K15C L-1 Productivity Improvement
K15C L-1 Productivity Improvement
SKH M – Manesar
HIMALAYA
Quality Circle
HIMALAYA
“Work Hard, Have Fun, And
Make History”
Welcomes You
Passion to Win 2
SKH MARELLI EXHAUST SYSTEM PVT. LTD.
Manesar
Pune
K10C (Gasoline
/ CNG)
K15C
(Gasoline /
CNG)
YG8 (Gasoline/
CNG)
Passion to Win 4/87
Product Matrix
K15C Hot End (Catalaytic Converter)
K15C G
Manifold Exh .
K15C CNG
Manifold Exh
Passion to Win
Q C History
Passion to Win
Facilitator Members
HIMALAYA
Mr. Sandeep
Mr. Akash
Mr. Narender Yadav
Mr. Ankit
Passion to Win
Theme
K15C HE
Passion to win
Justification for theme
selection
2 problem Actual
Plan
3 Define Problem
Actual
Analysis of Plan
4 problem Actual
Identification Plan
5 of causes Do
Actual
Finding of Root Plan
Do
6 cause Actual
Plan
7 Data Analysis
Actual
Development Plan
8 of solution Actual
Trial Plan Check
9 implementation Actual
Check
Foreseeing Plan
10 Probable
Actual
Resistance
Regular Plan Act
11 implementation Actual
Act
Review of Plan
12
results Passion to Win
Actual
Activity Plan
ACT 3 PLAN 3
12
CHECK 2 DO 4
ATTENDANCE
TOTAL : 52 PRESENT: 50 %AGE - 96
Passion to Win
Background History of K15C Line 1 Hot End Line
Plan
Actual :
Target Oct 23 – 210 / Shift , PPH 2.62, Line Man Power 10/ Shift
Target Nov 23 – 220 / Shift , PPH 2.75, Line Man Power 10/ Shift
Target Dec 23 – 230 / Shift , PPH 2.87, Line Man Power 10/ Shift
STEP 1 STEP 2
Passion
STEP 3 STEP 4
to Win
STEP 5 STEP 6 STEP 7 STEP 8 STEP 9 STEP 10 STEP 11 STEP 12
Top Cost Factor of K15C Hot End
Profitability
Passion to Win
Categorization of Problems K15C Hot
End Line
Category
A B C
Passion to Win
Our Target
Productivity
3.5 250
2.87 230
3 240
2.5 230
2.62
2
220
1.5 210
1 210
0.5 200
0 Current Target PPH
190 Production Production
PPH Qty.Sept- Qty.Nov-23
23
PPH
Passion to Win
Selection of Problem
4 Dec-23 Profitability
230 2.87 21.76 6069473
K15C
Passion to Win
PROCESS FLOW K10C HOT END SA9 = CANNING
SA-
3
Cannin
g
SA1 = MIG Welding SA2 = TIG Welding of Half SA3 = MIG Welding of
of Half Shell Assy Shell Assy & I/L Flange Sensor Boss with SA2
ROBO CELL -1
SPM-2
ROBO CELL 3
Manual
Final Visual Final Inspection Leak Testing & batch Spatter T-Joint
Gauge code engraving Welding
Inspection Passion to Win Chipping
BRAIN STORMING
(Scenario 1)
To Achieve the Target of Nov-23
Productivity 2.75 PPH
220 Parts per Shift
Target Cycle Time required 106 Sec
Cycle Time Study -K15C Hot End
Actual
Output / Target Current Current
Total Cycle Shift @ Output / Actual Actual
S.No. Operation description time in 210 per Shift @ Output/Shi Output/Shi Shortage
secs shift 220 per ft @ 100% ft @ 85% against 220
requireme shift Efficiency Efficiency Parts/Shift
nt requireme
nt
STEP 1 STEP 2
Passion
STEP 3 STEP 4
to Win
STEP 5 STEP 6 STEP 7 STEP 8 STEP 9 STEP 10 STEP 11 STEP 12
Fish Bone for K15C Hot End
Line
Production
Line layout not
improvement
okay
Child Parts
dimension not
Machine Part okay
Chuter Lay Out
NVA Activity
Fitment issue
between cone
and inlet flange
Method Material
Passion to win
Fish Bone for K15C Hot End
Man Machine
Machine Cycle
Time 1 Valid cause identified
Operator
unawareness
Line
Production
Line layout not
improvement
okay
Child Parts
dimension not
Machine Part okay
Chuter Lay Out
NVA Activity
Fitment issue
between cone
and inlet flange
Method Material
Passion to win
Validation of Assignable Causes
This may be a
On Merge of valid cause
both Operation
Passion to win
Focus Area for Improvement
1. Robot Cell-2
Passion to Win
Brain storming : Machine Cycle Time Reduction
Machine cycle ti me
60
52
50 Machine Cycle Time (Sec)
40 Part loading 32
32 Part clamping 15
30
Curtain down 3
20
15 Welding time 52
10
3 3 4 Curtain Up 3
2
0 Auto Declamp 2
e ng n e up ng e
tim pi do
w tim i n pi tim
in
g la
m i n in
g rta la
m
in
g
ad rtc rta e ld Cu dec ad
l o Cu o
rt Pa W rt un
l
Pa Pa rt
Pa
Passion to win
Activity Plan
Clamping
Part clamping manually with should
particular clamping sequence in auto mode Dharmander / Lalit 15-Nov
be done
Passion to win
Improvement Activity:
Part clamping
Clamping
manually
should be
with Part Part
done in Dharmand
1 particular 15-Nov clamping clamping 5 Done
auto er / Lalit
clamping manually in auto
mode
sequence
Passion to win
After Implementation of all
solution
Passion to win 27
Deployment of Solution :
S.NO. CAUSE SOLUTION TRIAL IMPL. STATUS OK\NOT OK
Robot Cycle
(Machine
Line Cycle time be Time) reduce
reduce by 5 Sec by 5 sec & Process
OK
Cycle Time
from 111 Sec to Cycle Time One Shift prod.
