Agenda

 Reference Input Documents

 Background

 Requirement Summary

 Technical Specifications

 Scope of Work

 Out of Scope, Assumptions & Dependencies

 Technical Approach

 Proposed Execution Approach

 Proposed Team Structure

 Program Deliverables

 Our Governance Model


Reference Input Documents
 GV642 OM Added Value FI

 GV642 Added Value SCH

 806318 Test specification IABO_A5 Redesign_GVx42_V13

 GV642AB1_FI_technical documents

 Questions list
Background
Requirement Summary
 Optimization of cost for current product
 No functional changes

 No change in Software

 Change in HW with in Software partially

 Change in overall HW and SW for huge savings


Scope of work
 Optimization of cost for current product  Certification of the product
 HW Changes  Compliance
 Component Selection, PCB Design, Board bring up,

 V&V
 Identify or design test equipment
 SW Changes  Fixtures
 Architecture finalization
 Test instruments
 Module development, Integration and test

 HW & SW integration and test


 Proto built
 Validation as per OEM standards  3 versions ( 1 Alpha, 2 Beta)
 Functional Validation  PCB Fab
 Electrical Validation  BoM & PCB Assembly
 Mechanical integration
 Each version 20 boards
Out of Scope
 Not specified in signed requirement

 Additional work treated as new requirement


Assumptions
 Considered 250K volume for BoM calculation

 Information from other sub-system will be available

 Cost of all fixtures for proto build

 Flashing tools

 Validation support from OEM for beta 2/3 testing


Dependencies

SR Dependencies Priority Timeline


1 Sub system information High Start
2 Production location High Start
3 Vendor selection High Start
4 Current Product ,Specification & Design High Start
5 Physical Samples High Start
6 Current test instruments Medium Mid development cycle
Execution Approach

Approach 1

Start
Input Analysis Approach 1 Finalize
Development

Approach 1

0W 3W 9W 15W 18W
Team Structure