OVERVIEW iBrite
ITEGRATED BROADBAND INFRASTRUCTURE OF TELKOM
CONTENT
• Roadmap Infrastructure
• Deployment Policy
• Startegy Deployment
• Deployment Capacity
• 4 Main Jobs
• Integrated Planning - iBrite
• 7 Step FTTx Design
• Outpout iBrite
2
Latar Belakang
Definisi
IBrite (Integrated Broadband Infrastructure Design Center) merupakan Design Center yang dibentuk untuk mendukung
Implementasi Pembangunan infrastruktur Broadband yang memiliki sistem inventory yang terintegrasi dengan TeNOSS dan
Starclick mulai proses input demand, design, construction, operation & Maintenance
2
Menyelesaikan Masa Kini
Transformasi seluruh on going project ke dalam ekosistem baru
Smallworld
4
Inventarisasi asset FO dan redrawing ke Smallworld serta rehab fisik
di lapangan sesuai kaidah ODN & FTTH
4
Prinsip dalam Design
Sinkronisasi Kesysteman
Sinkronisasi antar project, saling support Kapasitas dari OLT, FTM, Feeder dan Distribusi
kapasitas shg tdk terjadi duplikasi dalam didesign agar system. Sehingga seluruh Feeder
implementasi. harus terkoneksi ke port PON OLT.
Syaratnya : Pemetaan FO eksisting dan Drawing
dalam kertas kerja yang sama BENEFFIT :
BENEFFIT : • Tidak ada kegiatan phisik operation di ODC dan
• Efisiensi Design FTM
• Percepatan Design • Kegiatan Phisik hanya ada di bawah ODP
• Percepatan Implementasi
GE SMALL WORLD 5
Strategy Deployment
“Strategy Pemberdayaan Mitra”
Green Field
Brown Field
DP
ODC ODP
Brown Field DP
FEEDER CABLE
DP
MODERNISASI
6
General Flow IBrite
Star
Click
ID
in g Po ID D e m
i sio n lyg Pro an
Pro
v on jec d
est n ing Inf D em
t
lity
u
ta
Req
v isio b i oP
rog an
Da
Pro e a si Sta
res d
l F ensi
tus
u a Re
q s 7C
Vis
t ue
Po st
ta
Da
Data Koordinat
Auto Commerce
7
Life Cycle Design – Ibrite – TeNOSS - StarClick
FOMS
• O&M Inventory
• OSS Aplication
Database
TeNOSS
Staging
• Input Demand : DTT,
DTB, DCS, DES, DBS,
Sales DBS, DWB DBB DWS
• Verifikasi Demand :
F1-F12
StarClick DBB
GoLive
8
Integrated Network & Application
• Aplication that Connect to CRM (I-Siska)
Star Click • Inputs Demand : DCS, DES, DBS, DBS, DWB
DBB DWS
• Verifikasi Demand : DBB GE SmallWorld
• Status Order : Otomatis reported by GE SW
• O&M Inventory
• OSS Aplication SOAP &
DB Replikasi Design & System Inventory
magik 7. As
Database 2. High
3. Field
4. Low 5. 6. Field
Built
Level Level Design Built
Staging Design
Survey
Design Aproval Out
Recordi
SOAP sql ng
OLD NEW
• Proses Design Lama • Proses HLD orde Jam
• Proses Manual DRM • Proses Online DRM
• Perhitungan BoQ Manual • Perhitungan Auto BoQ
• As Built Drawing Delay Ibrite - Smallworld • As Built Drawing Ready anytime
• BoQ Rekon Manual • Auto Rekonsiliasi : BoQ Rekon Valid base
•Komersial Manual dan menunggu ABD on Drawing
Lengkap • Auto Komersial
9
7 Step FTTx Planning & Design Lifecycle
Desktop Survey
Design Aproval
• Determine Target Area From • BA DRM
Final WO Posting
Master Plan Design • Approval design APD
•
Field Survey • BoQ APD As built drawing
• Market Analysis
• Verifikasi penempatan ODC, • • Input Tenoss
• Input lokasi by DC’s Schematic
rute kabel, alpro exist • • R2C
• Identifikasi demand Map Location
• Verifikasi demand
Star Click
4. Low
2. High Level 7. As Built
1. Desktop 3. Field 5. Design 6. Field
Level Design / Recording
Survey Survey Aproval Built Out
Design / ABD
APD
start
3. Field Survey
end
5. Design Aproval
Ibrite - Smallworld