1. If the estimated cost for a residential project is
P10,000,000.00, how much should the Architect
bill the Client upon completion of the Schematic
Design Phase if a downpayment of P50,000.00
has been made upon signing of the agreement ?
A. P50,000.00
B. P100,000.00
C. P150,000.00
D. P200,000.00
2. Approved form of security furnished by the
Contractor and his Surety as a guarantee of good
faith on the part of the Contractor to execute the
work in accordance with terms of the Contract.
A. Guarantee Bond
B. Payment Bond
C. Performance Bond
D. Proposal Bond
3. Which is an unethical action with respect to the
Architect's responsibility to his colleagues and
subordinates?
A. provides free professional service for a charitable
project
B. donates to obtain advantage in a religious project
C. undertakes a commission from another Architect
duly notified
D. serving as professional adviser, accepts
employment as Design Architect for a competition
project
4. Which of the following is a responsibility of the
Architect in the Construction Phase of the Regular
Design Services?
A. P500.00 / 50 km.
B. P500.00 / 100 km.
C. P1000.00 / 50 km.
D. P1000.00 / 100 km.
7. What pre-design service involves investigating,
identifying and documenting the needs of the
client for use in the design of the project?
A. Client
B. Public
C. Contractor
D. Manufacturer
13. Which is included in the Architect's
Professional Fee?
A. income tax
B. professional tax
C. contractor's tax
D. value-added tax
17. Arrange sequentially the following work
according to the 16-division uniform construction
index: i. Thermal and Moisture Protection ii.
Specialties iii.Finishes iv. Doors and Windows
A. i, iii, iv, ii
B. ii, iii, iv, i
C. i, iv, iii, ii
D. ii, iv, iii, i
18. Information, advice or notification pertinent
to the project delivered in person or sent by
registered mail to the individual. firm or
corporation at the last known business address of
such individual, firm or corporation.
A. Instruction to Bidders
B. Invitation to Bid
C. Bid Bulletin
D. Written Notice
19. Additional information on Contract
Documents issued to bidders before date of
bidding.
A. Instruction to Bidders
B. Special Provisions
C. Bid Bulletin
D. Invitation to Bid
20. This shall be issued by the Owner to the
Contractor following the execution of the Contract
Agreement
A. Contract Time
B. Notice to Proceed
C. Contract Sum Breakdown
D. Schedule of Completion
21. Which is an ethical action with respect to the
Architect's responsibility to his manufacturer's,
dealers and agents?
A. 65%
B. 75%
C. 85%
D. 95%
24. Approved form of security furnished by the
Contractor and his Surety as a guarantee to the
quality of the materials and equipment installed
and the workmanship performed by the
Contractor.
A. Guarantee Bond
B. Payment Bond
C. Performance Bond
D. Proposal Bond
25. The act of conceiving, choosing and
developing the type, disposition, arrangement
and proportioning of the structural elements of
an architectural work giving due consideration to
safety, cost-effectiveness, functionality and
aesthetics.
A. structural designing
B. structural work
C. structural conceptualization
D. structural analysis
26. Which combination of types of specifications
is impossible?
A. prepares PERT-CPM
B. review extra work orders claimed by
contractor
C. conducts regular coordination meetings
D. check materials storage
28. What is Division 7 of the 16-division uniform
construction index?
A. Metals
B. Thermal and Moisture Protection
C. Wood and Plastics
D. Doors and Windows
29. Which of the following is the best example in
specification writing?
A. 5 days
B. 10 days
C. 15 days
D. 30 days
31. Which should be avoided in specifications
writing?
A. long sentences
B. simple declarative sentences
C. ambiguous sentences
D. plain words/terms
32. The total cost of all equipment, utilities and
other items which were either designed, specified
or procured by the Architect and his Consultants
for the Owner, that were used or installed in the
project.
A. clerk-of-works
B. maestro de obras
C. contractor
D. construction foreman
34. A cost reimbursement type contract with
provisions for a fee that is adjusted by "sharing"
formulas applied to the difference between the
final allowable costs and the target costs
A. fixed price incentive
B. price adjustment provision
C. cost plus incentive fee
Explanation
D. cost plus fixed fee Fixed Price Incentive - the owner will pay the CM a
fixed fee which is adjusted according to the
difference between the final allowable costs and
the target costs.
Price adjustment provision - the contract price is
adjusted upward or downward in accordance with
a pre-arranged formula.
Cost plus fixed fee - the owner will pay the CM a
fixed fee plus reimbursement of certain expenses
incurred in the performance of basic services.
35. The Project Construction Cost referred to in
the compensation of the Architect for his Regular
Design Fee means the cost of the completed
structure which include one of the following:
Explanation
A. 2 - 5%
B. 3 – 4%
C. 3 - 5%
D. 4 - 6%
38. The Construction Supervision Group is
responsible to the Owner on what matter?
A. technical matters
B. administrative matters
C. design matters
D. construction matters
39. Not among the functions of the Construction
Management Group
A. 10 – 15%
B. 10 - 18%
C. 12 - 15%
D. 12 - 18%
46. What specification type identifies the
manufacturer's name and brand number?
