Single Stage Calculations

Volumes to be Calculated : Step A


1. Casing in casing
1
Previous
Casing

Open Hole

3 Collar
Shoe

2 Single Stage Cementing


Volumes to be Calculated : Step A
1. Casing in casing 1
Previous
Casing
2. Casing in open hole

2 Open Hole

3 Collar
Shoe

3 Single Stage Cementing


Volumes to be Calculated : Step A
1. Casing in casing 1
Previous
Casing
2. Casing in open hole

3. Inside casing
(between collar and shoe)
2 Open Hole

3 Collar
3
Shoe

4 Single Stage Cementing


Cement Calculations
 Volume of open hole below the casing shoe is not
calculated.
 Cement circulates out of the shoe and up the annulus.
 Any cement displacing the mud below by gravity is
considered negligible.

5 Single Stage Cementing


Problem 1
Casing : 7” - 32 LB/Ft
Shoe : 4600’
Collar : 4510’
Previous casing : 9 5/8 - 47 LB/Ft
Shoe : 2670’
Open hole : 8.5”
Top of cement : 1000’
Calculate Total Amount of Slurry Required in CuFt
6 Single Stage Cementing
Solution
Capacities

1. Cas-Cas - 0.1438 cuft/ft

2. Cas - OH - 0.1268 cuft/ft 1000ft


1
3. Cas - 0.2025 cuft/ft, 0.0361 bbl/ft

Volumes
2670ft

4510ft
3
3
4600ft

7 Single Stage Cementing


Solution
Capacities

1. Cas-Cas - 0.1438 cuft/ft

2. Cas - OH - 0.1268 cuft/ft 1000ft


1
3. Cas - 0.2025 cuft/ft, 0.0361 bbl/ft

Volumes
2670ft
1. (2670ft - 1000ft) x 0.1438 cuft/ft = 240.2 cuft
2

4510ft
3
3
4600ft

8 Single Stage Cementing


Solution
Capacities

1. Cas-Cas - 0.1438 cuft/ft

2. Cas - OH - 0.1268 cuft/ft 1000ft


1
3. Cas - 0.2025 cuft/ft, 0.0361 bbl/ft

Volumes
2670ft
1. (2670ft - 1000ft) x 0.1438 cuft/ft = 240.2 cuft
2
2. (4600ft - 2670ft) x 0.1268 cuft/ft = 244.7 cuft
4510ft
3
3
4600ft

9 Single Stage Cementing


Solution
Capacities

1. Cas-Cas - 0.1438 cuft/ft

2. Cas - OH - 0.1268 cuft/ft 1000ft


1
3. Cas - 0.2025 cuft/ft, 0.0361 bbl/ft

Volumes
2670ft
1. (2670ft - 1000ft) x 0.1438 cuft/ft = 240.2 cuft
2
2. (4600ft - 2670ft) x 0.1268 cuft/ft = 244.7 cuft
4510ft
3
3
3. (4600ft - 4510ft) x 0.2025 cuft/ft = 18.2 cuft
4600ft

10 Single Stage Cementing


Solution
Capacities

1. Cas-Cas - 0.1438 cuft/ft

2. Cas - OH - 0.1268 cuft/ft 1000ft


1
3. Cas - 0.2025 cuft/ft, 0.0361 bbl/ft

Volumes
2670ft
1. (2670ft - 1000ft) x 0.1438 cuft/ft = 240.2 cuft
2
2. (4600ft - 2670ft) x 0.1268 cuft/ft = 244.7 cuft
4510ft
3
3
3. (4600ft - 4510ft) x 0.2025 cuft/ft = 18.2 cuft
4600ft
TOTAL VOLUME = 503.1 CUFT
11 Single Stage Cementing
Excess

Excess in only calculated on Annular


Volume in THE OPEN HOLE

Only
Here

12 Single Stage Cementing


Example: Problem 1
 OH 50% Excess

 OH volume (2) of the previous problem: 244.7


cuft

 Excess Volume: 244.7 cuft x 50/100 = 122.35


cuft

Total OH Volume: 367.05 cuft

 OR 244.7 cuft x 1.50 = 367.05 cuft


13 Single Stage Cementing
Slurry Yield - Step B

The volume of slurry produced when one sack of cement is


mixed with water is called

YIELD

14 Single Stage Cementing


Slurry Yield - Step B
The volume of slurry produced when one sack of cement is
mixed with water is called
YIELD

