Professional Documents
Culture Documents
CHNPP Cooling Pond
CHNPP Cooling Pond
DECOMMISSIONING
Commissioning:
First stage – 1976
Second stage - 1983
Design parameters
Design water level 111 mBES
Area 22.9 km2
Water volume 150 mln. m3
Length 11.4 km
Average width 2.2 km
Average depth 6.6 m
Deepest water 21 m
Length of enclosing dam 21.6 km
Filtration loss 70-100 mln. m3/year
before
2008 1976
Cost of water level maintenance was:
about 5 mln UAH/year
3
The state of the cooling pond was studied since 1986 by different scientific
organizations and institutes within the international projects:
TACIS program;
Program “Improving the Safety of Soviet-Designed Nuclear Power Plants”;
and many others
It is expected that TECDOC will be completed in the near future based on the results of
the joint work (ChNPP, IAEA, Ukrainian and foreign scientists and experts) taking into
account the existing experience
5
In 2014 positive conclusions of the State Regulatory body of Ukraine were obtained.
Preparation for radiation ecological monitoring program implementation:
organizational measures;
procurement of equipment, contracts awarding;
fulfillment of other conditions ...
(completed in 2016)
6
DESIGN SCHEDULE OF ChNPP COOLING POND WATER
LEVEL LOWERING PROPOSED IN FEASIBILITY STUDY
Controlled water level lowering with remediation measures implementation, if necessary
20.10.2014
level 110 mBES
29.08.2016
Level 106.5 mBES
Level
Level110.5
106.0mBES
mBES
9
ПК-34
105.74 mBES
ГТС
105.73 mBES
ПК-94
104.83 mBES
ПК-216
105.78 mBES
ПК-120
104.82 mBES
ПК-34
ГТС
ПК-94
ПК-216
ПК-120
13
Comparison
Comparison of MAX EDR
EDR values outside the CP
Comparison ofof
MAXMAXvalues values
of volume of radioactive
activity в in Zimovishche
substancesterritories,
fallout μSv/h Bq/m3 3
density,
surface layer of the atmosphere, Bq/m
November
December 2016 - -August
20162016 July 2017 and 2008-2013
December - J2017
and and 2008-2013
2008-2013 BNS-3
BNS-3
(according to SSE “Ecocenter” data ) Fire station
AB-1
AB-1
Cs-137 fallout
Placeof
Place of Monitorin VA, МахCL8-13, Мах 2008-2013,
TRC 2008-13,
Мах No.2, Outlet channel
density, Bq/(m2 х EDR,
Place of monitoring µSv/h 2 CL,
3 µSv/h
monitoring
monitoring g Bq/m3 БBq(m
VA, Bq/m
х day) Bq/m
Bq/(m 32
µSv/hх day)
day).
Fire station
Chernobyl 2.3E-04*2.0258.0 E-05 4.8 2.58
2.2E-04
Staroselye 0.23 4.9 8.18
BNS-3
On-shore pumping station-3 1.1E-042.271 5 2.2E-04
2.72
Zimovishche 2.1E-05 2.7E-05
Kopachi Kopachi 0.40 0.99 3.0E-03
9.2 1.9 1.06
11.70
Staroselye Sr-90 4.5E-05 8.9E-05
Staroselye 0.232 0.46 0.32
Kopachi 3.5E-05 8.5E-05
Chernobyl 0.22 5.6 10.60
Control points
Zimovistche 0.962 2.1 1.18 Chernobyl
Chernobyl 3.7E-05 4.0E-05 6.2E-05
14
Maximum
Maximum values
Maximum
values of radioactive
of EDR values substances
outside the CP areas
of volume activity
fallout
indensity
the surface
November 2016 - August 2017 layer
November
December20162016
- August
- July 2017
2017
ГТС base
CL TRC No.1TRC
TRC No.2
Place of of monitoring
Place VA, EDR, CL, µSv/h
No.1,
Monitoring VA, VA, VA,
monitoring Bq/m3 µSv/h µSv/h АК
Bq/m3 Bq/m3 Bq/m3 АК
TRC No.1, TRC No.2, ЦПА
Place of Monitorin Fallout density, ОМТС
ПК 215 9.0E-04 Bq/(m 2
х
8.15E-04 Bq/(m 2
2.49E-03х
monitoring g Bq/(m2 х day.
day) day)
ПК 146 ПК 215 Cs-137 8.7E-04 9.5E-01 9.56E-04 6.8
1.76E-03
ГТС base 9.7E-04 9.35E-04 2.61E-03
АКПКЦПА ПК-215
215 3.5E-0312.00 13.82
6.61E-03 55.72
6.62E-03
“Island"
ПК 146ПКAlpha
146 Cs-137
LLN
2.0
6.60*
2.0E-01
7.53.97 3.6
16.25
АК ОМТС
ГТС base 4.7E-03 3.30 4.8E-03
22.52 4.81E-03
64.42
“Island"
ПК
ПК 215
215 5.1E-04 2.70 9.12
5.18E-04 36.90
1.69E-03
ГТС base 6.5
ПКПК146
146 Sr-90
Sr-90 4.9E-04 0.90
3.0E-01 4.82E-04
1.1 6.18E-04
3.13
ГТС base 5.5E-04 5.68E-04 1.74E-03
ГТС base 0.96 9.92 37.7
АК ЦПА
3.6E-02 4.6E-02 4.65E-02
“Island"
Beta LLN 1.2E+01
АК ОМТС ПК-146
2.3E-02 3.4E-02 3.47E-02 Monitoring
“Island"
wells
15
ПК-64: wells 92/1, 92/2 104.41 105.25 110 1200 950 1200 0.33 1 .6
ПК-113
ПК-113: wells 151/1К,
104.15 104.56 50 820 800 860 0.16 1.4
151/3К
ПК-122
ПК-122: wells 122/1,
105.19 105.25 19 1800 760 1500 0.01 0.19
122/2, 122/3
ПК-127
ПК-127: wells 127/1,
102.8 102.92 12 1100 300 1300 0.09 0.29
127/2, 127/3
16
ChNPP С-19
С-22А,Б С-20
С-23А,Б
2.02 m
С-25
С-27
1.25 m С-26
1.59 m
3. Concerns about "suffocation phenomena" and sharp worsening of water quality under uncontrolled
water level lowering within the first 2 years were misplaced, however, during the summer of 2017, the
ecological balance was unstable in formation of the ChNPP cooling pond water environment quality -
more detailed assessments are made by IHB.
4. At the most part of the surveyed drained cooling pond sections the maximum EDR values do not
exceed 5 μSv/h and are within 2 μSv/h except for some sections in the northern part of the cooling
pond – more in detail will be presented by RS representative.
Not in compliance with forecasts stated in Feasibility Study
1. The values of the Cs-137 and Sr-90 volume activity in the surface air layer are below those recorded
before the beginning of water level lowering
(additional forecasted increasing is not observed)
18
Radiation and ecological status
completion
20
COOLING POND AFTER DECOMMISSIONING