INTRODUCTION TO VACUUM
PRESSURE IMPREGNATION SYSTEM
Drawback of earlier VPI SYSTEM
Failures were due to two types of
problems:
Tape separation
Excessive relaxation of the main
ground insulation
Vacuum Pressure Impregnation of
resin poor insulated jobs
Preheating:the completed stator for
period of 12 hrs at 60 deg ,temp>85deg
11.5.2007
143.1 146.7 145.2 145.1 145.2 33.8
1:30hrs
11.5.2007
144.3 151.0 143.6 144.0 144.7 31.1
4:30hrs
11.5.2007
135.7 142.1 144.3 145.1 145.0 31.3
7:30hrs
11.5.2007
135.0 135.7 135.1 135.0 135.8 34.8
10:30hrs
11.5.2007
135.6 141.4 135.4 135.6 135.9 38.3
13:30hrs
INDO-BHARAT-II ROTOR
Preheating:
Indo Bharat II rotor is loaded for preheating in steam furnace on 30-5-2007 at 18:00hrs.
RESIN POOR SYSTEM RESIN RICH SYSTEM
• The insulation tape used in this system • The insulation tape used in this is 7%
has 40% resin. of 40% resin.
• This method follows thermosetting • Same as in resin poor.
process.
• There is a need for addition of resin • Further addition of resin is not
from outside. required from outside.
• Reduction in time cycle for this • It is very long process and
process time consuming while at processing
stage.
• No tests are carried out while at • Tests are being carried out Stage.
processing
• Processing of bars along with stator
and with conductors and • Processing of stator bars is
processing of exciter Coils only possible in resin rich
along with exciter is possible. systems.
• Repairing work is easy.
• The cost of repair is more • The total cost in this process is more.