CEMENT
+

15 Single Stage Cementing


Slurry Yield - Step B
The volume of slurry produced when one sack of cement is
mixed with water is called
YIELD

CEMENT
+ WATER =

16 Single Stage Cementing


Slurry Yield - Step B
The volume of slurry produced when one sack of cement is
mixed with water is called
YIELD

CEMENT
+ WATER = SLURRY

The unit of slurry yield is cuft/sack

17 Single Stage Cementing


Note:
1 sack of cement = 1 cuft
of 94 lbs

4.97 gals of water = 0.66 cuft

18 Single Stage Cementing


Note:
1 sack of cement = 1 cuft
of 94 lbs

4.97 gals of water = 0.66 cuft

1 cuft + 0.66 cuft = 1.66 cuft

19 Single Stage Cementing


Note:
1 sack of cement = 1 cuft
of 94 lbs But the
Handbook states:

4.97 gals of water = 0.66 cuft 1.15 cuft/sack

WHY ?
1 cuft + 0.66 cuft = 1.66 cuft

20 Single Stage Cementing


Bulk vs Absolute
One drum full
of dry cement
(1 drum = 1 cuft)

Same size drum


0.66 of water

21 Single Stage Cementing


Bulk vs Absolute
One drum full
of dry cement
(1 drum = 1 cuft)

Pour water
into cement
Same size drum
0.66 of water
Air in pore spaces will
be displaced by water

22 Single Stage Cementing


Note
Yield varies with density
Basically, when you change the density you alter the

Water / Cement ratio


....this changes the yield

Normally ........
as you increase the water content the yield increases
23 Single Stage Cementing
Step C - Cement Calculations
 If you know what volume of slurry a sack of cement
[YIELD] produces at a certain weight, you can
calculate the amount of sacks required when you
know a volume.

24 Single Stage Cementing


Step C - Cement Calculations
 If you know what volume of slurry a sack of cement
[YIELD] produces at a certain weight, you can
calculate the amount of sacks required when you
know a volume.

VOLUME[cuft]
= Sacks
YIELD [cuft/sacks]

25 Single Stage Cementing


Example: Problem 1 (Continued)
Previous Problem:
Lead volume [1] : 240.2 cuft Tail volume [2 + 3] : 367.05 cuft
+ 18.2 cuft
385.35 cuft

26 Single Stage Cementing


Example: Problem 1 (Continued)
Previous Problem:
Lead volume [1] : 240.2 cuft Tail volume [2 + 3] :
367.05 cuft
+ 18.2 cuft
385.35 cuft

Use:
Lead Slurry : Class G + 6% D20 at 13.9 ppg
Tail Slurry Neat : Class G at 15.8 ppg

Cement volume Lead:


27 Single Stage Cementing
Example: Problem 1 (Continued)
Previous Problem:
Lead volume [1] : 240.2 cuft Tail volume [2 + 3] : 367.05
cuft
+ 18.2 cuft
385.35 cuft
Use:
Lead Slurry : 6% D20 at 13.9 ppg
Tail Slurry Neat : 15.8 ppg
Cement volume Lead:
240.2 cuft = 145.2 sacks
Cement volume Tail: 1.655 cuft/sack

28 Single Stage Cementing


Example: Problem 1 (Continued)
Previous Problem:
Lead volume [1] : 240.2 cuft Tail volume [2 + 3] : 367.05 cuft
+ 18.2 cuft
385.35 cuft
Use:
Lead Slurry : 6% D20 at 13.9 ppg
Tail Slurry Neat : 15.8 ppg
Cement volume Lead:
240.2 cuft = 145.2 sacks
1.655 cuft/sack
Cement volume Tail:
385.25 cuft = 335.0 sacks
1.15 cuft/sack
29 Single Stage Cementing
Mix Water - Step D
 If you know the number of sacks then you find the
gal/sk of mix water required and multiply
 Mix Fluid = gal/sack x number of sacks

CONVERT TO BBLS

(Your displacement tanks are in bbls)

30 Single Stage Cementing


Mix Water Quality
 In the laboratory, clean location water is used for
cement test. Test results are only obtainable in the
field when same water (= clean) is used.
 Causes for contamination:
– Dirty rig tanks
– Left over chemicals/mud in lines and pumps
– Dirty displacement tanks

