Agenda
 Basic Information For Solar System
 Types of Solar Photovoltaic System
 Basic Components of Solar System
 Solar System for Commercial and Industrial (C&I)
 How to Design Solar System with reference site
 ROI calculation for Grid-tied Solar Power System
 BOM calculation for Grid-tied Solar Power System
 Operation & Maintenance (O&M)
 Conclusion

Sunshine Yangon 2
Introduction
What is Solar Energy??

 Energy From the sun


 Heat & Light Radiation
 Clean & Renewable Energy
 During the day, solar cells in solar panels absorb
the energy from sunlight
 Circuits within the cells collect that energy and
turn it into direct current (DC) energy.

Sunshine Yangon
Basic Knowledge of Solar Energy
1. What is the best facing for solar panel ?? 2.Which angle should tilt for solar panel??

 Solar panels work best when they face directly  Tilting the panels to face the sun’s direction optimizes
into the sun. the process of converting sun rays to electricity.

 If you live in the Northern Hemisphere, face  If you not adjusting your panels, set them at a tilt angle
them south. that is equal to your latitude.
Sunshine Yangon
Types of Solar Photovoltaic System
On- Grid or Grid-tied solar system
There are three types of solar power system.

1. On- Grid or Grid-tied solar system


2. Off- Grid solar system
3. Hybrid solar system

Hybrid solar system Off-Grid solar system

Sunshine Yangon 5
Solar Panels
 There are various types of solar panels such as monocrystalline, polycrystalline,
thin-film, PERC, concentrated PV cell and bifacial.

Sunshine Yangon
6
Mounting System
 Mounting system materials Steel (Carbon, Zn-AL-Mg) and Aluminum
 There are many types of solar mounts such as rooftop, ground, carpark,
greenhouse and floating.

 Rooftop Mounting System


There are various types of rooftop mounting system depend on the roof type.

Flat Roof Metal Roof


 Anchor Bolt Mounting System  L feet Tin Roof Mount
 Tripod Mounting System  Rail Free Roof Mount
 Ballasted Roof Mount  Standing Seam Metal Roof Clamp
 Ground Mount system with concrete footing  Adhesive Clamp

Sunshine Yangon
7
Mounting System

L feet Tin Roof Mount Rail Free Roof Mount Standing Seam Metal Roof Clamp Adhesive Clamp

Ballasted Roof Mounting System Tripod Mounting System Anchor Bolt Mounting System Ground Mount system with
Sunshine Yangon concrete footing 8
Mounting System
 Ground Mounting System
 Aluminum Ground Mounting System
• Ground Screw Footing
• Concrete Footing
 Steel Ground Mounting System
 Pile Ground Mounting system

Sunshine Yangon 9
Inverters
 3kVA, 5kVA, 10kVA,15kVA, 25kVA, 50kW, 100kW, etc.
 Off-grid – PCS (Power Control System) Solutions / Container Solutions

How To Choose Inverters


 Solar system Size
 the design of your solar panels and array

Sunshine Yangon 10
Battery
A battery is a device that stores chemical energy, and converts it to electricity.
 Three common types of battery system : 12V, 24V or 48V system

(lithium iron phosphate)

Sunshine Yangon 11
Solar System for Commercial and Industrial

C&I • On Grid or Grid-tied Solar System

Advantages Disadvantages
Renewable Energy Source High Initial Cost
Reduces Electricity Bills Weather Dependent
Reduces Fuel Cost Azimuth
Low Maintenance Costs Fixed Space
No need for Energy Storage

Sunshine Yangon
12
C&I On- Grid Solar System with Elgris

Sunshine Yangon
13
Grid-Tied System ( On-Grid System For Factory)
PV Modules Genset
Grid
(EPC)

ATS Panel
(in Power House)

Grid-Tied Inverter
(Huawei)

Monitoring
System Grid Control System Industry
Sunshine Yangon
How to Design Solar System
Step1.Solar Survey Checkpoint
• Roof measurements and data (roof type, azimuth)

• Solar exposure through shading analysis

• Visual inspection of roof conditions and obstructions

• Information about Existing electrical system

• Load Consumption

Planet Nine EPS Co., Ltd


Sunshine Yangon 15
How to calculate system sizing??
Step 2.Calculate the system sizing??

Case Study1:URC factory has a total load consumption about 450kW. But they wanted to
install around 175kW load consumption as Phase 1.