validate &
1. 106 Sec reduce from (220 Nos.) Done
target
111 sec to 106 achieved
Sec
Passion to win
Improvement in Cycle Time
Before After
Cycle Time Study -K15C Hot End Cycle Time Study -K15C Hot End
Actual Current Current Actual Current Current
Output / Target Actual Actual Output / Target Actual Actual
Output / Shortage Total Shift @ Output / Output/ Output/ Shortage
Total Shift @ Output/S Output/S Cycle
S.No. Operation description Cycle time 210 per Shift @ hift @ hift @ against S.No. Operation description time in 210 per Shift @ Shift @ Shift @ against
in secs shift 220 per 100% 85% 220 shift 220 per 100% 85% 220
shift Parts/Shif secs shift Efficienc Parts/Shi
requirem Efficiency Efficiency require Efficienc
ent requirem t ment require y y ft
ent ment
1. ROBOT CELL-1 102 210 220 270 230 +10 1. ROBOT CELL-1 102 210 220 270 230 +10
2. ROBOT CELL-2 111 210 220 248 211 9 2. ROBOT CELL-2 106 210 220 260 221 +1
3. ROBOT CELL-3 105 210 220 262 223 +3 3. ROBOT CELL-3 105 210 220 262 223 +3
4 DED-1 72 210 220 383 325 +105 4 72
DED-1 210 220 383 325 +105
5 T-JOINT 59 210 220 467 397 +177 5 T-JOINT 59 210 220 467 397 +177
6 CHIPPING 96 210 220 287 244 +24 6 CHIPPING 96 210 220 287 244 +24
7 PRE-LEAKAGE 85 210 220 324 276 +56 7 PRE-LEAKAGE 85 210 220 324 276 +56
8 LTM 89 210 220 310 263 +43 8 LTM 89 210 220 310 263 +43
Cycle time operation wise(in sec) Cycle time operation wise(in sec)
111 105 102 106 105
102 96 96
85 89 85 89
72 72
59 59
-1 -2 -3 1 T G E -1 -2 -3 1 T G E
LL LL LL D- IN IN AG LT
M
LL LL LL D- IN IN AG LT
M
CE CE CE DE JO PP AK CE CE CE DE JO PP AK
T- I E T- I E 29
B OT B OT B OT CH
E-
L
B OT B OT B OT CH
E-
L
RO RO RO PR RO RO RO PR
Target Achieved :
PPH
Passion to win
BRAIN STORMING
(Scenario 2)
To Achieve the Target of Dec-23
Productivity 2.82 PPH
230 Parts per Shift
Target Cycle Time required 102 Sec
Cycle Time Study -K15C Hot End
Actual
Output / Target Current Current
Total Cycle Shift @ Output / Actual Actual
S.No. Operation description time in 220 per Shift @ Output/Shi Output/Shi Shortage
secs shift 230 per ft @ 100% ft @ 85% against 230
requireme shift Efficiency Efficiency Parts/Shift
nt requireme
nt
B OT B OT B OT C E-
L
8 LTM 89 220 230 310 263 +33 RO RO RO PR
STEP 1 STEP 2
Passion
STEP 3 STEP 4
to Win
STEP 5 STEP 6 STEP 7 STEP 8 STEP 9 STEP 10 STEP 11 STEP 12
Fish Bone for K15C Hot End
Man Machine
Machine Cycle 12 Possible causes identified
Time
Operator
unawareness
Line
Production
Line layout not
improvement
okay
Machine Part Child Parts
Chuter Lay Out dimension not
okay
Extra process
available at station
NVA Activity
Fitment issue
between cone
and inlet flange
Method Material
Passion to win
Fish Bone for K15C Hot End
Man Machine
Machine Cycle
Time 1 Valid cause identified
Operator
unawareness
Line
Production
Line layout not
improvement
okay
Machine Part Child Parts
Chuter Lay Out dimension not
okay
Extra process
available at station
NVA Activity
Fitment issue
between cone
and inlet flange
Method Material
Passion to win
Validation of Assignable Causes
This may be a
valid cause
Extra
Tacking should
1 Method
process
available at
CFT
Robot Cell 2
&3
Operation
sequence study
be done at T
joint station
station
Passion to win
Focus Area for Improvement
1. Robot Cell-2
2. Robot Cell-3
Passion to Win
Activity Plan
Passion to win
Improvement Activity:
Passion to win
After Implementation of all
solution
Passion to win 38
Deployment of Solution :
S.NO. CAUSE SOLUTION TRIAL IMPL. STATUS OK\NOT OK
Robot Cycle
(Machine
Line Cycle time be Time) reduce
reduce by 4 Sec by 4 sec & Process
OK
Cycle Time
from 106 Sec to Cycle Time One Shift prod.