31 Single Stage Cementing


Total Water Available
1. Calculated mix water for cement + 20% safety
+
2. Water (ahead, behind, CW, spacer)
+
20 bbls minimum (priming and washing up)
= TOTAL WATER NEEDED

32 Single Stage Cementing


Example: Problem 1 (Continued)
Lead mix water 145sx x 8.56 gal/sx

33 Single Stage Cementing


Example: Problem 1 (Continued)
Lead mix water 145sx x 8.56 gal/sx = 1241.2 gal
= 29.55 bbls
42 gal/bbl

34 Single Stage Cementing


Example: Problem 1 (Continued)
Lead mix water 145sx x 8.56 gal/sx = 1241.2 gal
= 29.55 bbls
42 gal/bbl

Tail mix water 335sx x 4.97 ga/sx

35 Single Stage Cementing


Example: Problem 1 (Continued)
Lead mix water 145sx x 8.56 gal/sx = 1241.2 gal
= 29.55 bbls
42 gal/bbl

Tail mix water 335sx x 4.97 ga/sx = 1664.95 gal


= 39.64 bbls
42 gal/bbl

36 Single Stage Cementing


Example: Problem 1 (Continued)
Lead mix water 145sx x 8.56 gal/sx = 1241.2 gal = 29.55
bbls
42 gal/bbl

Tail mix water 335sx x 4.97 ga/sx = 1664.95 gal = 39.64


bbls
42 gal/bbl

Total mix water 69.19 bbls


37 Single Stage Cementing
Example: Problem 1 (Continued)
Lead mix water 145sx x 8.56 gal/sx = 1241.2 gal =
29.55 bbls
42 gal/bbl
Tail mix water 335sx x 4.97 ga/sx = 1664.95 gal = 39.64
bbls
42 gal/bbl
Total mix water 69.19 bbls
20% safety margin : 66.19 bbl x 20/100 = 13.84 bbls

38 Single Stage Cementing


Example: Problem 1 (Continued)
Lead mix water 145sx x 8.56 gal/sx = 1241.2 gal =
29.55 bbls
42 gal/bbl
Tail mix water 335sx x 4.97 ga/sx = 1664.95 gal = 39.64
bbls
42 gal/bbl
Total mix water 69.19 bbls
20% safety margin : 66.19 bbl x 20/100 = 13.84 bbls
No water ahead, behind, CW, spacer 0 bbls
39 Single Stage Cementing
Example: Problem 1 (Continued)
Lead mix water 145sx x 8.56 gal/sx = 1241.2 gal = 29.55
bbls
42 gal/bbl
Tail mix water 335sx x 4.97 ga/sx = 1664.95 gal = 39.64 bbls
42 gal/bbl
Total mix water 69.19 bbls
20% safety margin : 66.19 bbl x 20/100 = 13.84 bbls
No water ahead, behind, CW, spacer 0 bbls
Priming, washing up 20 bbls

40 Single Stage Cementing


Example: Problem 1 (Continued)
Lead mix water 145sx x 8.56 gal/sx = 1241.2 gal = 29.55 bbls
42 gal/bbl
Tail mix water 335sx x 4.97 ga/sx = 1664.95 gal = 39.64 bbls
42 gal/bbl
Total mix water 69.19 bbls
20% safety margin : 66.19 bbl x 20/100 = 13.84 bbls
No water ahead, behind, CW, spacer 0 bbls
Priming, washing up 20 bbls
Total water needed 103 bbls

41 Single Stage Cementing


Additives - Step E
 Solid Additives
 Calculated as a % by weight of dry cement.
– Except: Salt
– Small amounts will not effect calculation
 Liquid Additives
 Calculated as gallons of additives per sack of bulk
cement
 Subtract total amount of liquid additives from amount of
mix fluid to have real amount of mix water.
42 Single Stage Cementing
Example: Problem 1 (Continued)
Lead 6% Bentonite BWOC (145 sks)
Tail 0.2 gal/sack of Dispersant (335 sks)
Solid Additives
145 sacks x 94 lbs/sack x 6/100 = 817.8 lbs
Liquid Additives
335 sacks x 0.2 gal/sack = 67 gal
Note : Mix water of tail slurry will change
Mix fluid: 335sx x 4.97 gal/sk =1664.95 gal
Mix water = Mix fluid - liquid additives
1664.95 gal - 67 gal = 38.1 bbl
42 gal/bbl