Installed Load consumption= 170kW


Inverter Sizing = total peak load x 1.3
= 175kW x 1.3
= 230 kW
So, we can choose 110kTLx2nos but we chose 100kTL x 3nos on grid inverter for next Phase.
Solar Sizing = Inverter capacity x 1.25( between 1.2 and 1.3 is the perfect condition )
= 230kW x 1.25
=287 kWp
So, we choose (CAT) 380Wp x 756 panels.

Sunshine Yangon
Block diagram of 274kWp Solar System

Grid(EPC)
Main Load Busbar

COS
ATS CT
Generator`

Huawei Item 1 Item 2 Item 3 Item 4 Item 5


Inverter

Solar Panel

Grid Control
System (Elgris)

Sunshine Yangon
ROI calculation for Grid-tied Solar Power System

Ref: 287.28kWp Rooftop Grid-tied Solar Project ⦻ O&M cost


• 756 panels of 380Wp CAT Solar ⦻ Inflation rate
• 3* Huawei SUN2000-100KTL-M1 Inverter ⦻ Interest rate
• Elgris – Hybrid Controller ⦻ No load usage

Year Cost Reduction


Capital cost (MMK): 700,000,000.00 MMK 1 MMK 178,428,416
Average cost per unit (kWh): 450 MMK 2 MMK 349,719,695

Peak Solar Power: 287.28kWp 3 MMK 529,932,395


4 MMK 706,576,527
Avg Solar Energy Units/month: 33,042.30 Units
5 MMK 883,220,658
Cost Reduction/ month: 14,869,034.65 MMK 6 MMK 1,059,864,790
Cost Reduction/ year: 178,428,415.79 MMK 7 MMK 1,236,508,921
8 MMK 1,413,153,053

Sunshine Yangon 18
ROI calculation for Grid-tied Solar Power System

Year Cost Reduction


1 MMK 178,428,416
2 MMK 349,719,695
3 MMK 529,932,395
4 MMK 706,576,527
5 MMK 883,220,658
6 MMK 1,059,864,790
7 MMK 1,236,508,921
8 MMK 1,413,153,053

Sunshine Yangon
19
Sunshine Yangon
Sunshine Yangon
BOM calculation for Grid-tied Solar Power System

BOM Calculation
C:\Users\waiwa\OneDrive\Desktop\presentation\BOM For Sample Project.xlsx

Sunshine Yangon
22
Reference Site for 287.28kWp Solar Power System

Sunshine Yangon

Sunshine Yangon 23
Reference Site for 287.28kWp Solar Power System

Sunshine Yangon 24
Operation & Maintenance (O&M)
 O&M is one of the most critical ways to ensure that the solar power
system gives the best possible generation.

Access Ladder with cage Safety Guard Rail Safety Life line
25
Sunshine Yangon
Reference Site for 287.28kWp Solar Power System
Hourly Solar Output per day

Hourly Solar Output per day in bad Weather Condition

Sunshine Yangon 26
Reference Site for 287.28kWp Solar Power System

Daily Solar Output per month

Sunshine Yangon 27
Operation & Maintenance (O&M)

Water Pump for Solar


Walk Way Cleaning System
Cleaning System

Sunshine Yangon 28
Monitoring System

Sunshine Yangon 29
Monitoring System

Sunshine Yangon 30
Conclusion
To get a perfect solar system, we must consider …

 Meeting with client


 Site survey ( shading, orientation, tilt angle, Inverter & Battery location, load
consumption)
 Propose the suitable solar system
 Solar Design Simulation
 Discussion for system, budgetary & saving cost per year
 Calculate System Sizing
 Draw complete System layout
 Solar Layout Plan
 Hardware layout Plan ( Walkway, Life Line, Trunking /Cable Tray, Guard rail)
 Cleaning System
 Electrical Single Line
 Monitoring & Control System
 Operation & Maintenance
Sunshine Yangon
Helioscope Simulation
 Sharing For Helioscope Simulation Process
 How to Design?
 Shading Analysis?
 Hand-on Simulation
 Pratice Section

Sunshine Yangon
32
Practice Section

Site Location …. 16.8738933,96.2777612


Summary…Client want to Install the maximum capacity of on-grid solar
system on the Building 1 & building 2. Please calculate the design &
helioscope simulation. And Prepare the Electrical SLD for this project.
Products: Longi 550Wp/ Huawei Sun2000-100kTL-M3

Sunshine Yangon
33