Professional Documents
Culture Documents
By Dhakal
By Dhakal
By Dhakal
SCHOOL OF ENGINEERING
DEPARTMENT OF CIVIL ENGINEERING
Introduction
Objectives and limitations of the Project
Methodology
Work Progress
Work Remaining
Work Schedule
References
Limitation
• Actual field measurements of discharge by current meter are not possible so
hydrological study would be based on data provided by host company.
• Only hydrological study and hydraulic analysis will be carried out.
Intake
Powerhouse
Catchment Area Ratio Method (CAR)
Catchment Area of Intake = 866.087
Catchment Area from Damauli Station = 1350
Catchment area of Phulbari station = 582
Discharge of Intake =
Generalized Extreme Value Distribution
Generalized Extreme Value Distribution
1600
Flood Qt
10 882.0385 1400
50 1137.619
100 1234.675 1200
200 1325.456
Discharge (Q)
1000 1514.995
800
600
400
200
0
-2 -1 0 1 2 3 4 5 6 7 8
F(x)
Goodness of Fit: Gandaki
Goodness of Fit: Phoolbari
Goodness of Fit
Goodness of Fit – Summary (Gandaki)
Kolmogorov Smirnov Anderson Darling
# Distribution # Distribution
Rank Rank
1 Gen. Extreme Value 1 1 Gen. Extreme Value 1
2 Gumbel Max 3 2 Gumbel Max 4
3 Log-Pearson 3 2 3 Log-Pearson 3 2
4 Lognormal 4 4 Lognormal 3
200
150
100
50
0
0 2 4 6 8 10 12
Gandaki Phoolbari
2500 Hydrograph
2000
1500
1000
500
0
0 1000 2000 3000 4000 5000 6000 7000 8000
Gandaki Phoolbari
Project Alignment