43 Single Stage Cementing


Displacement
 To FLOAT COLLAR unless otherwise stated
Exceptions
1. STAB-IN CEMENTING:
– Displacement to 10-15’ before stab-in shoe
– Check returns - OK - pull out and circulate
2. GUIDE SHOE:
– Displace to 20-30’ before shoe
NEVER OVERDISPLACE
44 Single Stage Cementing
Displacement
 To FLOAT COLLAR unless otherwise stated
Exceptions
1. STAB-IN CEMENTING:
– Displacement to 10-15’ before stab-in shoe
– Check returns - OK - pull out and circulate
2. GUIDE SHOE:
– Displace to 20-30’ before shoe
NEVER OVERDISPLACE
45 Single Stage Cementing
Estimated Job Time - Step G
MIXING TIME
+
DISPLACEMENT TIME
+
10 MINUTES (DROP PLUGS ...)

= ESTIMATION OF JOB TIME

1 HOUR (SAFETY)

= MINIMUM THICKENING TIME


46 Single Stage Cementing
Estimated Job Time - Problem 1 (Continued)
 Mixing time + Displacement time + Plugs mixing time:

Lead 42.8 : 4 bpm 10.5 mins 11mins


Tail 68.6 : 8bpm 8.5 mins 9 mins
Displacement: 4510ft x 0.0361 bbl/ft = 162.8 bbl
: 12 bpm 13.6 mins 14 mins
Dropping Plugs 10 mins
Total 44 mins
 To allow a safe margin to do this job we expect at least 1 hr extra for the
cement to be still pumpable after it is put in place.
ie, 1hrs 44 mins

47 Single Stage Cementing


Examples - Example 1
Calculate : Slurry Volumes, Cement Volumes,
Mix Water, Additives, Displacement
Job Time
Well Data: 9 5/8” 53.5 lb/ft casing, shoe at 9800’,
collar at 9760’, OH 12 1/4” + 25% excess,
previous casing 13 3/8” 68 lb/ft at 2900’
Slurries: Lead: 5 bpm 9300’ - surface
Class “G” @ 12.8 ppg
12% BWOC Bentonite
0.3% BWOC D13
Tail: 3 bpm 9800’ - 9300’
Class “G” Neat @ 15.8 ppg
0.05% BWOC D28
0.5% BWOC D65
Displacement: 8 bpm

48 Single Stage Cementing


Examples - Example 1
Calculate : Slurry Volumes, Cement Volumes,
Mix Water, Additives, Displacement
Job Time
Well Data: 9 5/8” 53.5 lb/ft casing, shoe at 9800’, 13 3/8" , 68 lbs/ft

collar at 9760’, OH 12 1/4” + 25% excess, 1


previous casing 13 3/8” 68 lb/ft at 2900’
Sluuries: Lead: 5 bpm 9300’ - surface
Class “G” @ 12.8 ppg
12% BWOC Bentonite 2900'
0.3% BWOC D13 9 5/8", 53.5 lbs/ft
2
Tail: 3 bpm 9800’ - 9300’ 2
12 1/4" OH
Class “G” Neat @ 15.8 ppg 9300'
0.05% BWOC D28 9760'
3
4 3
0.5% BWOC D65 9800'
Displacement: 8 bpm

49 Single Stage Cementing


Solution - Example 1
 Capacities
– CAS/CAS : 0.3354 cuft/ft
– CAS OH : 0.3132 cuft/ft
– CAS : 0.3973 cuft/ft , 0.0708 bbl/ft
 1. Volumes

50 Single Stage Cementing


Solution - Example 1
 Capacities
– CAS/CAS : 0.3354 cuft/ft
– CAS OH : 0.3132 cuft/ft
– CAS : 0.3973 cuft/ft , 0.0708 bbl/ft
 1. Volumes

Lead Tail
(1) 2900ft x 0.3354 cuft/ft = 972.7 cuft (3) 9800ft - 9300ft x 0.3132 cuft/ft = 156.cuft
(2) 9300ft - 2900ft x 0.3132 = 2004 cuft (4) 40ft x 0.3973 cuft/ft = 15.9 cuft

Excess = 2004 cuft x 0.25 = 501 cuft Excess 156.6 cuft x 0.25 = 39.2 cuft
Total = 3477 cuft Total = 211.7 cuft