A. closed
B. performance
C. descriptive
D. reference
47. As per PD 223, what would disqualify an
architectural organization to be accredited by the
PRC?
A. 2%
B. 3%
C. 4%
D. 5%
50. A type of specification stipulating the use of
specific product/s or processes without provision
for substitution.
A. Reference
B. Descriptive
C. performance
D. closed
51. Not included in the scope of services for
Interior Design of a music studio commissioned to
an Architect
A. comparative selection
B. design competition
C. bidding
D. direct selection
53. Which component is not considered in the
formulation of the Master Development Plan
under the Comprehensive Planning Services?
A. Site Development
B. Legal and Administrative
C. Economic
D. Transport
54. The client will not have this as basis for
selecting the Architect using comparative
selection
A. personal acquaintance
B. ability to undertake the project
C. references from former clients
D. number of technical staff members
55. What is the minimum basic fee for public
markets with a project construction cost of P50M.
A. P 2.5 M
B. P 3M
C. P 3.5 M
D. P 4M
56. A full-time construction inspector as deemed
necessary shall be engaged and paid for by the
Owner and shall be under the technical control of
whom?
A. Owner
B. Contractor
C. Architect
D. Construction Manager
57. A method of compensation that is flexible,
easy to apply and is related to the size and the
type of the project.
A. comparative selection
B. design competition
C. mixed method
D. direct selection
59. Not a criteria for computing the Architect's
compensation
A. P 2.4 M
B. P 2.8M
C. P 3.2 M
D. P 3.6M
64. What is the minimum basic fee for museums
with a project construction cost of P100M?
A. 8%
B. 10%
C. 12%
D. 15%
65. A method of compensation that represents a
risk situation to the Architect since his costs may
exceed the agreed amount.
A. environmental studies
B. impact analysis
C. examination of laws, ordinances, rules and
regulations
D. engineering drawings and specifications
68. Which work item is chargeable to the Owner
and not included in the regular scope of services?
A. material specifications
B. total floor area
C. degree of project complexity
D. structural components
70. For a housing project exceeding 10 units, how
much is the minimum fee chargeable for each
additional unit, excluding the fees for the first 10
units?
A. research
B. creative work
C. government projects
D. ocular site inspection
72. What is the minimum basic fee for public
health centers with a project construction cost of
P50M or less?
A. 5%
B. 6%
C. 7%
D. 8%
73. A method of compensation frequently used
where there is a continuing relationship on a
series of projects.:
A. PRC
B. DPWH
C. UAP
D. DECS
82. Which of the following is a ground for
suspension and revocation of Certificate of
Registration, Professional Identification Card or
the Special/Temporary Permit?
A. 5%
B. 10%
C. 15%
D. 20%
85. A Master's Degree in Architecture shall be
credited how many months in the practical
experience required of any person applying for
examination?
A. 6 months
B. 12 months
C. 18 months
D. 24 months
86. What is the minimum basic fee for parking
structures with a project construction cost of
P40M?
A. P 2.4 M
B. P 2.8M
C. P 3.2 M
D. P 3.6M
87. Approved form of security furnished by the
Contractor and his Surety as a guarantee to the
quality of the materials and equipment installed
and the workmanship performed by the
Contractor
A. Payment Bond
B. Performance Bond
C. Guarantee Bond
D. Proposal Bond
88. A provision in the Architecture Act of 2004
pertaining to application of a foreign citizen taking
the licensure examinations
A. non-registered person
B. prohibition in practice
C. vested rights
D. reciprocity requirements
89. A method of compensation frequently used
where there is a continuing relationship on a
series of projects.
A. architectural designing
B. structural designing
C. site analysis
D. quality surveys
96. Who shall accredit Continuing Professional
Development providers?
A. UAP
B. Board of Architecture
C. CHED
D. schools of architecture
97. Duly notarized written contract or equivalent
public instrument stipulating the scope of services
and guaranteeing compensation of such services.
A. service agreement
B. general conditions
C. Surety
D. project manual
98. What part of the Architect services is
space/management studies?
A. Contract documents
B. Pre-design
C. Design development
D. Schematic design
99. In a typical owner-architect agreement, which
of the following is NOT part of project
construction cost?
A. Plumbing/electrical fixtures/accessories
B. Landscaping (covered walks, grotto, etc.)
C. Fire-fighting features
D. Fixed closets/cabinets
100. What is the general basis of the Architect’s
minimum basic fee?
A. Contract documents
B. Schematic design
C. Design development
D. Pre-design
103. What PD created the Professional Regulation
Commission (PRC) which regulates the practice of
various professional in the Philippines?
A. PD 1096
B. PD 1185
C. PD 223
D. PD 1000
104. What official body formulates rules and
regulations relating to signing / sealing of
drawings, specifications and other documents
registered by the architect?
A. Licensure Examination
B. Post-Graduate Studies
C. Continuing Professional Education
D. Development Seminars/Workshops
108. In the Architect’s Code of Ethics, to whom
does the architect have responsibility to provide
for arbitration as a method for settlement of
disputes?
A. Contractor
B. Public
C. Manufacturers/dealers
D. Client
109. Which of the following activities is NOT
within the scope of project management?
