PRESENTATION FOR

ACHIVEMENTS DURING
2022-2023

Parmod Kumar
Creativity & Suggestion Implemented
Improvement by
S.No Location Earlier Sytem Risk with Earlier System Development development Remarks
Layer of LH9,L7 & calcium chloride were Transferring of these layers In-house by doing risk assessment & ATFD stands for evaporation of Cost of 1No's 150Ltr ATFD is
transferred to ETP tanks. resulted in an increase of brain storming we water/solvents to make 2,00,0000Rs so an overall
parameters in the ETP designed ,Fabricated & assembled the concentrated liquid to dry powder saving of 15,00,000Rs after
storage tank i.e High C.O.D, 150ltr ATFD. or flakes. ATFD is the ideal deducting fabrication & raw
High T.D.S & salt deposition apparatus for continuous material cost was done by
which does not meet processing of concentrated designing & fabricating it in-
pollution guidelines. material to dry solids.Lowering of house .
TDS, COD & salt deposition in tanks
1 ETP resulting in better water quality &
pollution Compliance.

NO dozing system in ETP plant for It was not meeting pollution Inhouse by doing risk assesment & It improves water quality & meets The cost of designing,
primary treatment. compliance. brain stroming we pollution compliance. assembling & fabricating the
designed ,Fabricated & assembed the whole primary dosing system
primary dosing system using old was saved.
2 ETP gearbox,motors & shafts.

New Kilo Lab was required for doing No such equipment’s In-house by doing risk assessment & Successful trial for FEXO was done Capital cost 5,75,000Rs was
trial of FEXO in the Masulkhana Plant. available to do such trial. brain storming we designed & & there was saving of company saved & machinery which was
assembled the GLR & SS Reactor capital. in scrapyard was being used.
which were kept in scrapyard in baddi (Details Attached)
plant to fulfill Kilo Lab requirement.

3 KILO LAB
Thank