51 Single Stage Cementing


Solution - Example 1
• Capacities
CAS/CAS :0.3354 CUFT/FT
CAS OH :0.3132 CUFT/FT
CAS : 0.3973 CUFT/FT, 0.0708 BBL/FT
• 1. Volumes

Lead Tail
(1) 2900ft x 0.3354 cuft/ft = 972.7 cuft (3) 9800ft - 9300ft x 0.3132 cuft/ft = 156.cuft
(2) 9300ft - 2900ft x 0.3132 = 2004 cuft (4) 40ft x 0.3973 cuft/ft = 15.9 cuft

Excess = 2004 cuft x 0.25 = 501 cuft Excess 156.6 cuft x 0.25 = 39.2 cuft
Total = 3477 cuft Total = 211.7 cuft

• 2. Yield
Handbook 700.013 2.165 cuft/sk (lead)
700.006 1.15 cuft/sk (tail)
52 Single Stage Cementing
Solution - Example 1
 3. Cement
Lead : 3477 cuft = 1606 sacks
2.165 cuft/sk
Tail : 211.7 cuft = 184 sacks
1.15 cuft/sk
 4. Mix Fluid
Lead : 1606sk x 12.15 gals/sk = 464.5 bbls
42 gal/bbl
Tail : 184sk x 4.97 gals/sk = 21.8 bbls
42 gal/bbl
53 Single Stage Cementing
Solution - Example 1
 5. Additives
Lead : D20 : 1606sk x 94lbs/sk x 0.12 = 18116
lbs
D13 : 1606sk x 94lbs/sk x 0.003 = 453
lbs
Tail : D28 : 184sk x 94lbs/sk x 0.0005 = 8.6
lbs
D65 : 184sk x 94lbs/sk x 0.005 = 86
lbs
54 Single Stage Cementing
Solution - Example 1
 6. Displacement
9760ft x 0.0708 bbl/ft = 691 bbls

 7. Job Thickening Time


Lead 3477 cuft = 124 min
5.6146 cuft/bbl x 5 bpm
Tail : 211.7 cuft = 13 min
5.6146 cuft/bbl x 3 bpm
Displacement: 691 bbls = 86 min
8 bpm
Drop Plugs = 10 min
Safety = 60 min
298 min
Minimum TT is 4 hrs 53 min

55 Single Stage Cementing


Data :
Example 2
Casing : 9 5/8”, 53.5 lbs/ft, 8600’
7”, 29 lbs/ft, 14300’
Float collar - 14230’
Open hole : 8 1/2”
Section from 10200’ - 10800’ : 9”
Cement : Lead : - Top surface @ 7 bpm
- “G” at 13.5 ppg
- 0.05 gals/sk D109
- 0.1 gals/sk D80
- 8% BWOC - D20
Tail : - 250 sacks @ 5 bpm
- Class “G” @ 15.7 ppg
- 30% BWOC D66
- 0.1 gals/sk D81
- 0.5 gals/sk D603
Calculate : Slurry Volume Cement Volume
Mix water Additives
Displacement @ 7 bpm Job Time

56 Single Stage Cementing


Solution - Example 2
9 5/8" , 53.5 lbs/ft
1

8600'
8.5" OH
2 7", 29 lbs/ft
2 10200'
3 10800' 9" OH
44
3 11507'

5 14230'
6
14300'

57 Single Stage Cementing


 Capacities
Solution - Example 2
– CAS/CAS : 0.1301 cuft/ft CAS OH : 0.1268 cuft/ft
– CAS/OHX : 0.1745 cuft/ft CAS : 0.2086 cuft/ft , 0.0371 bbl/ft
 1. Volumes
Tail : Yield is 1.475 cuft/sk
250 sacks
---> 250 x 1.475 = 368.75 cuft
Volume (5) + (6) = 368.75 cuft
(6) = 70 x 0.2086 = 14.6 cuft
(5) = 368.75 - 14.6 = 354.15 cuft
Height in annulus 354.15 cuft = 2793’
0.1268 cuft/ft
14300 - 2793' = 11, 507'
Lead: Surface - 11, 507'
(1) 8600 x 0.1301 = 1118.86 cuft
(2) (10200 - 8600) x 0.1268 = 202.88 cuft
(3) (10800 - 10200) x 0.1745 = 104.70 cuft
(4) (11507 - 10800) x 0.1268 = 89.64 cuft
Total Lead = 1516.1 cu ft

