Compressed Air System
Compressed Air System
• Intake losses
• Control system
• Dry air
• Misuse of air
• maintenance
The current
The current for
for the
the 33 phases
phases
measurements
measurements
Loaded(amps) Unloaded(amps)
50 10 60
51 8 59
51 9 60
50 11 61
The time for load-unload cycles
outside production hours
25 20 45
26 22 48
25 21 46
27 20 47
Solution
• Estimate compressor load (kW) :
• Average power
= ( power loaded x % loaded time ) + (
power unload x % unloaded time)
= (149.6 x 0.55) + (76.5 x (1 – 0.55
= 116.7 kW
Estimate energy and cost due to
leaks
• Power due to air leaks
= power during leak test - Measured
power at unloaded condition
= 116.7kW – 76.5kW = 40.2 kW
• Estimate cost of leaks
= power due to leaks x annual operating
hours x cost of energy
= 40.2 kW x 6000 hours/year x 25 sen/kWh
= RM60,3000/year
Estimate cost saving from a leak
reduction program