Welcome to
Hon’ble Director (CFA)
TN Circle
20/07/2023
A1 - BBC wise FTTH Target
Achievement of
Number of BBC
July FTTH BBCs Total FTTH Free ONT
BA Total BBC Configured in
Target Target in IPMS Scheme in July
IPMS with Target
(upto 15 )
th
Trichy 363 45 5 4 5 5
Tirunelveli 414 45 15 1 15 15
Vellore 281 36 12 1 12 12
A-4.3 OLTE Loading Report
(as on 30.06.2023)
% OLTEs where % OLTEs where % of OLTEs with
Total OLTEs Av. Loading of %Red
customer count is customer count is customer base
working customers OLTEs
less than 50 between 50-80 more than 80
Pondicherry 1 239 1 0 0
Salem 18 504 18 0 0
Thanjavur 11 354 11 0 0
Trichy 14 363 14 0 0
Tirunelveli 11 414 11 0 0
Vellore 12 281 12 0 0
A-4.5 Status of down OLTEs
(as on 30.06.2023)
Number of OLTEs Number of OLTEs % number of OLTEs
Total working
down down more than 24 having downtime >
OLTEs
6 hrs-24 hrs Hrs 24hr
Partners Training
Thanjavur 5 yes
Trichy 10 yes
Tirunelveli 7 yes
Vellore 8 yes
A-8 OLTE Inspection Report Q1 of FY
2023-24
S. BA SSA Total Total Number of OLTEs inspected by Inspection by Inspection by
No. OLTEs BBCs BBCs OA Head BA Head
April-23 May-23 June-23
Circle 3889 156 454 780 505 228 36
1 Coimbatore 366 12 2 11 4 0 0
CBT
2 Ooty 75 4 1 7 2 0 0
3 CDL Cuddalore 236 7 26 18 0 0 0
4 ERD Erode 280 11 0 9 12 6 1
5 Madurai 242 9 7 30 14 0 0
6 MDU Karaikudi 131 3 0 12 1 0 0
7 Viruthunagar 113 4 0 41 0 0 0
8 NGC Nagercoil 291 17 260 270 255 156 3
9 PDY Pondicherry 239 6 56 61 63 8 8
10 Salem 288 13 8 32 17 12 2
SLM
11 Dharmapuri 216 6 16 23 33 16 2
12 Thanjavur 188 9 0 54 2 12 12
TNJ
13 Kumbakonam 167 7 0 17 2 8 8
14 TRY Trichy 363 14 21 83 36 0 0
15 Tirunelveli 244 12 0 39 5 0 0
TVL
16 Tuticorin 170 8 33 41 29 10 0
17 VLR Vellore 281 14 24 32 30 0 0
A-9 BharatNet Utilization
Bharatnet Udyami
Achievement No. of Bharatnet No. of OLTEs
(Q1 FY 2023-24) Udhyamis installed GPs Average
Bharatnet
Circle/ Udyami connectio
BA Target n/ partner
(Q1 FY in 2023-
2023-24) 24
No. of BNU % Enrolled Enrolled
Achieveme As on As on Uptime
Achieve in FY 23- in FY 23- Covered
nt 31.03.23 31.03.23 >90%
ment 24 24
%
No of disconnection
Actions to
Reasons for disconnection due to such
S.N. arrest
disconnections to such reasons(Out of
disconnections
reason Total
disconnection)
Any sponsor for
payment from Govt. to
1 Affordability of Service 13 8.07
be arranged/ students
plan etc
Customer not interested
2 4 - 2.48
/no use
S.N. Reasons for low enrollment of Udyami Actions for new enrollment of Udyami
PY/TN 34 - - 17 7 - 27
TNJ 9 - - - - - Nil
A 9.8 Pendency UCs Incentive Invoices
14 =
11 = 7-
1 2 3 4 5 6 7 8 = 2-6 9 = 6-7 10 12 13 (13/12)*1
10
00
TN 1506 155 183 145 1383 1341 123 42 1303 38 172 105 39%
B-1 Copper to Fibre Migration Status
Coimbatore 10 32 4 5
Cuddalore 34 11 10 0
Erode 19 20 2 1
Madurai 89 31 17 2
Nagercoil 1 3 0 0
Pondicherry 0 0 0 0
Salem 57 34 8 1
Thanjavur 29 6 16 1
Trichy 35 13 18 1
Tirunelveli 28 12 7 2
Vellore 57 14 11 0