Professional Documents
Culture Documents
Chunabhatti
Chunabhatti
POPULATION
Age Group Total Population Male Female
Population Population
Total
2,170
1,131 1,039
Children (0-14)
621 324 297
Youth (15-24)
443
231 212
OVERVIEW
SOIL WATER
Untreated sewage and city garbage which S .No. Features Shahpura lake
Period of
is coming to the lakes is responsible for 1 construction 1974-75
decreasing soil quality. Decrease in soil 2Type of Dam Man made perennial lake
quality shows the extent of pollution in 3Latitude 23^{o} 12N
4Longitude 77^{o} 25E
water of these wetlands. Sewage Catchment
contaminating water containing variable 5 area(sq.km) 8.29
6Full tank level(msl) 488.30
amount of heavy metal increases the
Storage capacity
concentration of metal in soil and 10^{6} m^{-}
vegetation. Toxic chemicals through soil 73 2.29
8Max. depth(m) 5.6
and water enter into vegetables, fruits, 9Mean depth(m) 1.5
grains etc and indirectly enter into food Rain sewage water of residential
colony ,irrigation,
chain of human beings and are 10Source of water recreation, Aquaculture
responsible for number of diseases. Irrigation ,recreation &
11Main use of water aquaculture
PROPOSAL
The Following slides contain the
proposed ways to tackle the problems
faced by people of all age groups.
OPEN
SPACE
AREA
AREA- 3.20 ACRES
OPEN
SPACE
PATHWAYS
I propose the establishment of well-designed and eco-friendly
pedestrian pathways within green space. These pathways will be
strategically laid out to connect key points of interest and provide
visitors with a safe, accessible, and enjoyable means of exploring the
park.
Pathway length-2952 f approx. Pathway area- 19375sq f
OPEN
SPACE
Construction estimate-
5.8lakh approx.(30 rupess
per sqf)
FENCING
OPEN
SPACE
Construction estimate-
3.2lakh approx.
(280rupess per sqf)
BENCHES
Number of benches- 28
OPEN
SPACE
Construction estimate-
4.4lakh approx.(16000
rupess per bench include
installation)
PARK
OPEN
SPACE
PLAY AREA
Area- 33000sq f
OPEN
SPACE
PLANTATION
OPEN
SPACE