58 Single Stage Cementing


Solution - Example 2
 2. Cement sacks
Lead : Handbook : 13.5 ppg
Class"G"
8% D20
Yield = 1.825 cuft/Sk
1516.1 cuft = 830.7 = 831 sacks
1.825 cuft/sack
Tail : 250 sacks

 3. Mix fluid
Lead : 831sk x 9.76 gal/sk = 193.1 bbls
42 gal/bbl
Tail : 250 sks x 6.15 gals/sk = 36.6 bbls
42 gal/bbl
59 Single Stage Cementing
 4. Additives
Solution - Example 2
Lead: D20 : 831 sks x 94 x 0.08 = 6249 lbs
D109 : 831 sks x 0.05 gals/sk = 41.5
gals
D80 : 831 sks x 0.1 gals/sk = 83.1
gals
Total fluid = 124.6 gals
Tail: D66 : 250 sks x 94 x 0.3 = 7050 lbs
D81 : 250 sks x 0.1 gals/sk = 25 gals
D603 : 250 sks x 0.5 gals/sk = 125 gals
Total fluid = 150 gals

 5. Mix water
Lead: 193.bbls - 124.6gal = 190.1 bbls
42gal/bbl
Tail: 36.6bbls - 150gal = 33.0 bbls
42gal/bbl
60 Single Stage Cementing
Solution - Example 2
 6. Displacement
– 14230ft' x 0.0371 bbl/ft = 527.9 bbl

 7. Job Thickening Time

Lead : 270 bbls: 7 bpm = 38.5 min


Tail : 65.7 bbls : 5 bpm = 13.1 min
Plugs : = 10 min
Displacement 527.9 bbls : 7 bpm = 75 min
Safety Margin : = 60 min

Min TT is 3 hrs 16 min

61 Single Stage Cementing


Job Pressures
 Example No 1
13 3/8" , 68 lbs/ft
 Tail Slurry at 15.8 ppg 1

– Top of Tail at 9300 Ft


– Lead slurry at 12.8 ppg to
2900'
surface
2 9 5/8", 53.5 lbs/ft
 Displace with 11.5 ppg Mud 2
12 1/4" OH
9300'
 Find differential pressure at 3
9760'
4 3
end of Job 9800'

62 Single Stage Cementing


Hydrostatic Pressure Calcs
Tubing Hydrostatic
 Mud Hydrostatic 13 3/8" , 68 lbs/ft
– Pmud = 11.5 x 9760 x 0.052 1
– Pmud = 5836 psi
Annular Hydrostatic
 Tail Slurry Hydrostatic
– PTail = 15.8 x(9760 - 9300)x 0.052
– PTail = 378 psi 2900'
 Lead Slurry Hydrostatic 9 5/8", 53.5 lbs/ft
2
– PLead= 12.8 x 9300 x 0.052 2
12 1/4" OH
– PLead = 6190 psi 9300'
 Differential pressure 9760'
3
4 3
– PDiff= Annular Hyd. - Tubing Hyd.
9800'
 = (6190 +378) - 5836
– PDiff = 732 psi = Surface pump pressure

63 Single Stage Cementing


Long String Cement Calcs
 Primary Cement Job
– 9 5/8” Csg , 40 lbs/ft
13 3/8" , 77 lbs/ft
– Shoe @ 9980’ - Collar @ 9900’
1 Mud @ 11.3 ppg
– Tail slurry @ 15.8 ppg to 9480’
– Lead slurry @ 12.8 ppg to 2100’ 2100’ Chemical wash @ 8.4 ppg
– 50 Bbls Chemical Wash ahead.
 Previous Casing Lead Slurry @ 12.8 ppg
– 13 3/8“ Csg ,77 lbs/ft 3150'
– Shoe @ 3150’
2 9 5/8", 40 lbs/ft
 12 1/4” OH - Assume 10% Excess. 2
12 1/4" OH
– Find Lead, Tail and Displacement 9480'
Volumes required. 9900'
– Calculate Differential pressure at the 3
4 3 Tail Slurry @ 15.8 ppg
9980'
end of the job (ignore friction).

