Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 8

Análisis de los 8

desperdicios de manufactura
LOS 8 DESPERDICIOS DE LA MANUFACTURA

1. Sobreproducción 2. Tiempo de espera 3. Transporte 4. Retrabajo

5. Inventario 6. Movimientos 7. Defectos 8. Conocimiento no


utilizado
1. Transport – Moving 2. Inventory – All 3. Motion – People or
The Eight Types of Waste products that are not components, work in equipment moving or
actually required to process, and finished walking more than is
Are: perform the processing. product not being required to perform the
processed. processing.

4. Waiting – Waiting for 6. Over Processing –


the next production step, 5. Overproduction – 7. Defects – The effort
Production ahead of Resulting from poor tool
interruptions of involved in inspecting for
or product design
production during shift demand. and fixing defects.
creating activity.
change.

8. The Human Potential –


Waste and loss due to not
engaging human
potential.
¿CÓMO SE HACE UN ANÁLISIS DE DESPERDICIOS?
ACTIVIDAD EN CLASE

Identificar puntualmente en el video los 8 desperdicios de la manufactura; describir uno a


uno y socializar en clase. Cuantos desperdicios puedes encontrar?

You might also like