ARC429 : Housing

Technology Systems in
Housing Delivery
ARC429
ARC429 : Housing

Barriers to Effective Housing Delivery

•Housing affordability
•Project construction and delivery challenges
• land availability,
• material and labor availability,
• technology systems, and
• administrative mechanisms.
ARC429 : Housing

Challenges with Current Housing Projects


construction

• Large housing projects (e.g., 500 or 1000 units)


often take 4 to 5 years or more from inception to
completion.
• Delayed completion is a major issue, largely due to
conventional onsite construction methods.
• Conventional technology and construction systems
contribute to prolonged project durations.
• Rainy seasons, extreme weather, non availability of
materials, labour shortages are also big challanges
ARC429 : Housing

Challenges with Current Housing Projects

• As response to this problem one of the solution is


that to construct the onsite activity to a outside
model where offsite model where the major
construction take place in a factory in terms of
building compounds.
ARC429 : Housing

Time Savings with Industrialized Building


Systems

• Industrialized building systems involve


incorporating industrialized processes outside of the
factory and assembling the product on-site.
• This approach significantly reduces construction
time and enables faster delivery of housing projects.
• Understanding the technical aspects of this system is
crucial to explore its potential in India.
ARC429 : Housing

Options in Industrialized Building Systems

Monolithic units (Boxes)


– 3 dimensional elements

Total system (panel )


– 2 dimensional emelements

Structural (linear)
– 1 dimensional elements

Now let us see which of the situation will be suitable


or useful for India case.
ARC429 : Housing

System adapted in Shirke - MHADA


Foundation – manual - RCC
Floor slabs – Factory made – RCC, AAC
Column beam- Factory made – RCC
Wall block panel – Factory made – Light weight concrete
Finishing – Onsite – Conventional
Fixtures – Onsite – Conventional
ARC429 : Housing