Battery Charging

Facility
Electrum
PT Adyawinsa Telecommunication & Electrical
Jl. Pegangsaan Dua Km.2 No.64
Kelapa Gading, Jakarta Utara
Indonesia 14250
Daftar Isi

• Struktur Organisasi
• Simulasi Tim
• Work Breakdown Structure (WBS)
• Time Line (1 site)
Struktur
Organisasi
Proyek
DIV. CONSTRUCTION BUSINESS

PT Adyawinsa Telecommunication & Electrical


Jl. Pegangsaan Dua Km.2 No.64
Kelapa Gading, Jakarta Utara
Indonesia 14250
Struktur Organisasi Proyek PT. ADYAWINSA TELECOMMUNICATION & ELECTRICAL
ORGANIZATION PROJECT
BATTERY CHARGING FACILITY

Project Manager

Robinson Simanjuntak

Engineering CME K3
Reskhi Andry Harahap

Taufiq Nur

Agus Hariyanto Administrator


Diva
Eka

Logistik

Spv CME 1 Technician Team Victor Eky

Andiyas 4 Tim Arif Wibowo


Suparto
Coordinator 1

Priyadi Spv CME 2 Technician Team

Komar 4 Tim
Erick

Coordinator 2 Spv Survey & Power Connection


Survey & PLN PLN Team
Edgard Ferry Andrea 5 Tim
Suprawoto
Simulasi
Tim
Simulasi
Survey 100 titik

DIV. CONSTRUCTION
BUSINESS

PT Adyawinsa Telecommunication & Electrical


Jl. Pegangsaan Dua Km.2 No.64
Kelapa Gading, Jakarta Utara
Indonesia 14250
Implementasi CME Implementasi CME
SPV CME 1 SPV CME 2
Teknisi Sipil 1 Teknisi Sipil 1
Teknisi ME 1 Teknisi ME 1
Tim 1 Tim 1
Helper 1 Helper 1
Helper 2 Helper 2
Teknisi Sipil 1 Teknisi Sipil 1
Teknisi ME 1 Teknisi ME 1
Tim 2 Tim 2
Helper 1 Helper 1
Helper 2 Helper 2
Teknisi Sipil 1 Teknisi Sipil 1
Teknisi ME 1 Teknisi ME 1

Simulasi Tim 3
Helper 1
Helper 2
Tim 3
Helper 1
Helper 2

Tim
Teknisi Sipil 1 Teknisi Sipil 1
Teknisi ME 1 Teknisi ME 1
Tim 4 Tim 4
Helper 1 Helper 1
Helper 2 Helper 2

Survey & PLN Connection


SPV SURVEY
Tim Survey & PLN Connection 1
Tim 1
Tim Survey & PLN Connection 2
Tim Survey & PLN Connection 1
Tim 2
Tim Survey & PLN Connection 2
Tim Survey & PLN Connection 1
Tim 3
Tim Survey & PLN Connection 2
Tim Survey & PLN Connection 1
Tim 4
Tim Survey & PLN Connection 2
Tim Survey & PLN Connection 1
Tim 5
Tim Survey & PLN Connection 2
Total/
1 2 3 4 5 6 7 8 9 10
Tim Aktivitas Hari ke-
80 12 12 12 12 12 12 8
Survey titik koordinat 20 3 3 3 3 3 3 2
Pengukuran space
Sketsa layout
Tim 1 Dokumentasi hasil survey/TSSR
Pendataan Qty Survey (BoQ Survey)
Perbandingan As Plan BoQ vs BoQ Survey
Aproval TSSR & layout
Survey titik koordinat 20 3 3 3 3 3 3 2
Pengukuran space
Sketsa layout
Tim 2 Dokumentasi hasil survey/TSSR
Pendataan Qty Survey (BoQ Survey)
Perbandingan As Plan BoQ vs BoQ Survey
Aproval TSSR & layout

Simulasi Survey Survey titik koordinat


Pengukuran space
20 3 3 3 3 3 3 2

Sketsa layout
100 titik Tim 3 Dokumentasi hasil survey/TSSR
Pendataan Qty Survey (BoQ Survey)
Perbandingan As Plan BoQ vs BoQ Survey
Aproval TSSR & layout
Survey titik koordinat 20 3 3 3 3 3 3 2
Pengukuran space
Sketsa layout
Tim 4 Dokumentasi hasil survey/TSSR
Pendataan Qty Survey (BoQ Survey)
Perbandingan As Plan BoQ vs BoQ Survey
Aproval TSSR & layout
Survey titik koordinat 20 3 3 3 3 3 3 2
Pengukuran space
Sketsa layout
Tim 5 Dokumentasi hasil survey/TSSR
Pendataan Qty Survey (BoQ Survey)
Perbandingan As Plan BoQ vs BoQ Survey
Aproval TSSR & layout
Time Line (1
titik)
Div. Construction Business

PT Adyawinsa Telecommunication & Electrical


Jl. Pegangsaan Dua Km.2 No.64
Kelapa Gading, Jakarta Utara
Indonesia 14250
Time Line
TIMELINE
No Deskripsi BULAN 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Site Survey
Survey titik koordinat
Pengukuran space
Sketsa layout
Dokumentasi hasil survey/TSSR
Aproval TSSR & layout
2 Pekerjaan Sipil
a Persiapan
Site clearing
Mobilisasi
Dokumentasi
Perlengkapan K3, JSA dan TBM
b Raft Beton
Angkur Beton
Bekisting
Beton K-175
c Kanopi
Rangka Tiang Kanopi Hollow Steel 20x20mm
Rangka Atap Kanopi Hollow Steel 20x20mm
Pelindung Samping Clear Solarflat Polycarbonate 3mm
Penutup Atap Kanopi Clear Solarflat Polycarbonate 3mm
3 Architecture
a Area Parkir
Cat Besi
b Papan Nama
Akrilik Papan Nama

Survey CME PLN


Rangka Papan Nama Hollow Steel
c Finishing
Cat Dasar Rangka Tiang Kanopi Hollow Steel
Cat Finish Rangka Tiang Kanopi Hollow Steel
Cat Dasar Rangka Atap Kanopi Hollow Steel
Cat Finish Rangka Atap Kanopi Hollow Steel
Cat Mouwilex

1 hari 12 hari
4 ME
a Panel KWH
KWH Meter
Instalasi
b Instalasi Kabel Power
c Instalasi Grounding
Bak Kontrol
d Penerangan Lampu
e APAR Portable
5

6
Pemasangan BBS
MOS BSS
Instalasi
Pasang Baru PLN
61 hari
Proses SLO
Daftar
Waiting Schedule survey
Survey
Submit SLO + NIDI
SPJBTL
BPUJL
waiting Schedule Konek PLN
PLN Konek
Collect Dokument
7 Test & Commisioning
WBS
Work Breakdowns Structure