• CERC order dated 26.12.2022. Frequency linked above 50.05 Hz or below 49.9 Hz.
Maximum rate capped at Rs. 12/- unit. Effective from 28.12.2022.
• CERC order dated 06.02.2023. Frequency linked above 50.03 or below 49.95 Hz.
Maximum rate capped at Rs. 12/- unit. No separate rate for Cross Border or Inter
regional transfer. Ancillary service charge not considered for DSM. Effective from
08.02.2023.
• CERC order dated 31.03.2023 capped price to Rs.10/unit from DAM delivery date
(DD) 05.04.2023. RTM DD 04.04.2023. HP Dam price capped at Rs. 20/unit
2
©DGPC
2024
Highlights & Important Terminology
3
©DGPC
2024
Highlights & Important Terminology
• For a period of 1 year from commencement, NROCFD will be equal to the highest of:
- Weighted average ACP of the DAM segments of all the Power Exchanges
- Weighted average ACP of the RTM segments of all the Power Exchanges subject to a
____ceiling of Rs.12/unit
The tariff for sale or purchase of power, as determined under Section 62 or adopted under
Section 63 or approved under Section 86(1)(b) of the Act by the Appropriate Commission or
the price as discovered in the Power Exchange, as the case may be.
4
©DGPC
2024
Deviation Calculation
Rate Time Block wise Rate to be published by NLDC, INDIA post-facto after completion of week.
Week to start from Monday to Sunday.
5
©DGPC
2024
Deviation Charge of Seller
(from 08.02.2023)
50.03 >= f >= 49.95
Seller Over Injection Under Injection (Payable by seller)
General Seller other than Upto 10% or 100MW whichever is less: Upto 10% or 100 MW: @ RCR
RoR and Municipal Solid Amount receivable by seller @RCR 10% (100): 15%(150): @ 120% of NROCFD
Waste Beyond 10% or 100 MW: zero > 15% (150): @ 150% of NROCFD
RoR (Run of the River) Upto 10% or 100 MW whichever is less: Upto 10% or 100 MW: @ RCR
Generating Station Amount receivable by seller @RCR 10% (100): 15%(150): @ NROCFD
Beyond 10% or 100 MW: zero > 15% (150): @ 110% of NROCFD
Municipal Solid Waste Upto 20%: Amount receivable by seller Upto 20%: @ 50% of Contract Rate or in
based Generating Station @Contract Rate or in absence of that @ absence of that @ 50% of weighted average
weighted average ACP of DAM in that Time ACP of DAM
Block. > 20%: @ NROCFD
Beyond 20%: Zero
6
©DGPC
2024
Deviation Charge of Seller
(from 08.02.2023)
50.03 >= f >= 49.95
Seller Over Injection Under Injection (Payable by seller)
WS (Wind or 0 – 10%: Amount receivable by seller @Contract Rate or in Upto 10%: Nil
Solar or Hybrid absence of that @ (WA) ACP of DAM in that Time Block 10%-15%: @ 10 % of contract rate or in
of wind-solar 10 – 15%: Amount receivable by seller @ 90% of Contract absence of that @ 10 % WA ACP of DAM
resources) Seller Rate or in absence of that @ 90% of (WA) ACP of DAM in >15%: @ 50 % of contract rate or in
that Time Block absence of that @ 50 % WA ACP of DAM
Beyond 15%: Zero
WS (Wind) Seller 0 – 15%: Amount receivable by seller @Contract Rate or in Upto 15%: Nil
absence of that @ (WA) ACP of DAM in that Time Block 15%-20%: @ 10% of contract rate or in
15 – 20%: Amount receivable by seller @90% of Contract absence of that @10% WA ACP of DAM
Rate or in absence of that @ 90% of (WA) ACP of DAM in >20%: @ 50% of contract rate or in
that Time Block absence of that @50% WA ACP of DAM
Beyond 20%: Zero
7
©DGPC
2024
Deviation Charge of Buyer
(w.e.f. 08.02.2023)
50.03 >= f >= 49.95; including CB and IR
Buyer Under Drawl ( Receivable by buyer) Over Drawl (Payable by buyer )
Buyer (except RE rich Upto 10% or 100 MW which ever is lower: Upto 10% (or 100 MW): @ NROCFD,
state and buyers with @ 90% of NROCFD 10% (or 100 MW): 15% (or 200 MW): @ 120%
schedule < 400 MW ) 10% (or 100 MW): 15% (or 200 MW): @ of NROCFD
50% of NROCFD > 15% (or 200 MW): @ 150% of NROCFD
>15%: Zero
Buyer with schedule < Upto 20% or 40 MW which ever is lower: @ Upto 20% (or 40 MW): @ NROCFD
400 MW 90% of NROCFD > 20% (or 40 MW): @ 120% of NROCFD
> 20%: Zero
RE rich Buyer Upto 200 MW: @ 90% of NROCFD 200 MW: @ NROCFD,
200 MW – 300 MW: @ 50% of NROCFD 200 MW – 300 MW: @ 120% of NROCFD
> 300 MW: Zero > 300 MW: @ 150% of NROCFD
8
©DGPC
2024
Deviation Charge (Buyer)
As per CERC DSM order dated 06-02-2023
For Frequency < 49.95 Hz
Buyer Under Drawl (Receivable by buyer) Over Drawl (Payable by buyer )
All Buyer When 49.90 < f < 49.95: @ 120% of NROCFD When 49.90 < f < 49.95: @ 150% of NROCFD
When f <= 49.9: @ 150% of NROCFD When f <= 49.9: @ 200% of NROCFD
No volume deviation limit For any volume deviation
9
©DGPC
2024
Important Provisions
RLDC RPC
• Publishing DSM statement by
• Deviation calculation to RPC’s by ensuing Tuesday (W2).
