Organisational structure of the Kraftanlagen Group

Energy and power plant Utility services Industrial plants Decentralised power Nuclear technology Fabrication
technology generation

Speaker Company presentation 27.05.2024 1


Fabrication
Finow Rohrsysteme GmbH
History

Finow Rohrsysteme GmbH 3


BU Fabrication
Finow Plant 1900

Finow Rohrsysteme GmbH 4


BU Fabrication
General Information

Key figures
FINOW factory near Berlin Total area 125.000 m²
Manufacturing area 20.000 m²
Employees 80
Capacity/year 3.600 t
Max. annual workload 220.000 h

Finow Rohrsysteme GmbH 5


BU Fabrication
General Information

Finow is producing piping systems and components for power plants,


the oil & gas industry, offshore wind farms, pipelines and the
construction industry at our own production facilities in Eberswalde.

Our services include :

 Inductive bending
 Heat treatment
 Mechanical treatment
 Plasma cutting
 Welding
 Sand blasting
 Corrosion protection
 Quality assurance
(destructive/non destructiv)

Finow Rohrsysteme GmbH 6


BU Fabrication
Customer

Finow Rohrsysteme GmbH 7


Reference Project
Construction - Al Wasl Plaza, World Expo 2020 Dubai

Customer:
Cimolai S.p.a.
General contractor:

Cimolai Rimond Middle East


Contracting LLC
Scope:
The Trellis is a long-span shell structure
that extends across the 130 m of the
central plaza area and rises to a height
of 67 m. Finow Scope includes
inductive bending, heat treatment and
cutting of pipes.
Project data:

Pipe Size (mm) 508 x 10/20 Execution period


Material S 460 September – December 2018

Finow Rohrsysteme GmbH 8


Reference Project
Construction - Al Wasl Plaza, World Expo 2020 Dubai

Customer:
Cimolai S.p.a.
General contractor:

Cimolai Rimond Middle East


Contracting LLC

https://www.youtube.com/watch?v=H8bc0zikzcw

Finow Rohrsysteme GmbH 9


Reference Project
Construction - Al Wasl Plaza , World Expo 2020 Dubai

Customer:
Cimolai S.p.a.
General contractor:

Cimolai Rimond Middle East


Contracting LLC

Finow Rohrsysteme GmbH 10


Reference Project
Borkum Riffgrund 2 – Offshore Wind Park

Customer:
ST³ Offshore sp.zo.o.
General contractor:

Dong Energy (Orsted)


Scope of service:
Manufacturing of J-Pipes and grout
systems

Project data:

Pipe Size (mm) 406 x 10 Execution period


Material S 355 January – October 2017

Finow Rohrsysteme GmbH 11


Reference Projects
Renewables – Race Bank, Burbo Bank, Valje Mate, Walney

Customer:
Iemants b.v.
General contractor:

Smulders Group
Scope of service:
Manufacturing of J-Pipes

Project data:

Pipe Size (mm) DN 350–DN 750 Execution period


Material S 355 2015 - 2017

Finow Rohrsysteme GmbH 20.02.2019 12


Reference Project
Oil & Gas – Exhaust gas cooler in a silicon factory (NOR)

Customer:
Wacker Chemicals Norway AS
General contractor:

EPC Kraftanlagen Munich


Scope of service:
Project Management, Engineering,
Procurement, Prefabrication, Erection,
Tie-in and system check out

Project data:

Piping + Steel 600 t Execution period


Material 10CrMo, X15 April 2018 – May 2019

Jens Buchberger 13
Reference Project
Oil & Gas – Exhaust gas cooler in a silicon factory (NOR)

Customer:
Wacker Chemicals Norway AS
General contractor:

EPC Kraftanlagen Munich


Scope of service:
Project Management, Engineering,
Procurement, Prefabrication, Erection,
Tie-in and system check out

Jens Buchberger 14
Reference Project
Oil & Gas – Replacing of pipe bundle NH³ process unit

Customer:
SKW Piesteritz
General contractor:

Kraftanlagen München
Scope of service:
Procurement, Prefabrication, Erection

Project data:

