• Check descriptions on
nameplates of equipment
– they should be matched
with “PDI report”.
18
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
(2/2) Do not start assembly if:
19
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Electrical Motor Installation
21
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Check for hoist centering; ensure section
base is at the wellhead center
22
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Set motor into the well until pump/motor
clamp rests on wellhead flange
23
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Clean upper shipping cap and motor socket
cap with cloth from dirt and dust
24
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Open motor socket cap
25
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Check insulation resistance of electrical
motor with megger for 1000 V
27
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
- Lift motor over the well, remove plug of fill
valve at motor base
28
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Attention!
29
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Fit in priming pump
nipple into fill valve hole
and slowly inject oil to
remove air from the hole
in the fill valve;
without stopping screw
priming pump nipple into
fill valve hole
30
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Inject oil into motor
at rate of 15-20
strokes/min until it flows
out of the motor socket.
Leave for 5 min to settle,
then repeat operation.
Perform 2 or 3 injecting
cycles each followed
by 5 min pause.
32
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Check tightening
of a fill valve
with Wrench×0.75”
(19 mm) with torque
50 N-m (35 lb-ft)
33
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Set motor into the well until pump/motor
clamp rests on wellhead flange.
Motor socket cap shall be oriented
to cable spooler.
34
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Clean upper shipping
cap with cloth from
dirt and dust.
36
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Put shipping cap
on head to prevent motor
cavity contamination
37
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Tandem Electrical Motor Assembly
38
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
The sequence is the
same as for the single
motor
When we connect the
upper motor it’s
necessary to replace
O-rings with new ones
from assembly kit.
Remove shipping cap
from head of lower
tandem.
Rotate shaft of upper tandem to align shaft spline and hole for
centering pin
Use Hydraulic jack and shaft positioning device (for 2.17 and 3.19
inch Motor OD) to connect the motors, to make sure the splines will
fit into the grooves
Attention!
Shaft of upper tandem should connect with spline coupling of bottom
shaft, sleeves should match with pins and this way
electrical joint of tandems is done.
39
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Put on spring washers and nuts on
studs. Tighten the joint uniformly,
check tightening by torque wrench
39.2±4.9 N-m
Lift motor a bit, remove pump/motor
clamp from lower tandem and set
motor until pump/motor clamp rests
on wellhead flange.
Wipe shipping cap of upper tandem
with cloth to remove dirt and dust.
Half-open top shipping cap and
remove cap from motor socket.
Check insulation resistance of motor
with megger at 1000 V. Insulation
resistance should be not less than 200
MΩ.
Minimum insulation resistance for
motors with downhole sensor will be
specified in technical specification for
down-hole sensor system.
40
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Lift motor until lower tandem base is out,
remove plug from check valve of lower tandem
base, remove air from priming pump nipple and
screw priming pump nipple.
Attention! If rig’s height is limiting to pull
whole motor, it is allowed to inject oil through
plug in base of upper tandem.
Slowly inject oil into motor until it flows out
of motor socket of upper tandem head.
Leave for 5 min to settle, then repeat
operation. Lifetime of ESP system is limited
without that operation.
Remove priming pump nipple, screw plug
with new lead washer from assembly kit and
tighten plug with torque 15 N-m.
Set motor into the well until pump/motor
clamp rests on wellhead flange.
41
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Protector installation
42
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Protector series: 338, 362, 406
Mount pump/motor clamp on head
of protector
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Remove plug from upper shipping cap.
Install pressure test tool onto the upper shipping cap
44
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
- Lift protector above well.
- Remove bottom shipping cap.
- Clean flange with cloth.
- Ensure flange has no cracks or chips.
45
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
On the base replace O-rings for new ones
from installation parts kit.
46
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Remove shipping cap
from motor head;
Remove spline coupling
from motor shaft,
Check that spline coupling
fits to bottom end of
protector shaft in three
random positions and
put spline coupling
on motor shaft
47
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Check for free shaft rotation of protector,
rotation should be without jamming.
48
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Align flats on protector
base flange and motor
head, then joint units
50
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Remove plug from fill valve at motor head
51
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Screw priming pump
nipple into fill valve
hole.
Inject oil with priming
pump until it flows out
of the motor socket
without air bubbles
52
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Unreel cable from top of the reel and put
MLE with MLE plug through cable sheave
in the way that two terminals of the MLE
plug shall take upper position against
ground surface. Be accurate when unreeling,
do not pull along MLE plug.
53
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Remove shipping cap from MLE plug
54
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Remove O-ring from
motor socket groove,
and replace it
with a new one
55
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Inject oil with priming pump until it flows out of the motor
socket without air bubbles
56
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Connect MLE plug to motor socket
57
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Suck off oil with rubber
squirt from threaded
holes in motor head;
59
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Check insulation resistance of the system “cable-motor” with
megohmmeter on the other side of cable line. It should be not less
than 100 MΩ. Insulation resistance for motors with downhole
sensor will be prescribed in technical specification on downhole
sensor system;
Check Y-connection of “cable-motor” circuit
Discharge cable conductors through megohmmeter with such
option..
