Wa0033

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 12

Reduction of costs decreasing

Diego Ruiz Dedios Waiting time


(Mining Engineer)

U.E.A. Tambomayo March, 2018.


MISSION AND VISSION

- Mission
Increase production , decreasing costs of the áreas mine belong

- Vission
For 2018 have a EBIT (Earnings before interest and taxes) 21,987 USD
Objectives

-Decrease the waiting time in the dump truck


-Find the route critical of the dump truck

-Increase production of ore

-Decrease the production cost of ore


Using CPM (Critical Path Method)
0 5.0 5.0 17.3 17.3 18.8 18.8 40.0 40.0 66.5
5.2 17.3 17.3 18.8 18.8 39.7 41.7 66.5 66.5 82.9
82.9
D.M.E.
82.9
0 0 Ramp. 100 (-) 12.2 Level. 4540 1.5 Loading pocket 21.1 Mine entrance
Ramp. 970 (+) 24.8
Level 4740 82.9
Level 4540
0 0
5.0
B C D E F 16.4

Mine entrance
Level 4740 13.0 20.9 26.8 G
A 4.3

RP 970 (-)
RP 100 (+)
H I
0 4.3 18.8 39.7
4.3 17.3 39.7 66.5
The route where backlash is cero, this is the critical route

Route Backlash Result


A 0- 0 0
B 5.2 - 5 0.2
C 17.3 - 17.3 0
D 18.8 - 18.8 0
E 41.7 - 40 1.7
F 66.5 - 66.5 0
G 82.9 - 82.9 0
H 4.3 - 4.3 0
I 39.7 - 39.7 0

Therefore the Critical route : A-H-C-D-I-F-G = 82.9 min


Should to make scaling in the ramp 970
Data taked in the mine

cycle Route Time cycle (minutes) Time cycle ( hours)


C1 Loading pocket level 4540 - DME 88.6 1.48
C2 Loading pocket level 4540 - DME 95.4 1.59
C3 Loading pocket level 4540 - DME 85.2 1.42
C4 Loading pocket level 4540 - DME 87.4 1.46
Cycle average Loading pocket level 4540 - DME 89.1 1.5

The route of the first dump truck is the most important because this is causes waiting time in the other trunks

T. using CPM T. not using CPM T. savings


82.9 min 89.1 min 6.2 min

We could imagine the wait time of second dump trunk is iqual the time of load what make
the scoop – dump truck , where the time is 4 min but This time could be cero since the
dump truck could be in the ramp 970 (-) with direction the level 4540
Simulate the time of route of the first dump truck

Routes Time
Time stars - Mine entrance level 4740 07:00:00
Arrive the Ramp 970 (-) 07:04:18
Arrive the level 4540 07:17:35
Arrive loading pocket level 4540 07:18:30
Arrive ramp 100 level 4740 07:39:24
Arrive mine Nv. 4740 08:06:12
Arrive DME 08:22:36

