Professional Documents
Culture Documents
Conversion Cycle - Part 2 Pointers
Conversion Cycle - Part 2 Pointers
• The actual production operations begin when workers obtain raw materials
from storekeeping in exchange for materials requisitions. These materials,
as well as the machining and the labor required to manufacture the product,
are applied in compliance with the work order. When the task is complete at
a particular work center, the supervisor or other authorized person signs the
move ticket, which authorizes the batch to proceed to the next work center.
To evidence that a stage of production has been completed, a copy of the
move ticket is sent back to production planning and control to update the
open work order file. Upon receipt of the last move ticket, the open work
order file is closed. The finished product along with a copy of the work
order is sent to the finished goods (FG) warehouse. Also, a copy of the work
order is sent to inventory control to update the FG inventory records.
INVENTORY CONTROL
• TRANSACTION AUTHORIZATION
• The following describes the transaction authorization procedure in the conversion cycle:
•
• 1. In the traditional manufacturing environment, production planning and control
authorize the production activity via a formal work order.
•
• 2. Move tickets signed by the supervisor in each work center authorize activities for each
batch and for the movement of products through the various work centers.
•
3. Materials requisitions and excess materials requisitions authorize the storekeeper to
release materials to the work centers.
SEGREGATION OF DUTIES
• One objective of this control procedure is to separate the tasks of
transaction authorization and transaction processing. As a result, the
production planning and control department is organizationally
segregated from the work centers.
SUPERVISION
1. Cost accounting reconciles the materials and labor usage taken from
materials requisitions and job tickets with the prescribed standards.