TRANSMISSION INFRASTRUCTURE

Sr. No. Category Total HVPNL PGCIL BBMB PPP


No. of S/Stn. S/Stn. S/Stn. Mode
S/Stn.
1 800 kV 1 0 1 0 0
2 765 kV 1 0 1 0 0
3 400 kV 23 7 11 2 3
4 220 kV 91 83 0 8 0
5 132kV 187 187 0 0 0
6 66kV 145 145 0 0 0
Total: 448 422 13 10 3

1
Infrastucture of Transmission System in Haryana (As on 28.02.2022)
Sr. Voltage Grid Substations (66 kV & above) HVPNL Transmission Lines
No. Level
Substations Transformers MVA Length
(Nos.) (Nos.) capacity (Circuit KM)

1 800* 1 - 3552 PGCIL Lines


2 765* 1 2 2000 PGCIL Lines
3 400** 23 64 24315 1015.64
4 220*** 91 253 26120 6492.54
5 132 187 622 16811.5 5254.21
6 66 145 410 9717.50 3547.92
TOTAL 448 1351 82516 16310.31

*Constructed by PGCIL
**includes 2 no. BBMB,11 no. PGCIL, 7 no. HVPNL, 3 no. PPP substations.
***includes 8 no. BBMB substations
2
Profitability Position of HVPNL
Financial Year Net Profit/(Loss)
Rs. (In Crore)
2016-17 69.26

2017-18 150.95

2018-19 196.97

2019-20 61.37

2020-21 (161.66)

3
TRANSMISSION SYSTEM AVAILABILITY
Year Certified Deemed HERC
Availability(%) Normative
Target(%)
Cumulative for the year 2016-17 99.0425 99.2
Cumulative for the year 2017-18 98.9518 99.2
Cumulative for the year 2018-19 99.5401 99.2
Cumulative for the year 2019-20 99.8531 99.3
Cumulative for the year 2020-21 99.3282 99.2
Cumulative for the year 2021-22
99.4370 99.2
(upto January, 2022)

4
TRANSMISSION LOSSES
HERC Normative
Financial Year Intra State Losses (%)
Target(%)
2016-17 2.311 2.46
2017-18 2.259 2.44
2018-19
2.055 2.42
2019-20
2.065 2.40
2020-21
2.115 2.15
2021-22
(Up to January, 2022)
1.493 2.10

5
INTEGRATED PLANNING UPTO 2024-25

Substations (Voltage Level wise)


Financial Year
400kV 220kV 132kV 66kV Total

2022-23 0 3 3 7 13

2023-24 0 6 3 3 12

2024-25 1 2 0 3 6

TOTAL 1 11 6 13 31