Section 5:
Identifying SIF
• How can I identify safety functions?
• Process Hazard Analysis (PHA)
• Getting LOPA data from PHA reports
• Identifying safety functions from engineering
drawings
1
CFSE Exam Preparation: Section I-5
2
CFSE Exam Preparation: Section I-5
3
CFSE Exam Preparation: Section I-5
4
CFSE Exam Preparation: Section I-5
SIF Description
• Find all of the existing and recommended SIF
• Recommended SIF found in
Recommendations Column, Existing SIF
found in Safeguards Column
Existing Safeguard Recommended Safeguard
Dev Causes Consequences Safeguards Recommendations
Column Steam Reboiler Column Overpressure Pressure relief valve, Install SIS to stop
Pressure Control fails, and potential mechanical operator intervention to reboiler steam flow upon
causing excessive heat input. failure of the vessel and high pressure alarms, high column pressure
release of its contents. Mechanical design
Low flow through pump Pump seal fails and Low Outlet flow pump Existing safeguards
causes pump failure and releases flammable Shutdown SIS. Adequate
subsequent seal failure material
5
CFSE Exam Preparation: Section I-5
6
CFSE Exam Preparation: Section I-5
Initiating Events
• In HAZOP, Initiating events in causes column
• What-If and Checklist questions
• Potential for multiple initiating events per
hazard Both Initiating Events cause the same consequence
Dev Causes Consequences Safeguards Recommendations
1.0 - More Pressure
Column Steam Reboiler Column Overpressure Pressure relief valve, Install SIS to stop
Pressure Control fails, and potential mechanical operator intervention to reboiler steam flow upon
causing excessive heat input. failure of the vessel and high pressure alarms, high column pressure
release of its contents. Mechanical design of
vessel.
Steam reboiler tube leak Column Overpressure Pressure relief valve, See previous item
causes high pressure steam and potential mechanical operator intervention to
to enter vessel failure of the vessel and high pressure alarms.
release of its contents.
7
CFSE Exam Preparation: Section I-5
Safeguards
• Find both non-SIS and SIS Safeguards, other
than SIS under study
• Safeguards apply to initiating events, multiple
safeguards per initiating event may exist
Dev Causes Consequences Safeguards Recommendations
1.0 - More Pressure
Column Steam Reboiler Column Overpressure Pressure relief valve, Install SIS to stop
Pressure Control fails, and potential mechanical operator intervention to reboiler steam flow upon
causing excessive heat input. failure of the vessel and high pressure alarms, high column pressure
release of its contents. Mechanical design of
vessel.
Steam reboiler tube leak Column Overpressure Pressure relief valve, See previous item
causes high pressure steam and potential mechanical operator intervention to
to enter vessel failure of the vessel and high pressure alarms.
release of its contents.
8
CFSE Exam Preparation: Section I-5
9
CFSE Exam Preparation: Section I-5
Summary:
Identifying SIF
• How can I identify safety functions?
• Process Hazard Analysis (PHA)
• Getting LOPA data from PHA reports
• Identifying safety functions from engineering
drawings