II.

DETAIL DESCRIPTION OF COMPONENTS STRUCTURE AND IDEAS

3 . Folding method
Step 1: to the place where the tape was applied

Step 2: arrive fold envelopes

Step 3: structure fold envelopes


1
II. DETAIL DESCRIPTION OF COMPONENTS STRUCTURE AND IDEAS

4 . envelope sealing machine structure

2
II. DETAIL DESCRIPTION OF COMPONENTS STRUCTURE AND IDEAS

4 . envelope sealing machine structure

double-sided adhesive tape

the path of the


adhesive tape

the mechanism moving in the direction


of the arrow will stick the adhesive tape
3
II. DETAIL DESCRIPTION OF COMPONENTS STRUCTURE AND IDEAS

4 . envelope sealing machine structure

adhesive tape collector

4
IV. TIMING CHART
STT Operation steps Time ( seconds )
first Paste and cut 5
double-sided
adhesive tape
2 Fold wind envelope 3
packaging
3 Get the finished 2
product
TOTAL 10( seconds )

5
V. PROJECT SCHEDULE

Month 8 Month 9 Month 10


No Job Week Week Week Week Week Week Week Week Week Week Week Week
1 2 3 4 1 2 3 4 1 2 3 4

Implementation
I plan.

Finalize detailed
1 drawings.

2 Prepare materials.

Start conducting
3 the actual test.
Plan to complete
II product.
Fabrication of
1 main parts.
Assemble the
2 parts together.
Complete test all
3 the steps required
by the topic.
Correction and
4 upgrades (if have).
6