Currenly the mine take out one dump truck of waste rock and one dump truck of ore from 7:00 am
to 12:00 pm
Cycle
C1
C1
C1
Routes
Time stars - Mine entrance level 4740
Arrive the Ramp 970 (-)
Arrive the level 4540
Time (seg)
0
258
780
Time (min)
0
4.3
13
Time
07:00:00
07:04:18
07:17:35
Situation #1
C1 Arrive loading pocket level 4540 90 1.5 07:18:30
C1 Arrive ramp 100 level 4740 1254 20.9 07:39:24
C1 Arrive mine Nv. 4740 1608 26.8 08:06:12
C1 Arrive DME 984 16.4 08:22:36
C1 DME - Mine entrance level 4740 869.30 14.49 08:37:06
C2 Mine entrance level 4740- level 4540 480.00 8.00 08:45:06
C2 level 4540 - loading pocket 71.40 1.19 08:46:17
C2 Dynamic positioning 197.50 3.29 08:49:35
C2 waitIing time 36.90 0.62 08:50:11
C2 Dynamic positioning 29.10 0.49 08:50:41
C2 Load 67.50 1.13 08:51:47
C2 Loading pocket level 4540 -Ramp 100 Level 4540 121.50 2.03 08:53:49
C2 By Pass 200 89.10 1.49 08:55:19
C2 Level 4640 - Level 4740 220.10 3.67 08:58:59
C2 Ramp 100 level 4740 - Mine entrance level 4740 495.70 8.26 09:07:16
C2 Mine entrance level 4740 - DME 1005.40 16.76 09:24:02
C2 Bottom dump 116.80 1.95 09:26:02
C2 DME - Mine entrance level 4840 96.40 1.61 09:27:38
C3 Mine entrance level 4840 - Ramp 100 360.10 6.00 09:33:38
C3 Level 4840 - Level 4740 460 7.67 09:41:18
C3 Level 4840 - Secondary entry134 176.5 2.94 09:44:15
C3 Dynamic positioning 84.6 1.41 09:45:39
C3 Load 386.5 6.44 09:52:06
C3 Secondary entry 134 - Ramp 100 level 4740 248.9 4.15 09:56:15
C3 Ramp 100 Level 4740 - Mine entrance level 4740 341.1 5.69 10:01:57
C3 Mine entrance level 4740 - CM 1028.2 17.14 10:18:05
C3 Dynamic positioning 27.7 0.46 10:18:32
C3 Bottom dump 41.5 0.69 10:19:13
C3 CM AL Mine entrance level 4840 215.9 3.60 10:22:49
C4 Mine entrance level 4840 - Ramp 4840 294 4.90 10:27:43
C4 Level 4840 - Ramp 100 309.7 5.16 10:32:53
C4 Level 4840 - secondary entry 134 176.5 2.94 10:34:49
C4 Dynamic positioning 84.6 1.41 10:36:14
C4 Load 386.5 6.44 10:42:40
C4 secondary entry 134 - Ramp 100 Level 4740 248.9 4.15 10:46:49
C4 Ramp 100 level 4740 - Mine entrance level 4740 341.1 5.69 10:52:31
C4 Mine entrance level 4740 - CM 1028.2 17.14 11:09:40
Cycle
C1
C1
C1 MISSION AND VISSION
Routes
Time stars - Mine entrance level 4740
Arrive the Ramp 970 (-)
Arrive the level 4540
Time (seg)
0
258
780
Time (min)
0
4.3
13
Time
07:00:00
07:04:18
07:17:35
Situation #2
C1 Arrive loading pocket level 4540 90 1.5 07:18:30
C1 Arrive ramp 100 level 4740 1254 20.9 07:39:24
C1 Arrive mine Nv. 4740 1608 26.8 08:06:12
C1 Arrive DME 984 16.4 08:22:36
C1 DME - Mine entrance level 4840 96.40 1.61 08:23:12
C2 Mine entrance level 4840 - Ramp 100 level 4840 360.10 6.00 08:29:12
C2 Level 4840 - level 4740 460 7.67 08:36:52
C2 Level 4840 - secondary entry 134 176.5 2.94 08:39:49
C2 Dynamic positioning 84.6 1.41 08:41:13
C2 Load 386.5 6.44 08:47:40
C2 secondary entry 134 - Ramp 100 level 4740 248.9 4.15 08:51:49
C2 Level 4740 - Mine entrance 4740 341.1 5.69 08:56:31
C2 Mine entrance level 4740 - CM 1028.2 17.14 09:13:40
C2 Dynamic positioning 27.7 0.46 09:14:08
C2 Bottom dump 41.5 0.69 09:14:50
C2 CM - Mine entrance level 4840 215.9 3.60 09:18:26
C3 BM840 AL 8 294 4.90 09:23:20
C3 Level 4840 - Level 4740 309.7 5.16 09:28:30
C3 Level 4840 - Secondary entry134 176.5 2.94 09:31:27
C3 Dynamic positioning 84.6 1.41 09:32:52
C3 Load 386.5 6.44 09:39:19
C3 Secondary entry 134 - Ramp 100 level 4740 248.9 4.15 09:43:28
C3 Ramp 100 Level 4740 - Mine entrance level 4740 341.1 5.69 09:49:10
C3 Mine entrance level 4740 - CM 1012.2 16.87 10:06:02
C3 Bottom dump 42 0.70 10:06:44
C3 CM - Mine entrance 4840 210 3.50 10:10:14
C4 BM840 AL 8 290 4.83 10:15:04
C4 Level 4840 - level 4740 455 7.58 10:23:04
C4 Level 4840 - secondary entry 134 175 2.92 10:26:04
C4 Dynamic positioning 82 1.37 10:27:26
C4 Load 380.2 6.34 10:33:47
C4 secondary entry 134 - Ramp 100 level 4740 240 4.00 10:37:47
C4 Ramp 100 level 4740 - Mine entrance 4740 335 5.58 10:43:23
C4 Mine entrance level 4740 - CM 1020.2 17.00 11:03:23
Analysis of first case.

Currenly the mine produces 1500 tons of ore / day, where capacity of dump truck is 25 tons

It´s only considery 6 dump truck in operation mine

In the first case, 6 dump truck of ore more was achieved take out

6 dump truck

ton 650 tons

ton of ore / day 1500 1650 110%


$/t 1.50 1.36 91%

The production cost is reduces from 1.50 $/t to 1.36 $/t


Analysis of second case

In the second case, 12 dump truck of ore more was achieved take out
12 dump truck of ore

300 tons 800 tons

ton of ore / day 1500 1800 120%


$/t 1.50 1.25 83%

The production cost is reduces from 1.50 $/t to 1.25 $/t


Recommendations

- It´s recommend cut blackboard in the main heading indicating how many dump truck are waiting
time, if there are two dump truck more in waiting time, the operator must report on the radio, go
to another heading.

- The supervisor must report which are the routs to need maintenance of
roads

-Supervise the scoop because the scoop arrives at 8:20 am, causing waiting time in the dump truck
in the loading pocke 13 y 14.

You might also like