survey 3. Field Survey 5. Design Aproval 6. Field Built Out
Design Design Recording

start

2. High Level 4. Low Level 7. As Built


Design Design Recording
Ibrite - Smallworld

3. Field Survey

6. Field Built Out

end
5. Design Aproval
Ibrite - Smallworld
11