1. DC –cum- Chairperson DDMA UNA 24.08.2023 Rs. 480.70 /- Lakh 40 hect. JSV-UNA 12 months
PROVIDING STORM WATER DRAINAGE IN VILLAGE DEHLAN LOWER IN TEHSIL & DISTT. UNA
(H.P.) (SH:- CHANNELIZATION OF EXISTING NATURAL NALLAH NEAR PH NO. 4 TO LOWER
DEHLAN FROM RD 00 TO 950 MTRS.)
• The advantage of RCC drains is to control floods and Bank erosion losses. This can save lives as
well as livelihoods and properties.
• Saving of human life, cattles & to control spreading of epidemic due to floods.
• Proposed site
Saving of soil erosion, water logging, siltation in the area on account of floods.
• Saving of communication, roads links & Govt. revenue losses due to flood in Khad.
• The beneficial effects were found to be increased flood-free secured land for agriculture,
settlement, industry and infrastructure.
PROVIDING STORM WATER DRAINAGE IN VILLAGE DEHLAN LOWER IN TEHSIL & DISTT. UNA
(H.P.) (SH:- CHANNELIZATION OF EXISTING NATURAL NALLAH NEAR PH NO. 4 TO LOWER
DEHLAN FROM RD 00 TO 950 MTRS.)
PROJECT PROPOSAL:
Proposed site
PROVIDING STORM WATER DRAINAGE IN VILLAGE DEHLAN LOWER IN TEHSIL & DISTT. UNA
(H.P.) (SH:- CHANNELIZATION OF EXISTING NATURAL NALLAH NEAR PH NO. 4 TO LOWER
DEHLAN FROM RD 00 TO 950 MTRS.)
SALIENT FEATURES
S.N. Item Remarks
1 Estimated cost & Price level 480.70 Lakhs & Price Level April 2023
Proposed site
5 Name of rivers/tributaries Dehlan Nallah
9 B.C. Ratio
PROVIDING STORM WATER DRAINAGE IN VILLAGE DEHLAN LOWER IN TEHSIL & DISTT. UNA
(H.P.) (SH:- CHANNELIZATION OF EXISTING NATURAL NALLAH NEAR PH NO. 4 TO LOWER
DEHLAN FROM RD 00 TO 950 MTRS.)
S.N. Item Remarks
10 Benefitted population in Nos. 192 No.,
Total villages benefited 01 No.
11 Benefitted area in ha 40 Hectares (Approx.)
Proposed site
15 Completion Schedule Construction Period:- 1 Year
PROVIDING STORM WATER DRAINAGE IN VILLAGE DEHLAN LOWER IN TEHSIL & DISTT. UNA
(H.P.) (SH:- CHANNELIZATION OF EXISTING NATURAL NALLAH NEAR PH NO. 4 TO LOWER
DEHLAN FROM RD 00 TO 950 MTRS.)
The Peak Flood Discharge data of Dehlan Nallah has been taken from the CWPRS technical report No. 5056 of March
2013. The Mathematical model studies for Swan River and its tributaries has been conducted in year 2013. The
maximum flood discharge of 67.00 cumecs is considered as design discharge.
Proposed site
PROVIDING STORM WATER DRAINAGE IN VILLAGE DEHLAN LOWER IN TEHSIL & DISTT. UNA
(H.P.) (SH:- CHANNELIZATION OF EXISTING NATURAL NALLAH NEAR PH NO. 4 TO LOWER DEHLAN
FROM RD 00 TO 950 MTRS.)
BENEFIT COST RATIO
A) Annual Benefits
Total:- 480.70
Proposed site
PROVIDING STORM WATER DRAINAGE IN VILLAGE DEHLAN LOWER IN TEHSIL & DISTT. UNA
(H.P.) (SH:- CHANNELIZATION OF EXISTING NATURAL NALLAH NEAR PH NO. 4 TO LOWER
DEHLAN FROM RD 00 TO 950 MTRS.)
X-SECTION OF PROPOSED STRUCTURE :-
Proposed site
PROVIDING STORM WATER DRAINAGE IN VILLAGE DEHLAN LOWER IN TEHSIL & DISTT. UNA
(H.P.) (SH:- CHANNELIZATION OF EXISTING NATURAL NALLAH NEAR PH NO. 4 TO LOWER
DEHLAN FROM RD 00 TO 950 MTRS.)
Programme of Execution:-
The scheme is proposed to be completed within a period of 1 year. The phasing of the
expenditure will be as under:-
Proposed site
1st year 480.70
Total 480.70
PROVIDING STORM WATER DRAINAGE IN VILLAGE DEHLAN LOWER IN TEHSIL & DISTT. UNA
(H.P.) (SH:- CHANNELIZATION OF EXISTING NATURAL NALLAH NEAR PH NO. 4 TO LOWER
DEHLAN FROM RD 00 TO 950 MTRS.)
Superintending Engineer
Jal Shakti Circle Una
Thank you!!
Proposed site