Pipe + Steel frame 180 T Execution period


Material 10CrMo June 2018 – July 2019

Finow Rohrsysteme GmbH 15


Reference Project
Louisiana – NH³ Heat Waste Recovery

Customer:
Steinmüller Engineering
General contractor:

CF Industries Nitrogen llc


Scope of service:
Heat exchanger

Project data:

Pipe Size (mm) DN 40 Execution period


Material 13CrMo January 2018 – September 2018

Finow Rohrsysteme GmbH 16


Reference Project
Ptolemais V – Power Plant

Customer:
Mitsubishi Hitachi Power System
General contractor:

Terna
Scope of service:
High pressure + low pressure piping
system turbine island

Project data:

Pipe Size (mm) diverse Execution period


Material P91, 10CrMo October 2016 – June 2018

Finow Rohrsysteme GmbH 17


Reference Project
North Stream I

Customer:
Thyssen Krupp Uhde
Scope of service:
Manufacturing of 2 Heating Modules to
fill the Baltic Sea pipeline with
preheated gas

Project data:

Weight (t) 180


Piping (mm) up to DN 400
Finow Rohrsysteme GmbH 18
BU Fabrication
Fabrication facilities

Inductive bending machines


IBM 360 max. Ø: 440 mm
max. wall thickness: 70 mm
IBM 1200 max. Ø: 1.220 mm
max. wall thickness: 120 mm
Finow Rohrsysteme GmbH 19
BU Fabrication
Fabrication facilities

Cold bending machines


2 machines min. Ø: 20 mm
max. Ø: 150 mm

Finow Rohrsysteme GmbH 20


BU Fabrication
Fabrication facilities

Heat treatment
Furnace I L x Bx H = 9.100 x 5.100 x 2.000
max weight: 16 t
Furnace II L x Bx H = 11.800 x 6.500 x 2.300
max weight: 40 t
Finow Rohrsysteme GmbH 21
BU Fabrication
Fabrication facilities

Plasma cutting
2 CNC machines Pipe cutting, incl. welding edge
Plate cutting

Finow Rohrsysteme GmbH 22


BU Fabrication
Fabrication facilities

Spool Measurement
• Free-based 3D coordinate measuring of the spool geometry
and bending angles
• Computerized measuring and documentation
• Measuring precision: Geometry 0,1 mm, Bending angle 0,1°

Finow Rohrsysteme GmbH 23


BU Fabrication
Fabrication facilities

Mechanical treatment
2 Boring Mills Welding edge preparation
Boring of nozzles

Finow Rohrsysteme GmbH 24


BU Fabrication
Fabrication facilities

Welding
WIG, MIG, MAG, E-Hand, Submerged arc welding

Jens Buchberger 11.10.2018 25


BU Fabrication
Fabrication facilities

Sand blasting Corrosion protection


2 Cabins Spray- and roll equipment

Finow Rohrsysteme GmbH 26


BU Fabrication
Quality assurance

Inhouse Quality Assurance

Non destructive material testing Radiography by X-ray tube, isotop (RT)


Ultrasonic testing (UT)
Magnetic particle flaw test (MT)
Penetration test (PT)
Leak test (LT)
Visual test (VT)
Endoskopic examination
Material testing labratory Hardness test
Tesile and impact test
Face bend test
Metallography
Spectral analysis

Finow Rohrsysteme GmbH 27


BU Fabrication
Qualifications

Cerifications

ISO 9001 (Quality)


SCC (Occupational safety)
ISO 50001 (Environmental protection)
DIN EN ISO 3834 – 2
DGRL 97/23/EG appendix III, module H/H1
ASME U-Stamp
ASME S-Stamp
ASME PP-Stamp
EN 1090-1/-2 (Steel)

Finow Rohrsysteme GmbH 28


BU Fabrication
Contact

For questions and enquiries please contact:

Finow Rohrsysteme GmbH


Angermünder Strasse 101
16225 Eberswalde
Germany

Jens Buchberger (MD)

Tel: +49 3334 57 120


Mobile: +49 1520 3635639
Mail: jens.buchberger@finow.de
Web: www.finow.de

Finow Rohrsysteme GmbH 29