Professional Documents
Culture Documents
Quality Goal 10.10.23
Quality Goal 10.10.23
Six Sigma”
Sigma Level DPMO Defects % Competitive Level
1σ
691462 69% Non-Competitive
2σ
308538 31% Industry Average
Sigma 3σ
66807 6.7% Industry Average
Scale.
4σ
6210 0.67% High Quality
5σ
233 0.023% World Class
6σ
3.4 0.00034% World Class
Sigma Level DPMO Defects % Competitive Level
1σ 691462 69% Non-Competitive
Our
2σ 308538 31% Industry Average
3σ 66807 6.7% Industry Average
Present 4σ
5σ
6210
233
0.67%
0.023%
High Quality
World Class
99.977%
4σ
5σ
term
Jul 26- Jun 27 99.9997% 6σ
102.000%
Plan for
100.000%
98.000%
Quality
96.000%
94.000%
Goals.
92.000%
90.000%
88.000%
3σ 4σ 5σ 6σ
Jul 22- Jun 23 Jul 23- Jun 24 Jul 24- Jun 26 Jul 26- Jun 27
Process Average DPMO Sigma Level
Incoming Rejection PPM 6607 3σ
Present
In process Rework PPM 33704 2σ
20.00
25.00
40.00
Tank Fabrication-Conservetor
Switchgear-Component Assly
Powder Coating
Shop wise Rework Generation %
Pretreatment-Phosphating
Panel Fabrication-Welding
Panel Fabrication-Bending
Section Cause
Total rework VS Particular
40.00 process contribution %
Laser cutting Burr on cutting
35.00
edge.
In-process
Pretreatment Uncoated
20.00 metal surface
with oil & stain.
Analysis
15.00
Powder Coating
Switchgear-Componen...
Tank Fabrication-Cor...
Panel Fabrication-Wel...
Panel Fabrication-Ben...
Tank Fabrication-Cons...
Tank Fabrication-Mai...
TF Core Frame Cutting section
error.
Shop wise Defect Generation %
25.00
20.00
Analysis
10.00
5.00
0.00
Power Txr Switch Board Instrument Txr
Section Cause
Total Defect VS Particular
shop contribution %. Switch Board PFI Panel control
90.00 wiring connection
80.00 error.
70.00
Final Test
50.00 fail.
40.00
30.00
Instrument Txr Hi-pot test fail
Analysis
20.00
after casting.
10.00
0.00
Switch Board Power Txr Instrument Txr
* If SB & Dry Txr fail in final test it can be repairable. But in the case of Instrument
txr not possible to repair which induced sever impact on our bottom line.
Total Cost of non Quality month
wise
Non
80000
70000
Month Value
60000
Quality 50000
40000
Jul 23
Aug 23
15356
55269
Cost
30000
Sep 23 67246
20000
Analysis
10000
0
Jul Aug Sep
Non
40000
Quality Shop
10000
0
Switchboard Fabrication Shop Instrument Txr
Cost
September Month
40000 Section Value
35000
Analysis
30000 Switchboard 35413
25000
10000
Fabrication 3833
5000
Shop
0
Switchboard Instrument Txr Fabrication Shop
Most significance process for rework in In-process-
of • Switchboard
• Power Txr
• Switchboard
• Instrument Txr
War Against Defect
One
First Kill the big one and continue the
Simple process.
Strategy
Let me know
listening. question.