(Detailed Operating Procedure on Reserve Shut down and Mechanism of Compensation) Operating Procedure, RSD Generating station shall submit the following information at the time of DC declaration for the next day and subsequent DC revision 1. On Bar installed capacity (MW) / Units on Bar 2. On Bar DC (MW) (with due consideration to ramp up/down capability). The generator shall ensure that the Off Bar DC is not more than the MCR less Normative Auxiliary Consumption of the machines under RSD. The beneficiaries shall continue to bear the capacity charge corresponding to Total DC. 3. Ramp up/ Ramp Down rate (MW/min) for On Bar installed capacity 0800 hrs: RLDC shall advice to each state for next day 1500 hrs: the Beneficiaries shall furnish the requisition to RLDC 1800 hrs: RLDC shall prepare the dispatch schedule of each generating station 1900 hrs: RLDC shall upload the schedule as R0 2000 hrs: the Beneficiaries shall review the requisition and submit the revise requisition if injection schedule of generating station is less than the technical minimum & RLDC shall issue R1 schedule 2100 hrs: Generating station shall have the option to go for RSD under technical minimum schedule & intimate to RLDC Operating Procedure, RSD • When the machine is going under RSD : – In case the total requisitioned power can be supplied through other units in the same generating station on bar, the generator shall be scheduled according to the requisitions received. – In case total requisitioned power cannot be supplied through other units in the same generating station on bar, the requisition from the beneficiaries shall be reduced in the ratio of requisitioned power. – In the special case of a generating station where the only running machine is going under RSD, the beneficiaries who have requisitioned power will not get any power from that generating station. In such cases, the beneficiaries may make arrangement from alternative sources. – No maintenance activities on unit under RSD shall be undertaken by the generating station so that the RSD unit is always readily available for revival/synchronization. If a generating station requires maintenance on any machine under RSD, then the same shall be done in due consultation with RLDC. The DC shall be reduced appropriately. – In case the machine is not revived as per the revival time declared by the generating station under different types of start, the machine shall be treated under outage for the duration starting from the likely revival time and the actual revival time. RLDC shall ensure that intimation is sent to the generating station sufficiently in advance keeping in view its start-up time Operating Procedure, RSD Operating Procedure, RSD • Ta= Time at Which Generator unit(s) ramps down for RSD • Tb= Time at which Generator unit(s) reaches Reserve Shut down. • Tb - Ta = Based on Ramp down rates as per AS1 Form submitted under RRAS. • T1 = Time at which Generator should start its activity to synchronize its unit(s) at Tc to achieve 55% loading for Td. • Td-Ta = Based on the Condition of the unit(s) (Cold, Warm, Hot) and as specified by AS1 Form submitted under RRAS but less than 8 Hours. • TC = Time at which Generator unit(s) synchronize. • Td= Time at which Generator unit(s) reaches schedule above 55% after RSD as per the instruction given to the generator by RLDC. The instruction is given before T1 • Td – Tc = Based on Ramp up rates as per AS1 Form submitted under RRAS. • Te = Time at which Generator unit(s) can be given schedule below 55%. • Te-Td>8 hours Compensation Procedure Regulation
CERC (IEGC) Fourth Amendment dated 29Apr2016
CERC approved DOP on RSD dated 05May2017
(Detailed Operating Procedure on Reserve Shut down and Mechanism of Compensation) Degradation on SHR, AEC
Unit Loading, % Increase in SHR Increase in SHR Degradation of
for Super-critical for Sub-critical AEC applicable, Unit, % Unit, % % 85-100 NIL NIL NIL 75-84.99 1.25 2.25 0.35 65-74.99 2.00 4.00 0.65 55-64.99 3.00 6.00 1.00 Compensation on SHR, AEC • Compensation will be based on the degradation in SHR, APC, based on Unit loading as per the Comp Table • Compensation will be calculated in terms of ECR based on degraded SHR and APC (i.e. ECR (Comp)) • Total Compensation will be = SG (excluding RRAS/ STOA) x ECR (Comp) • Compensation will be calculated on monthly cumulative basis. • RPCs will be provided with two sets of data by 15th of the month: Data pertaining to the past month Data on Cumulative basis till the past month • RPC Secretariat will issue the Compensation statement along with the Final REA of the month Steps for Calculation of Compensation Calculation of Average Unit Loading (AUL) Effective Generation = AG (ex-bus) or SG excluding RRAS/Bilateral, whichever is higher Step 1 Effective Capacity = IC in MWhr– (PO + FO+ RSD Hours) x Cap AUL = Eff Gen x 100/ (Eff Capacity x (1- APCnorm))
ECR (SE) will be calculated based on the degraded HR, APC
as per the Compensation table, considering the Average Step 2 Unit Loading as calculated at Step-1 ECR:SE = ECR (degraded HR, APC) Steps for Calculation of Compensation
ECR (DC) will be calculated based on the degraded SHR, APC
as per the Compensation table, considering Average DC Step 3 AvgDC= DCx 100/ (Eff Capacity x (1- APCnorm)) ECR:DC = ECR (degraded HR, APC)
ECR (Act) and ECR (Norm) will be calculated based on the
Step 4 Actual and Normative HR, APC for the period. Steps for Calculation of Compensation No Compensation if Average Loading is more than 85% No Compensation if ECR (Act) <= ECR (Norm) Step 5 Compensation will be payable in ECR (Act)>ECR (Norm) or ECR (SE)>ECR (DC) Compensation amount will be capped at the lesser of ECR (Act)- ECR (Norm) & ECR (SE)- ECR (DC)
Apportionment of the Compensation amount
A beneficiary which requisitions more than 85% of its entitlement shall not pay any compensation Compensation amount will be shared among other Step 6 beneficiaries in proportion to the un-requisitioned energy below 85% of their entitlement Net Compensation payment will be the diff in Comp calculated till a month – compensation calculated till the previous month Oil Compensation on RSD
Unit Size, MW Hot Warm Cold
<=10 hrs >10, <=72 hrs >72 hrs outage outage outage Oil consumption per Start-up in KL 200/210/250 20 30 50 500 30 50 90 660 40 60 110 Calculation of Oil Compensation If total no of Start-ups in a year exceeds 7 x no of units in a stations, additional Sec Oil consumption is payable No compensation if Act SOC <= Norm SOC The additional Sec Oil Consumption will be in terms of KL: Step 1 ∑ compensated oil attributed to RSD Compensation will be restricted to Normative SFC + Comp calculated as above, even if the actual Oil consumption is more
Apportionment among beneficiaries
The Oil Compensation will be shared in the ratio of no of Step 2 Start-ups due to a beneficiary and the total no of Start-ups weighted with the % share of power Technical Minimum SG THANK YOU