Thursday ( W1) for previous Week (W0)
i.e. Monday to Sunday. • Maintaining Separate books of
account for Principal and Interest
• Operation and maintenance of Deviation component.
and Ancillary Service Pool account.
11
©DGPC
2024
Deviation and Ancillary Service Pool Account
12
©DGPC
2024
Salient Points
• In case of deficit in the Deviation and Ancillary Service Pool account of a Region,
surplus amount available in other Region could be used.
• In case of overall deficit, the balance shall be recovered through the RLDC Fees and
Charges.
• Due date for DSM payment will be 7 days from the issuance of statement. Delay in
payment will attract the surcharge of 0.04% per day.
• If any regional entity fails to deposit the payment any time in previous financial year, it
shall be required to open a Letter of Credit (LC) equal to 110% of their average payable
weekly liability for deviations in the previous financial year.
13
©DGPC
2024
Deviation Charge of Bhutan (Buyer)
As per CERC DSM order dated 06-02-2023 w.e.f. 08-02-23
For Frequency Range 49.95 to 50.03
Buyer Under Drawl (Receivable by buyer) Over Drawl (Payable by buyer )
Buyer (except RE rich Upto 10% or 100 MW which ever is lower: @ Upto 10% (or 100 MW): @ NROCFD,
state and buyers with 90% of NROCFD 10% (or 100 MW )- 15% (or 200 MW): @ 120%
schedule < 400 MW) 10% (or 100 MW) – 15% (or 200 MW ): @ of NROCFD
50% of NROCFD > 15% (or 200 MW): @ 150% of NROCFD
>15%: Zero
Buyer with schedule Upto 20% or 40 MW which ever is lower : @ Upto 20 % (or 40 MW): @ NROCFD
< 400 MW 90 % of NROCFD > 20 % (or 40 MW): 120% of @ NROCFD
> 20%: Zero
The charges for deviation in respect of cross-border transactions, caused by way of over drawal or under drawal or over
injection or under-injection shall be payable or receivable, at the deviation charge rates and subject to volume limits as
applicable to a seller (of respective category) or to a buyer (other than an RE-rich State), as the case may be.
14
©DGPC
2024
Deviation Charge of Bhutan (Buyer)
As per CERC DSM order dated 06-02-2023 w.e.f. 08-02-23
For Frequency < 49.95 Hz
Buyer Under Drawl (Receivable by buyer) Over Drawl (Payable by buyer )
All Buyer When 49.90 < f < 49.95: @ 120% of NROCFD When 49.90 < f < 49.95: @ 150% of NROCFD
When f <= 49.9: @ 150% of NROCFD When f <= 49.9: @ 200% of NROCFD
No volume deviation limit For any volume deviation
15
©DGPC
2024
Deviation Charge of Bhutan (Seller)
As per CERC DSM order dated 06-02-2023 w.e.f. 08-02-23
For Frequency Range 49.95 to 50.03
Seller Over Injection Under Injection (Payable by seller )
General Seller other Upto 10% or 100 MW whichever is less: Upto 10% or 100 MW: @ RCR
than RoR and Municipal Amount receivable by seller @RCR 10% (100) – 15%(150) : @ 120% of NROCFD
Solid Waste Beyond 10% or 100 MW: zero > 15% (150) : @ 150% of NROCFD
RoR (Run of the River) Upto 10% or 100 MW whichever is less: Upto 10% or 100 MW: @ RCR
Generating Station * Amount receivable by seller @RCR 10% (100) – 15%(150): @ NROCFD
Beyond 10% or 100 MW: zero > 15% (150): @ 110% of NROCFD
The charges for deviation in respect of cross-border transactions, caused by way of over drawal or under drawal or over
injection or under-injection shall be payable or receivable, at the deviation charge rates and subject to volume limits as
applicable to a seller (of respective category) or to a buyer (other than an RE-rich State), as the case may be.
17
©DGPC
2024
DSM in transactions with Bhutan through PTC
ERPC
Issues weekly DSM