A.
Building maintenance
B.
Post-construction evaluation
C.
Equipment maintenance (your answer)
D.
Bidding of tenants for rentals/utilities (correct
answer)
111. Under the Architect’s Code of Ethics with
respect to responsibilities to his client , which of
the following is unethical for the Architect to do?
A. Advices client on practicability of the project which
may be questionable even if this causes the loss of the
project to him
B. Considers the need of the client and effects of his
work upon the life and wellbeing of the public
C. Offers free preliminary sketches without the benefit
of an agreement for legitimate compensation
D. Ascertain the exact scope of services with
corresponding professional charges
112. Under the Civil Code, under what condition
can the Architect or Engineer be held liable for
damages within fifteen years after project
completion?
A. Project study
B. Financial feasibility study
C. Economic feasibility study
D. Project development and evaluation
116. What part of Architect’s services is
architectural programming?
A. Schematic design
B. Pre-design
C. Design Development
D. Contract Documents
117. Who advocated the “Virtues of an Architect”,
which has been the basis’s of UAP’s principles of
the Architect’s Code of Ethical Conduct?
A. Louis Sullivan
B. Le Corbusier
C. Frank Lloyd Wright
D. Marcus Vitruvius Pollio
118. Which of the following is NOT within the
scope of the practice of architecture?
A. City/public administration
B. Environmental site analysis and design
C. Feasibility studies, financing, programming,
promotional studies
D. Building maintenance & administration
119. Under what phase of design services does
the architect prepare complete construction
drawings and specifications on
materials/construction methods?
A. Schematic design
B. Contract documents
C. Construction
D. Design development
120. When were the 3 architectural organizations
integrated into one association of architects
called UAP?
A. 1972
B. 1975
C. 1976
D. 1978
121. Which of the following describes the
percentage of project cost compensation method
for architect’s services?
A. 20%
B. 30%
C. 40%
D. 60%
124. Within how many days from the date a
change is ordered shall any claim for adjustment
involving questions of facts be asserted?
A. 5 days
B. 10 days
C. 15 days
D. 30 days
125. Preparation of shop drawing is the sole
function of the:
A. Architect
B. Project Manager
C. Full-time Supervisor
D. Contractor
126. Under Design Services, the minimum basic of
fee of retail stores with project construction cost
P 50 Million and less is
A. 6%
B. 7%
C. 8%
D. 10%
127. The minimum basic fee of parking structure
with a project construction cost of 50 million and
less is
A. 6%
B. 7%
C. 8%
D. 10%
128. Which of the following describes the lump
sum or fixed fee method?
A. 6%
B. 7%
C. 8%
D. 10%
130. The list of instructions stipulating the
manner on how bids are to be prepared and
conditions for the award of contract is:
A. Bid Bulletin
B. Bid Proposal
C. Instruction to Bidders
D. General Conditions
131. Which of the following describes a bid
bulletin?
A. Bill of Materials
B. Closed specifications
C. Manufacturers specifications
D. Open specifications
133. Additional information on contract
documents issued to bidders before date of
bidding is:
A. Supplementary Documents
B. Bid Bulletin
C. Instruction to Bidders
D. Addendum
134. The min. basic fee of publishing plants w/ a
project construction cost of 50 million & less is
A. 6%
B. 7%
C. 8%
D. 9%
135. With a project construction cost of P50
Million & less, the min. basic fee of supermarkets
is:
A. 6%
B. 7%
C. 8%
D. 12%
136. Additional information which maybe used as
an addition or amendment to the provisions of
the standard specifications are:
A. Supplementary specifications
B. Special provisions
C. Bid Bulletin
D. Auxiliary Information
137. In a typical owner-architect agreement, who
is responsible for payment of surveys, soil
explorations, and laboratory fees?
A. Contractor
B. Project Manager
C. Architect
D. Owner
138. Under design services, the min. basic fee of
laboratories w/ project construction cost of P50
million and less is
A. 6%
B. 7%
C. 8%
D. 10%
139. A component to be considered in the
formulation of a master development plan is:
A. Mediation component
B. Legal and administration component
C. Arbitration component
D. Elective Component
140. What is the responsibility of the architect
during the contract document phase of his
services?
A. Construction services
B. Design services
C. Specialized Allied services
D. Post Construction services
142. Compensation for services should be
increased to a total of how many percent of the
basic fee for alterations of existing structures
belonging to groups 5 to 7?
A. 50%
B. 100%
C. 150%
D. 200%
143. A statement from the architect confirming
the amount of money due the contractor for work
accomplished is a:
A. Certificate of Completion
B. Certificate of Payment
C. Certificate of Approval
D. Billing Statement
144. The fee of the architect for designed-build
services on a guaranteed maximum cost aside
from his fee for regular design services is:
A. 5%
B. 7%
C. 10%
D. 12%
145. With a project construction of P50 million
and less, the min. basic fee of public markets is:
A. 6%
B. 7%
C. 8%
D. 12%
146. The minimum fee per appearance of an
architect when rendering services as an expert
shall be
A. P200
B. P500
C. P750
D. P1000