GT Start Up Shutdown
GT Start Up Shutdown
STARTUP/ SHUTDOWN
SEQUENCE
WHAT IS SEQUENCING?
1. SEQUENTIAL CIRCUITS ARE PROVIDED TO SEQUENCE THE
TURBINE, THE GENERATOR, THE STARTING DEVICE AND THE
AUXILLIARIES DURING STARTUP, RUNNING, SHUTDOWN AND
COOLDOWN.
2. MONITORS THE PROTECTIVE SYSTEM AND OTHER MAJOR
SYSTEMS SUCH AS THE FUEL, HYDRAULIC LUBE OIL SYSTEMS
AND GENERATOR LOGIC SIGNALS TO PERMIT THE GT TO
START AND STOP IN A PRESCRIBED MANNER
3. LOGIC SIGNALS INCLUDE SPEED LEVEL SIGNALS, SPEED
SET-POINT CONTROL, LOAD CAPACITY SELECTION, FUEL
SELECTION, STARTING MEANS AND THE TIMERS
NORMAL STARTING
PROCEDURES AND SEQUENCES
ASSUMPTIONS
1. INITIAL STARTUP AND CHECKOUTS AND CALIBRATIONS
DONE
2. AC AND DC POWER AVAILABLE FOR ALL PUMPS, MOTORS,
HEATERS AND CONTROL
3. ALL ANNUNCIATOR DROPS (ALARMS) ARE CLEARED
4. TURBINE COOLDOWN OR STANDBY MODE READY FOR
NORMAL OPERATION
STARTING SEQUENCES
1) SELECT “NORMAL” DISPLAY
CRT DISPLAYS :
• SHUTDOWN STATUS
• NOT READY TO START
• OFF COOLDOWN
• SELECT OFF
• STARTING CLUTCH