Amethi Work Progress PPT (09.06.2024)

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 24

PROGRESS PHOTOS -

AMETHI
DATE : 09.06.2024
ACADEMIC BLOCK

09-JUNE-2024

Column above Plinth Beam RCC completed


ACADEMIC BLOCK

09-JUNE-2024

1st floor level slab & roof beam Shuttering work in progress.
HOSPITAL BLOCK

09-JUNE-2024

Column above CF3 raft RCC work in progress


HOSPITAL BLOCK

09-JUNE-2024

Retaining wall RCC work in progress


BOYS HOSTEL

09-JUNE-2024

Column above plinth beam work in progress


BOYS HOSTEL

09-JUNE-2024

Column above plinth beam shuttering work in progress


BOYS INTERN HOSTEL

09-JUNE-2024

2nd Floor Level Slab & Roof Beam Shuttering work in progress
TYPE II RESIDENCE

09-JUNE-2024

3rd floor level slab & roof beam reinforcement work in progress.
TYPE III RESIDENCE

09-JUNE-2024

3rd Floor Level roof beam & slab shuttering work in progress.
TYPE IV RESIDENCE

09-JUNE-2024

Terrace Floor Level Roof Beam, Slab shuttering work in Progress.


TYPE V RESIDENCE

09-JUNE-2024

2nd Floor Level Roof Beam, Slab shuttering work in Progress.


GIRLS HOSTEL

09-JUNE-2024

Back Filling work in progress


GIRLS HOSTEL

09-JUNE-2024

Back Filling work in progress


GIRLS INTERN HOSTEL

09-JUNE-2024

1st Floor Level Roof beam shuttering work in progress


JUNIOR RESIDENCE

09-JUNE-2024

2nd Floor Level Roof Beam, Slab shuttering work in progress


SENIOR RESIDENCE

09-JUNE-2024

4th Floor Level Roof Beam, Slab RCC Work completed.


NURSES HOSTEL

09-JUNE-2024

1st Floor Level roof beam shuttering work in progress.


DIRECTOR RESIDENCE
09-JUNE-2024

1st Floor Level roof beam Shuttering work in Progress


BOUNDARY WALL – EAST DIRECTION

09-JUNE-2024

Paint Work in progress


BOUNDARY WALL – WEST DIRECTION

09-JUNE-2024

Paint Work in progress


BOUNDARY WALL – NORTH DIRECTION

09-JUNE-2024

Plaster Work Completed (Private Land)


BOUNDARY WALL – SOUTH DIRECTION

09-JUNE-2024

Painting Work in Progress