Group 1 Presentation EE-I

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 15

KHANPUR LAKE/

DAM CLEANUP
PROJECT
GROUP MEMBERS
20-CE-21 Muhammad Usman
20-CE-33 Zakariya Zaman
20-CE-37 Muhammad Awais
20-CE-61 Muhmmad Umair Raza
20-CE-157 Yousef Sheikh Parvez
20-CE-177 Danish Zahid
20-CE-185 Rasool Noor Shah
20-CE-189 Muhammad Shafi

20XX Pitch deck title 2


INTRODUCTION

Khanpur Lake/Dam is a significant natural


resource and a popular tourist destination in our
area. However, recent observations have
highlighted the growing concern of pollution and
littering in and around the lake.

3
OBJECTIVE

The primary objective of this cleanup


project is to restore and preserve the
natural beauty of Khanpur Lake/Dam while
raising awareness about the importance of
environmental conservation among the
local community and visitors.

4
KHANPUR LAKE/DAM:
OVERVIEW

5
KHANPUR LAKE/DAM: OVERVIEW
Khanpur Dam, located in the Haripur District of Pakistan, is a significant
reservoir built on the Haro River. The dam was completed in 1983 and has a
storage capacity of approximately 110,000 acre-feet

Vital Water Source Recreational Environmental


• Irrigation Activities Challenges
• Domestic use • Fishing
• Hydroelectric
• Pollution
• Boating • Littering
power • Hiking

6
NEED FOR CLEANUP

Environmental Water
Preservation Quality

Aesthetic Wildlife
Appeal
Protection

Public
Sustainable
Health and Tourism
Safety

7
OBJECTIVES FOR CLEANUP OF KHANPUR LAKE/DAM:

ENVIRONMENTAL POLLUTION PREVENTION:


CONSERVATION:
The primary objective of lake cleanup The cleanup aims to remove pollutants
project is to conserve and protect the and debris from the lake, preventing
natural environment of the lake and further contamination
its surrounding ecosystem.

RESTORATION OF NATURAL COMMUNITY ENGAGEMENT


BEAUTY: AND EDUCATION

Khanpur Lake is often cherished for its The lake cleanup project provides an
scenic beauty and recreational value. opportunity to engage the local
community and raise awareness about
the importance of environmental
stewardship.

8
OBJECTIVES FOR CLEANUP OF KHANPUR
LAKE/DAM:
ENHANCEMENT OF WATER RECREATION

Khanpur lake serve as a popular recreational area


for activities such as swimming, boating, and
fishing.

SUSTAINABLE MANAGEMENT

The cleanup project may include implementing sustainable


management practices for the lake, such as waste management
systems, recycling initiatives, and the promotion of eco-friendly
practices.

9
PLANNING AND PREPARATION

Identify Goals and Assess the Current Seek Permits and


Objectives Situation Permissions

Secure Necessary
Develop a Cleanup Arrange Waste
Equipment and
Plan Disposal
Supplies

Evaluate and
Ensure Safety
Document the
Measures
Project
10
CLEANING
METHOD/APPROACH
o For the cleaning of Khanpur Dam, we employed a manual
cleaning approach.
o Our team of dedicated students carefully and diligently
undertook the task of removing debris, sediment, and vegetation
from the reservoir, ensuring that hard-to-reach spots and sensitive
sections of the dam were thoroughly cleaned.
o By utilizing manual labor, we were able to achieve a detailed
and precise cleaning, addressing specific areas that required
attention.
o Through our dedicated efforts, we tried to ensure that Khanpur
Dam remained in optimal condition, promoting its functionality
and long-term sustainability.
11
SAFETY MEASURES

Team
Site Inspections Task Allocation Communication
and Supervision

Emergency
Regular Breaks
Response Plan

12
WASTE MANAGEMENT AND
DISPOSAL APPROACHES
Waste • implemented a system to separate different types of
waste, enabling efficient waste management .
Segregation
• Hazardous waste materials were handled and disposed of
Safe Disposal according to regulations, ensuring the safety of the
environment and personnel.

Collaboration • Collaborated with local waste management authorities to


adhere to waste disposal guidelines and regulations specific
with Authorities to Khanpur Dam.

Responsible • Waste materials were safely transported to designated


disposal or recycling facilities, following proper
Transportation containment and securing procedures.

Environmental • Waste disposal avoided environmentally sensitive areas or


bodies of water, preventing negative impacts on the
Protection surrounding ecosystem.
13
CONCLUSION
In conclusion, the cleaning process at Khanpur Dam was successfully
carried out with a focus on safety, waste management, and environmental
awareness. Through the implementation of realistic safety measures, we
prioritized the well-being of our team members and ensured a secure
working environment. The adoption of effective waste management and
disposal approaches allowed for responsible handling of waste materials,
including segregation, recycling, and proper disposal. Additionally, our
outreach and awareness initiatives aimed to engage the community, raise
environmental consciousness, and promote the long-term preservation of
Khanpur Dam. Together, these efforts contributed to the cleanliness,
sustainability, and enhanced ecological health of the dam and its
surroundings