validate &
1. 102 Sec reduce from (230 Nos.) Done
target
106 sec to 102 achieved
Sec
Passion to win
Improvement in Cycle Time
Before After
Cycle Time Study -K15C Hot End Cycle Time Study -K15C Hot End
Actual Current Current Actual Current Current
Output / Target Actual Actual Output / Target Actual Actual
Total
Total Shift @ Output / Output/S Output/S Shortage Shift @ Output / Output/ Output/ Shortage
Cycle
S.No. Operation description Cycle time 220 per Shift @ hift @ hift @ against S.No. Operation description time in 220 per Shift @ Shift @ Shift @ against
in secs shift 230 per 100% 85% 230 shift 230 per 100% 85% 230
secs
requirem shift Efficiency Efficiency Parts/Shif requirem shift Efficienc Efficienc Parts/Shi
ent requirem t ent requirem y y ft
ent ent
1. ROBOT CELL-1 102 220 230 270 230 0 1. ROBOT CELL-1 102 220 230 270 230 0
2. ROBOT CELL-2 106 220 230 248 221 9 2. ROBOT CELL-2 102 220 230 248 230 0
3. ROBOT CELL-3 105 220 230 262 223 7 3. ROBOT CELL-3 102 220 230 262 230 0
4 DED-1 72 220 230 383 325 +95 4 DED-1 72 220 230 383 325 +95
5 T-JOINT 59 220 230 467 397 +167 5 T-JOINT 59 220 230 467 397 +167
6 CHIPPING 96 220 230 287 244 +14 6 CHIPPING 96 220 230 287 244 +14
7 PRE-LEAKAGE 85 220 230 324 276 +46 7 PRE-LEAKAGE 85 220 230 324 276 +46
8 LTM 89 220 230 310 263 +33 8 LTM 89 220 230 310 263 +33
Cycle time operation wise(in sec) Cycle time operation wise(in sec)
102 106 105 102 102 102
96 89 96
85 85 89
72 72
59 59
-1 -2 -3 1 T E
LL LL LL D- IN NG AG LT
M -1 -2 -3 D-
1 T G GE M
CE CE CE DE JO PI LL LL LL IN IN KA LT
T- IP AK CE CE CE DE JO PP
OT OT OT CH -L
E T- CH
I
LE
A
40
B B B E B OT B OT B OT E-
RO RO RO PR RO RO RO PR
Target Achieved :
Productivity
230/shift
3.5
2.82
3 220/shift
2.5
2.75
2
1.5
1
0.5
0 Current PPH
PPH Target PPH
Passion to win
Activity Plan Vs Actual
PD MONTHS Oct-23 Nov-23 Dec-23
S. No. CA WEEKS 1 2 3 4 5 6 7 8 9 10 11 12
ACTIVITY
Plan
1 Problem identification
Actual
Plan
Plan
2 Selection of problem
Actual
Plan
3 Define Problem
Actual
Plan
4 Analysis of problem
Actual
Plan
5 Identification of causes
Actual
Plan
Do
Plan
12 Review of results
Actual
Passion to win
Result
Tangible Benefits:-
Production Target achieved 230 / Shift.
Cost Benefits:-
Passion to win
Intangible Benefits
Lean Manufacturing –
Line Balancing
Process Capability Improved
Confidence –
Presentation skills improved
Motivation –
Solve the problem at down level
Skill Level –
Uses of quality of tools
Team work –
Team spirit increased by
working together
Passion to win
Quality Tools Used in this Project
Passion to win
Passion For People