ATTENTION! If downhole sensor system is used, discharge must
be done only through limiting resistance or with the help of
megohmmeter with such function.
66
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
- Lift motor and protector and remove
pump/motor clamp from motor head;
- Remove pressure test tool from protector;
- Put in protector and motor until
pump/motor clamp rests on fitting flange;
67
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
- Remove pressure test cap and ensure free
shaft rotation with spline wrench
68
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Mounting of protector series 319, 449, 484, 677,
protector 338, 535 is carried out the same way as
for improved protector design series 338, 362, 406,
except for the sequence of flushing:
N319P V 1, V 3, V 5
N338P (LSBPBSL) D 2, D 4, V 2, V 3
N535P V 1, V 2, V 3
NXXXMP (BSL, LSBPB) V 2, V 3
NXXXMP (LSBSB) V 2, V 3, V 4
69
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
In modular protector
remove three plugs from plug holes
with no labeling in upper nipple
(if they are present)
70
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Tandem protector installation
N362TMP
036.238.0010 2024010627 42 (1.65) 50 (1.97) 132 (5.20)
N406TMP
79
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Put spring washers
on studs, screw nuts on them and
tighten nuts with wrench to be 53.9±2.6 N-
m (39.8±2.0 lb-ft)
80
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Mount pump/motor clamp on pump head
Lift pump unit above wellhead
81
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Remove lower shipping cap from
pump base, remove spline
coupling, check shaft for free
rotation with wrench. Ensure
shaft rotation is free, without
seizing and excessive torque;
Remove O-ring from centering
base collar and replace it with a
new one from installation parts
kit;
Take into account unit length,
temperature, lubricant which
impact on friction and may brake
rotation.
82
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Slowly lower the unit until
pump shaft joins to spline
coupling. Continue
lowering till pump flange
touches intake (or
protector) head flange.
Attention! Ensure flats on
pump section flange and
intake module base are
aligned. Put spring
washers on studs. Tighten
nuts with wrench to
53.9±2.6 N-m (39.8±2.0
lb-ft)
83
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Attention!
85
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
- Smoothly put the unit
down, lay flat cable along
generating line with
protector housing, fasten
cable with band within 8”-
10” (200-250 mm) from
joint with intake
86
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Lower the unit more, lay
flat cable along
generating line with
intake, lay the cable
between unit ribs and
fasten it with bands to
intake module above the
screen and to unit above
ribs
88
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Remove bottom shipping cap, pull out
spline coupling, remove O-ring from centering base
collar and replace it with a new one from
installation pasrts kit
89
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Check shaft for free rotation with wrench.
-Remove shipping cap from lower pump section set
into well, check shaft for free rotation with wrench
90
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Put spline coupling of
upper section on spline
end shaft
91
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Lower the upper (second)
section so that shaft
splines join to spline
coupling of lower (first)
section, set into well,
then lower until flanges
touch, ensuring ribs are
aligned
92
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Tighten the joint evenly, check tightening
with torque wrench 39.8±2.0 lb-ft
(5.5±0.27 kgf-m)
93
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Lift unit, remove
pump/motor clamp from
lower shroud head , lay
flat cable along
generating line, lay the
cable between ribs of
upper section and fasten
with bands to lower
section near head and
upper section above ribs
94
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Slowly lower the unit, lay cable along
generating line with upper section housing,
and fasten it in the middle.
96
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Remove shipping cap from upper section discharge
head. Check the whole ESP system for free rotation
(fit spline coupling if possible). Perform phasing
with phase indicator
One operator must rotate
shaft with wrench
clockwise at frequency 60
RPM and the other
operator must mark
phases A, B, C on the reel
with phase indicator at
the end of cable line.
This step is to ensure
istallation of all spline
couplings
97
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Attention!
99
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Screw tubing to discharge head. Torque
thread with wrench to tighten the tubing
100
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Monitor mounting of drain and fill valves
on tubing, performed by well workover team,
if the installation plan says so
101
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Attention!
102
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
ATTENTION!
104
not just another ESP Provider © NOVOMET |WWW.NOVOMET.RU/ENG | 2017
Actions in case of problems 2/2
It is impossible to rotate 1. Coupling does not fit 1. Replace spline coupling, clean grooves
shaft with hand fully in coupling with broach file if there are
2. Pump section is frozen any burrs or chips.
3. Improper shaft 2. If installation is performed in winter,
overhang length possibly there is water in the pump and
due to low temperature pump
is frozen. In that case use steam blower
to heat stuck unit and check rotation
again.
3. Remove the shim from shaft end to
get the size, if it is not possible then
replace the pump section.
106