1
Infrastucture of Transmission System in Haryana (As on 28.02.2022)
Sr. Voltage Grid Substations (66 kV & above) HVPNL Transmission Lines
No. Level
Substations Transformers MVA Length
(Nos.) (Nos.) capacity (Circuit KM)
*Constructed by PGCIL
**includes 2 no. BBMB,11 no. PGCIL, 7 no. HVPNL, 3 no. PPP substations.
***includes 8 no. BBMB substations
2
Profitability Position of HVPNL
Financial Year Net Profit/(Loss)
Rs. (In Crore)
2016-17 69.26
2017-18 150.95
2018-19 196.97
2019-20 61.37
2020-21 (161.66)
3
TRANSMISSION SYSTEM AVAILABILITY
Year Certified Deemed HERC
Availability(%) Normative
Target(%)
Cumulative for the year 2016-17 99.0425 99.2
Cumulative for the year 2017-18 98.9518 99.2
Cumulative for the year 2018-19 99.5401 99.2
Cumulative for the year 2019-20 99.8531 99.3
Cumulative for the year 2020-21 99.3282 99.2
Cumulative for the year 2021-22
99.4370 99.2
(upto January, 2022)
4
TRANSMISSION LOSSES
HERC Normative
Financial Year Intra State Losses (%)
Target(%)
2016-17 2.311 2.46
2017-18 2.259 2.44
2018-19
2.055 2.42
2019-20
2.065 2.40
2020-21
2.115 2.15
2021-22
(Up to January, 2022)
1.493 2.10
5
INTEGRATED PLANNING UPTO 2024-25
2022-23 0 3 3 7 13
2023-24 0 6 3 3 12
2024-25 1 2 0 3 6
TOTAL 1 11 6 13 31