64 Single Stage Cementing


Long String Cement Calcs - Solution
 Capacities
– Csg/OH Ann = 0.0558 bbls/ft
13 3/8" , 77 lbs/ft
– Csg/Csg Ann = 0.0564 bbls/ft
1 Mud @ 11.3 ppg
– 9 5/8” Csg cap (40 #/ft) = 0.0758 bbls/ft
 Tail volume = Vol of Shoe track
2100’
+ Vol outside csg (with XS) Chemical wash @ 8.4 ppg
= 0.0758 x (9980 - 9900)
+ 0.0558 x (9980 - 9480) x 1.10 Lead Slurry @ 12.8 ppg
= 6.06 + 30.69 = 36.75 = 37 Bbls 3150'
= 206.3 cuft
 Lead volume = Vol in Csg/OH Ann (with XS) 2 9 5/8", 40 lbs/ft
+ Vol in Csg/Csg Ann 2
12 1/4" OH
= 0.0558 x (9480 - 3150) x 1.10 9480'
+ 0.0564 x (3150 - 2100) 9900'
= 388.53 + 59.22 = 447.75 3
4 3 Tail Slurry @ 15.8 ppg
9980'
= 448 Bbls
= 2514.04 cuft

65 Single Stage Cementing


Long String Cement Calcs - Solution
 Capacities
– Csg/OH Ann = 0.0558 bbls/ft
– Csg/Csg Ann = 0.0564 bbls/ft 13 3/8" , 77 lbs/ft
– 9 5/8” Csg cap (40 #/ft) = 0.0758 1 Mud @ 11.3 ppg
bbls/ft
 Displacement volume = Csg Vol to 2100’ Chemical wash @ 8.4 ppg
float
collar Lead Slurry @ 12.8 ppg
= 0.0758 x 9900 3150'
= 750 Bbls
2 9 5/8", 40 lbs/ft
 Differential pressure at end of Job : 2
= Hydrostatic of Lead and tail cement 12 1/4" OH
9480'
columns + Hydrostatic of wash +
9900'
Hydrostatic of remaining mud in 3
4 3 Tail Slurry @ 15.8 ppg
annulus LESS Hydrostatic of 9980'
displacing fluid + Hydrostatic of Tail
cement in shoe joint
66 Single Stage Cementing
Long String Cement Calcs - Solution
 Capacities
– Csg/OH Ann = 0.0558 bbls/ft
13 3/8" , 77 lbs/ft
– Csg/Csg Ann = 0.0564 bbls/ft Mud @ 11.3 ppg
– 9 5/8” Csg cap (40 #/ft) = 0.0758 1
bbls/ft 2100’ Chemical wash @ 8.4 ppg
 Height of Chemical wash in Csg/Csg
Ann
Lead Slurry @ 12.8 ppg
= 50 / 0.0564
= 886 ft 3150'

Height of Tail = 9980 - 9480 = 500 ft 9 5/8", 40 lbs/ft


2
Height of Lead = 9480 - 2100 = 7380 2
ft 12 1/4" OH
9480'
Height of Chem Wash = 886 ft 9900'
 Remainder is Mud behind casing 3
4 3 Tail Slurry @ 15.8 ppg
= 9900 - (420 + 7380 + 886) 9980'

= 1214 ft

67 Single Stage Cementing


Long String Cement Calcs - Solution
 Annulus hydrostatic is total of Cement
slurries + Chem Wash + Mud :
= 15.8 x 500 x 0.052 ( =Tail slurry) 13 3/8" , 77 lbs/ft
+ 12.8 x 7380 x 0.052 ( = Lead slurry) 1 Mud @ 11.3 ppg
+ 8.4 x 886 x 0.052 (= Chem Wash)
+ 11.3 x 1214 x 0.052 ( Mud in Ann) 2100’ Chemical wash @ 8.4 ppg
= 410 + 4912 + 387 + 713
= 6423 psi
Lead Slurry @ 12.8 ppg
 Hydrostatic inside casing :
= 11.3 x 9900 x 0.052 (=Mud, disp.) 3150'
+ 15.8 x 80 x 0.052 (=Tail slurry)
2 9 5/8", 40 lbs/ft
= 5817 + 65.7 = 5883 psi
2
 Differential pressure at float collar : 12 1/4" OH
= psi outside csg - psi inside csg 9480'
= 6423 - 5883 9900'
= 540 psi
3
4 3 Tail Slurry @ 15.8 ppg
9980'

68 Single Stage Cementing